Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-8779 Date: October 8, 2003 Permit type: Util | Permit id: E406212 | |||||
As per secondary rc #2002001188305 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050 Date: April 2, 2003 Permit type: Delead | Permit id: E319505 | |||||
Supply and install a new clock thermostat with a locked tamper proof box at the appropriate location for proper temperature control. Note: contrac Date: January 12, 2005 Permit type: Heat | Permit id: E517443 | |||||
As per rc #20060012542 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: October 20, 2005 Permit type: Delead | Permit id: E611658 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-8779 Date: January 28, 2005 Permit type: Util | Permit id: E519575 | |||||
Apt. 1l) supply and install new copper tubing for hot and cold water supply lines. From basement to at bathroom and kitchen approx l. Ft. To rest Date: August 22, 2005 Permit type: Plumb | Permit id: E605512 | |||||
Provide single fuel drop with prime and start...# 2 fuel... Fill tank... Please report any problems immediately ot b. G. Singh at [212] 863 8740. Date: December 19, 2003 Permit type: Util | Permit id: E411116 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: January 31, 2002 Permit type: Util | Permit id: E213888 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completiom of drop or esb fu Date: January 7, 2003 Permit type: Util | Permit id: E312808 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: May 1, 2002 Permit type: Delead | Permit id: E219457 | |||||
Remove the bathroom ceiling at apt#. 1l & 2l ( sq. Ft.). Trace all leaks up to the 3rd floor (apt#. 3l), replace parts as needed. Repair all damag Date: April 23, 2002 Permit type: Gc | Permit id: E218585 | |||||
Apartment #1r: supply and install new g. W. B. In the bathroom ceiling and affected walls. Supply and install g. W. B. In the kitchen wall #3 where pipi Date: June 10, 2002 Permit type: Gc | Permit id: E221068 | |||||
(apt. #1r) at kitchen install 2 sets of stops , at bedroom install 2 sets of stops, and at bathroom install 1 set of stops. Remove all work related Date: December 27, 2007 Permit type: Gc | Permit id: E817210 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and upon completion of drop or esb fuel unit Date: April 25, 2003 Permit type: Util | Permit id: E321333 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Date: March 13, 2003 Permit type: Util | Permit id: E317838 | |||||
Apartment#1r: trace and repair all leaks affecting apt#1r bathroom. Replace parts as necessary. Restore all affected areas including painting. Date: February 11, 2003 Permit type: Gc | Permit id: E315098 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: July 27, 2005 Permit type: Delead | Permit id: E602919 | |||||
As per rc #2005001319003 (enviro-probe, inc.), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: July 18, 2005 Permit type: Delead | Permit id: E601903 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: June 13, 2005 Permit type: Delead | Permit id: E533958 | |||||
As per mini rc # k201272 (iatl) and hpd specification, perform phase contrast microscopy (pcm) analysis of 12 air samples for fiber content utilizing Date: May 7, 2002 Permit type: Asbest | Permit id: E219394 | |||||
Apartment #2l: wash down north east wall in kitchen with bleach and plaster and paint (2) coats with stain killer, 81 square feet. Note: contracto Date: December 6, 2002 Permit type: Gc | Permit id: E310457 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: March 21, 2002 Permit type: Util | Permit id: E216953 | |||||
Supply and install new oil fired steam boiler, peerless ect 06, with necessary steam and limit controls; and provisions for an eight gallon domestic w Date: April 15, 2002 Permit type: Heat | Permit id: E217495 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediatly to esb fuel unit. 212-863-8779 Date: February 4, 2004 Permit type: Util | Permit id: E414903 | |||||
Apartment#2l: open a section of bathroom ceilings of apt#2l and 2r. Trace and repair leaks from third story apts. Repair ceilings and remove mold a Date: February 4, 2003 Permit type: Gc | Permit id: E313562 | |||||
As per mini rc # k201272 (iatl) and hpd specification, perform polarized light microscopy (plm) analysis of 03 samples for asbestos content utilizing Date: May 2, 2002 Permit type: Asbest | Permit id: E219391 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: June 7, 2001 Permit type: Util | Permit id: E124359 | |||||
