Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Zoning/use permit Client: Impact Services Corporati | Permit status: Completed | Permit id: 337531 | |||||
Electrical permit Client: Impact Services Corporati | Permit status: Completed | Permit id: 430412 | |||||
Alteration permit Client: Impact Services Corporati | Permit status: Completed | Permit id: 342124 | |||||
Permit for for the erection of a eleven(11) detached structures ; for a multi-family household living ( 45 dwelling units) with eleven(11) off-street parking spaces including with five(5) accessible spaces ; fifteen(15) bicycle spaces ( should be in an accessible route) size and location as shown in the application. Client: Impact Services Corporati | Applicant: Sarah Poindexter | Permit type: Appeal | Permit status: Withdrawn | Permit id: 26945 | |||||
Zoning use permit Client: Impact Services Corporati | Permit status: Completed | Permit id: 337531 | |||||
Electrical permit Client: Impact Services Corporati | Permit status: Completed | Permit id: 430412 | |||||
Alteration permit Client: Impact Services Corporati | Permit status: Completed | Permit id: 342124 | |||||
Permit for for the erection of a eleven(11) detached structures ; for a multi-family household living ( 45 dwelling units) with eleven(11) off-street parking spaces including with five(5) accessible spaces ; fifteen(15) bicycle spaces ( should be in an accessible route) size and location as shown in the application. Client: Impact Services Corporati | Applicant: Sarah Poindexter | Permit type: Appeal | Permit status: Withdrawn | Permit id: 26945 | |||||
SCORE 99 Installing a new lte equipment rack and pulling 1 dc cable to feed it from the existing power plant per 2008 nec (cell site) Client: Hayari Hussein | Permit type: Electrical permit | Permit status: Completed | Completion date: November 6, 2012 | Permit id: 430412 |