Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Install photovoltaic system consisting of roof-top mounted panels & 1 inverter Date: February 15, 2011 Permit type: Other | Permit status: Plan review | Permit id: Spv11-0008 | |||||
SCORE 100 Install automatic earthquake gas shut-off valve. Little firefighter #agv-75. 3 4 inch pipe horizontal. (plumb.) Permit type: Plumbing | Permit status: Permit finaled | Completion date: August 31, 2016 | Expiration date: July 26, 2019 | Permit id: P16-0247 | |||||
SCORE 100 Window replacement - r/r 7 windows, like for like, size for size, aluminum for vinyl Permit type: Building | Permit status: Permit finaled | Completion date: September 8, 2016 | Expiration date: September 1, 2019 | Current use: Residential | Permit id: B16-0948 | |||||
SCORE 56 Kitchen remodel less than 3 sq. Ft. No structural changes - remove non-load bearing wall. R/r appliances. Sink, dw, and elec. Range remain same location. Move refrigerator across the room. Remove existing pantry. Fill-in existing pocket door adjacent to exising pantry. Change side-by-side w/d to stacked. Upgrade electrical per current code. New (5) ceiling light fixtures. Lower floor powder room - r/r w/ low-flow w/c. Add new exhaust fan and light w/ separate switches. Upgrade electrical per current code. Upper floor master bath - r/r lav. Add new light and exhaust fan w/ separate switches. Upgrade electical. Upgrade sub-panel. (bldg. Mech. Plumb.) Permit type: Building | Permit status: Permit finaled | Completion date: September 8, 2016 | Expiration date: July 25, 2019 | Current use: Residential | Permit id: Cb16-0617 |