Perform asbestos abatement work as per hpd specification throughout boiler room, on 24 ft. Of pipe insulation including pipe joint insulation. Date: May 2, 2002 Permit type: Asbest | Permit id: E219393 | |||||
Clear stoppage from house trap out to street and from house trap into building. Pump out water and sewage and sanitize basement. Note: contractor Date: April 8, 2004 Permit type: Stopag | Permit id: E421045 | |||||
Repair leat at drain pipes at right - rear of cellar and replace parts as needed. Note: contract must contract hpd @ (718) 636-3035; 636-3037; 636 Date: June 2, 2003 Permit type: Plumb | Permit id: E323317 | |||||
Repair or replace the breeching at rear of boiler to chimney boiler room. Note: contractor must call lydia santos at (718) 254-89 or sharon jos Date: December 20, 2001 Permit type: Heat | Permit id: E210523 | |||||
Clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize basement with lime. Permit type: Plumb | Permit id: E316218 | |||||
SCORE 100 Equipment work Date: September 19, 2002 Contractor: East Coast Petroleum Permit status: Permit issued | Permit id: 30141007901 | |||||
SCORE 100 Plumbing Date: September 22, 2010 Contractor: Dg Mechanical Heating Inc Permit status: Permit issued | Permit id: 32020931401 | |||||
Clear main sewer house trap from trap to street and from house trap into building. Pump out water and sewage in basement. Sanitize basement. Clean Date: March 31, 2003 Permit type: Stopag | Permit id: E319045 | |||||
Locate broken or defective soil line at rear cellar in boiler room. Repair as necessary to correct problem. Note: contractor must call lydia sa Date: January 22, 2002 Permit type: Plumb | Permit id: E211355 | |||||
Con-ed-electric con-ed provide electricity to building public areas and heating plant hot water heater. Date: June 8, 2001 Permit type: Util | Permit id: E124409 | |||||
Public area: clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize base Date: January 13, 2003 Permit type: Stopag | Permit id: E313130 | |||||
Clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize basement with lim Date: December 20, 2001 Permit type: Stopag | Permit id: E210633 | |||||
Pump out cellar floor from house trap to start and back clear lines, then clean and sanitize cellar floor. Repair broken water line in boiler room ce Date: May 13, 2003 Permit type: Plumb | Permit id: E321928 | |||||
Clear main sewer line from house trap out to street and from house trap into main sewerline. Pump out approx. 2 water sewage throughout basement. Sp Date: January 2, 2001 Permit type: Stopag | Permit id: E110810 | |||||
(apt #1r) at the entire apartment: repair (2) window guard with stops and screws. Remove all work related debris Date: April 7, 2009 Value: $49 Permit type: Gc | Permit id: E934549 | |||||
(apt. #1r) at kitchen install 2 sets of stops , at bedroom install 2 sets of stops, and at bathroom install 1 set of stops. Remove all work related Date: April 1, 2008 Value: $91 Permit type: Gc | Permit id: E827877 | |||||
Apt 1l) at kitchen, bathroom and bedroom install window guard and one-screws. Date: November 8, 2006 Value: $111 Permit type: Gc | Permit id: E713050 | |||||
Apt 1r) at kitchen install one-way screws, bathroom install window guard and one-way screws, at bedroom install one-way screws. Date: November 8, 2006 Permit type: Gc | Permit id: E713047 | |||||
Apt 3l at bedrm #1 install window guards complete Date: April 28, 2006 Value: $223 Permit type: Gc | Permit id: E632267 | |||||
Public area remove discarded refriderator from 2nd fl public hallway Date: April 28, 2006 Value: $41 Permit type: Misc | Permit id: E632266 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: May 30, 2006 Permit type: Delead | Permit id: E635289 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: June 8, 2005 Value: $231 Permit type: Delead | Permit id: E533962 | |||||
(local law# 1 violation - clean only). Thoroughly re-clean the following areas as per new york city administrative code 27-2506. 11 and as noted in th Date: June 28, 2005 Value: $92 Permit type: Delead | Permit id: E535802 | |||||
Install (1) window guard and stop at kitchen. Reinstall (1) window guard at bathroom. Reinstall (2) window guard at bedroom. Date: April 18, 2005 Value: $176 Permit type: Gc | Permit id: E528748 | |||||
