Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of 5. 2kw pv installation service change ![]() ![]() Permit type: Electrical | Permit status: Permit closed | Completion date: January 9, 2014 | Expiration date: December 12, 2014 | Current use: Single family / duplex | Permit id: 6396079 |