Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 2, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 80 Re-roof for sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer owens corning brand and model supreme color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) n/a specific exemption from cool roof requirements (if applicable) n/a required building inspector field verification (if applicable) verify cool roof - 0890-0014 note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 23, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2016-Resalt- |