At bsmt: secure exposed electric in ceiling box. Date: April 7, 2004 Value: $172 Permit type: Elec | Permit id: E420925 | |||||
Apt # 2r kitchen: reinstall 1 window guard and stop. Bedroom: reinstall 2 window guards and stops. Date: June 10, 2003 Value: $157 Permit type: Gc | Permit id: E324490 | |||||
Apt # 1l bathroom: install 1 window guard and stop. Date: June 10, 2003 Value: $50 Permit type: Gc | Permit id: E324486 | |||||
Apt # 2l kitchen: reinstall 1 window guard and stop. Bedroom: reinstall 1 window guard and stop. Date: June 10, 2003 Value: $57 Permit type: Gc | Permit id: E324481 | |||||
Apartment #2l: front bedroom: install 1 window guard and stop. Date: February 27, 2003 Value: $103 Permit type: Gc | Permit id: E316806 | |||||
Erp ll/38 violation: as per attached scope of work thoroughly remove all lead violations as per new york city health section 173. 14 and as noted in t Date: March 24, 2003 Value: $1,211 Permit type: Delead | Permit id: E318669 | |||||
P/h. Replace 3 ballusters. Date: March 22, 2002 Value: $123 Permit type: Gc | Permit id: E217071 | |||||
Clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize basement with lime. Permit type: Plumb | Permit id: E316218 | |||||
SCORE 100 Date: September 19, 2002 Contractor: John Marrero Client: Eugene Mcardle | Client Address: 1 Gold St New York Ny 10038 | Client Phone: (212) 863-7720 | Client Company: Nyc Hpd | Permit status: Initial | Permit id: 301410079 | |||||
SCORE 100 Date: September 22, 2010 Contractor: Patrick Lynch Client: Jacob Davidowitz | Client Address: 117 Lee Avenue Brooklyn Ny 11211 | Client Phone: (917) 213-0101 | Client Company: Minotaur Realty Inc. | Permit status: Initial | Permit id: 320209314 | |||||
Clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize basement with lime. Permit type: Plumb | Permit id: E316218 | |||||
P h. Replace 3 ballusters. Date: March 22, 2002 Value: $123 Permit type: Gc | Permit id: E217071 | |||||
Erp ll 38 violation: as per attached scope of work thoroughly remove all lead violations as per new york city health section 173. 14 and as noted in t Date: March 24, 2003 Value: $1,211 Permit type: Delead | Permit id: E318669 | |||||
Clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize basement with lime. Permit type: Plumb | Permit id: E316218 | |||||
Clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water and sewage and sanitize basement with lime. Permit type: Plumb | Permit id: E316218 | |||||
Apartment#2r: trace and repair leak from apt#3r affecting ceiling af apt#2r. Supply and install sheetrock on ceiling (5x7) tape and compound and pai Date: May 7, 2003 Permit type: Gc | Permit id: E321016 | |||||
Erp ll/38 violation: as per rc #20020016278 (pdg) and attached scope of work thoroughly remove all lead violations as per new york city health sectio Date: May 14, 2003 Permit type: Delead | Permit id: E322309 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: October 28, 2002 Permit type: Util | Permit id: E308171 | |||||
Provide single fuel drop with prime and start. # 2 fuel. Fill tank. Please report any problems immediately to esb fuel unit [212] 863-5149. Date: March 26, 2004 Permit type: Util | Permit id: E419465 | |||||
As per mini rc #315239 (iatl), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method u Date: June 5, 2003 Permit type: Delead | Permit id: E323939 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fue Date: October 16, 2002 Permit type: Util | Permit id: E307210 | |||||
As per rc #2004000467901 (enviro-probe, inc.), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: July 8, 2004 Permit type: Delead | Permit id: E500119 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fue Date: February 6, 2003 Permit type: Util | Permit id: E315207 | |||||
Apartment #2r: wash down walls and ceiling in bathroom. Prime with stain killer and paint bathroom walls and ceiling approximately 135 square feet. Date: April 28, 2004 Permit type: Gc | Permit id: E422551 | |||||
As per mini rc #315239 (iatl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method u Date: June 5, 2003 Permit type: Delead | Permit id: E323941 | |||||
Erp ll 38 violation: as per rc #20020016278 (pdg) and attached scope of work thoroughly remove all lead violations as per new york city health sectio Date: May 14, 2003 Permit type: Delead | Permit id: E322309 |