Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Equipment work Date: February 12, 2015 Contractor: Lachman Construction And De Permit status: Permit issued | Permit id: 32104072501 | |||||
SCORE 98 Plumbing Date: February 27, 2015 Contractor: Arco Plbg And Htg Inc Permit status: Permit issued | Permit id: 32104072501 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: May 29, 2013 Value: $644 Permit type: Delead | Permit id: Ed23508 | |||||
At apartment#2 bed room :properly reinstalled one window guard . Date: June 3, 2011 Value: $169 Permit type: Gc | Permit id: Eb33256 | |||||
L/l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursuant Date: August 5, 2011 Value: $106 Permit type: Delead | Permit id: Ec04213 | |||||
SCORE 100 Equipment work Date: May 8, 2014 Contractor: 1 Oak Contracting Llc Permit status: Permit issued | Permit id: 32092413001 | |||||
L l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursuant Date: August 5, 2011 Value: $106 Permit type: Delead | Permit id: Ec04213 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 19, 2010 Permit type: Delead | Permit id: Ea29046 | |||||
(apt #1r) at bathroom: trace and repair leak coming from above affecting the ceiling. Contractor must sign and return bid. Contractor must conta Date: May 15, 2009 Permit type: Gc | Permit id: E938230 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 me Date: August 3, 2007 Permit type: Delead | Permit id: E803326 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 2, 2011 Permit type: Delead | Permit id: Ec03769 | |||||
Apt 2r: as per the requirement contract with hpd, provide and install 2 window guards throughout entire apartment. Remove all work related debri Date: May 20, 2013 Permit type: Gc | Permit id: Ed22532 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 22, 2011 Permit type: Delead | Permit id: Ec05367 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 2, 2011 Permit type: Delead | Permit id: Ec03821 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 6, 2011 Permit type: Delead | Permit id: Ec06311 | |||||
Perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 14, 2011 Permit type: Delead | Permit id: Ec02502 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: July 11, 2013 Permit type: Delead | Permit id: Ee00526 | |||||
At apt#2r: remove and properly replace new wg at rm e-1 front bedroom at east-1 window . Install 2 stops. Remove all work related debris. Date: July 18, 2011 Permit type: Gc | Permit id: Ec02483 |