Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Phase ii environmental site assessment for construction of a multi rise building. Phase ii will include drilling of 5 borings by hollow stem auger method. 3 of these borings will be drilled to 12 feet deep and will be converted to temporary wells, 2 borings will be drilled to feet, all borings approximately 6 inches in diameter. Temporary borings will be abandoned (grouted) within 24 hours of installation, investigation derived wastes (drill cuttings) will be containerized for off-site disposal. ![]() Client: Zuckerman Partners, Llc | Applicant: Kim Engineering, Inc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400183 | |||||
Plumbing and gas ![]() Client: Zp Georgia, Llc | Permit status: Completed | Permit id: P1508102 | |||||
SCORE 89 Interior only renovation of existing commercial retail space into carry out restaurant. Maximum of 34 seats and total occupant load 40, including staff. ![]() ![]() Client: Small Fry | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1410784 | |||||
SCORE 56 Phase ii environmental site assessment for construction of a multi rise building. Phase ii will include drilling of 5 borings by hollow stem auger method. 3 of these borings will be drilled to 12 feet deep and will be converted to temporary wells, 2 borings will be drilled to feet, all borings approximately 6 inches in diameter. Temporary borings will be abandoned (grouted) within 24 hours of installation, investigation derived wastes (drill cuttings) will be containerized for off-site disposal. ![]() ![]() Client: Zuckerman Partners, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400183 | |||||
SCORE 100 Plumbing and gas ![]() ![]() Client: Zp Georgia, Llc | Permit status: Permit issued | Permit id: P1506877 | |||||
SCORE 56 Phase ii environmental site assessment for construction of a multi rise building. Phase ii will include drilling of 5 borings by hollow stem auger method. 3 of these borings will be drilled to 12 feet deep and will be converted to temporary wells, 2 borings will be drilled to feet, all borings approximately 6 inches in diameter. Temporary borings will be abandoned (grouted) within 24 hours of installation, investigation derived wastes (drill cuttings) will be containerized for off-site disposal. ![]() ![]() Client: Zuckerman Partners, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400183 | |||||
SCORE 89 Interior only renovation of existing commercial retail space into carry out restaurant. Maximum of 34 seats and total occupant load 40, including staff. ![]() ![]() Client: Small Fry | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1410784 | |||||
SCORE 65 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) ![]() ![]() Client: Ali Bagheri | Permit type: Building | Permit status: Permit issued | Permit id: Pc37466511 | |||||
SCORE 100 Plumbing and gas ![]() ![]() Client: Zp Georgia, Llc | Permit status: Permit issued | Permit id: P1506877 | |||||
Plumbing and gas ![]() Client: Zp Georgia, Llc | Permit status: Completed | Permit id: P1508102 |