Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior demolition of non-load bearing elements on the basement, 1st, 2nd, and 3rd floors as per plans. Date: June 3, 2013 Client: Washington International School | Applicant: Washington International School; Colin Clark | Permit type: Demolition | Permit status: Completed | Permit id: D1300528 | |||||
To restore the dacha house to its original interior state by removing the existing drywall partitions Date: June 27, 2013 Client: Washington International School Inc | Applicant: Capitol Property Development Llc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300620 | |||||
After hours for permit d1300528 for monday thru sunday for 7pm to 7 am to also include the 4th of july Date: July 3, 2013 Client: Washington International School | Applicant: Kim Mitchell Cdkm Consulting, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300704 | |||||
Plumbing and gas Date: July 17, 2013 Client: Washington International School Inc | Applicant: James D Mazzullo | Permit status: Completed | Permit id: P1306456 | |||||
Interior renovations to the basement, 1st, 2nd, and 3rd floors with a new kitchen to include electrical, mechanical, plumbing and structural work. Exterior work to inlcude new fencing, replacements of a exterior door and generator, and new louvers over three windows. No change in current use. Date: July 11, 2013 Client: Washington International School | Applicant: Colin Clark | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1305124 | |||||
Renovation of windows and replacement of doors in the mansion and in the cottage on the tregaron campus. Date: July 3, 2014 Client: Washington International School Inc | Applicant: Knox | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1408805 | |||||
Repair/replace existing exterior terrace at rear of building in kind. Date: September 11, 2014 Client: Washington International School Inc | Applicant: Knox | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1411853 | |||||
The work consists of the re-grading of an existing open lawn area. The area will be re-graded and returned to open lawn. Date: October 10, 2014 Client: Dale Temple | Applicant: Aaron Smith A. Morton Thomas And Assoc., Inc.; Sean Mason; Dale Temple | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400133 | |||||
Drilling air rotary 44 vertical geothermal wells 6 feet each single hdpe loop 1 1/2 inches on private property and trenching Date: March 28, 2014 Client: Dale Temple | Applicant: Neil Northern Virginia Drilling Inc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400196 | |||||
Drilling air rotary 2 geothermal test wells 6 ft each single loop 1 1/4 hdpe no trenching Date: January 24, 2014 Client: Dale Washington International School | Applicant: Neil Northern Virginia Drilling Inc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400120 | |||||
Electrical Date: June 12, 2014 Client: Washington International School Inc | Applicant: James C. Gyuras | Permit status: Completed | Permit id: E1406378 | |||||
Interior renovation to the cottage on the tregaron campus. Date: April 28, 2014 Client: Washington International School | Applicant: Knox | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1406418 | |||||
Interior renovation of the greenhouse Date: April 30, 2014 Client: Washington International School | Applicant: Knox | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1406419 | |||||
Interior renovation. Existing louver replacement and 2 window replacements (phase 2) replace fire alarm devices. Date: May 21, 2014 Client: Washington International School Inc | Applicant: Knox | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1405794 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Permit status: Completed | Permit id: P1406315 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Applicant: Gregory R Gosnell | Permit status: Completed | Permit id: P1406316 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Applicant: Gregory R Gosnell | Permit status: Completed | Permit id: P1406317 | |||||
SCORE 86 Electrical Date: July 18, 2013 Contractor: Larry V Mcdaniel Client: Washington International School Inc | Permit status: Completed | Permit id: E1306906 | |||||
SCORE 93 Mechanical Date: July 15, 2013 Contractor: Joseph T Fama Client: Washington International School Inc | Permit status: Completed | Permit id: M1302284 | |||||
SCORE 96 Mechanical Date: July 25, 2013 Contractor: James K Ashen Client: Washington International School Inc | Permit status: Permit issued | Permit id: M1302368 | |||||
SCORE 96 Plumbing and gas Date: July 15, 2013 Contractor: Stephen J. Exelbert Client: Washington International School Inc | Permit status: Completed | Permit id: P1306366 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2013 Contractor: James D Mazzullo Client: Washington International School Inc | Permit status: Completed | Permit id: P1306456 | |||||
Plumbing and gas Date: August 2, 2013 Client: Washington International School Inc | Permit status: Completed | Permit id: P1306907 | |||||
Plumbing and gas Date: July 18, 2013 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1306485 | |||||
SCORE 96 Electrical Date: June 12, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406378 | |||||
SCORE 96 Electrical Date: June 9, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406265 | |||||
SCORE 96 Electrical Date: June 9, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406266 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402318 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402319 | |||||
Plumbing and gas Date: July 2, 2014 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1406704 | |||||
SCORE 56 The work consists of the re-grading of an existing open lawn area. The area will be re-graded and returned to open lawn. Date: October 10, 2014 Client: Dale Temple | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400133 | |||||
SCORE 96 After hours for permit d1300528 for monday thru sunday for 7pm to 7 am to also include the 4th of july Date: July 3, 2013 Contractor: Kim Mitchell Cdkm Consulting Llc Client: Washington International School | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300704 | |||||
SCORE 86 Electrical Date: July 18, 2013 Contractor: Larry V Mcdaniel Client: Washington International School Inc | Permit status: Completed | Permit id: E1306906 | |||||
SCORE 96 Mechanical Date: July 25, 2013 Contractor: James K Ashen Client: Washington International School Inc | Permit status: Permit issued | Permit id: M1302368 | |||||
SCORE 93 Mechanical Date: July 15, 2013 Contractor: Joseph T Fama Client: Washington International School Inc | Permit status: Completed | Permit id: M1302284 | |||||
Plumbing and gas Date: July 18, 2013 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1306485 | |||||
SCORE 96 Plumbing and gas Date: July 15, 2013 Contractor: Stephen J. Exelbert Client: Washington International School Inc | Permit status: Completed | Permit id: P1306366 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2013 Contractor: James D Mazzullo Client: Washington International School Inc | Permit status: Completed | Permit id: P1306456 | |||||
SCORE 96 Electrical Date: June 12, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406378 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402318 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402319 | |||||
Plumbing and gas Date: July 2, 2014 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1406704 | |||||
SCORE 56 Interior demolition of non-load bearing elements on the basement, 1st, 2nd, and 3rd floors as per plans. Date: June 3, 2013 Contractor: Washington International School Colin Clark Client: Washington International School | Permit type: Demolition | Permit status: Completed | Permit id: D1300528 | |||||
SCORE 56 The work consists of the re-grading of an existing open lawn area. The area will be re-graded and returned to open lawn. Date: October 10, 2014 Client: Dale Temple | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400133 | |||||
SCORE 56 1. Strengthen and repair historic bridge to current standards. Work will be done without aesthetic alteration. 2. Drainage improvements include trench drain, cobble gutter, inlets, end section, outlet protection, and 174 ft of 12-inch rcp pipe. Date: June 7, 2016 Client: Dale Temple | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1606088 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402318 | |||||
Plumbing and gas Date: July 2, 2014 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1406704 | |||||
SCORE 100 Interior renovations to the basement, 1st, 2nd, and 3rd floors with a new kitchen to include electrical, mechanical, plumbing and structural work. Exterior work to inlcude new fencing, replacements of a exterior door and generator, and new louvers over three windows. No change in current use. Date: July 11, 2013 Contractor: Colin Clark Client: Washington International School | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1305124 | |||||
SCORE 56 Interior demolition of non-load bearing elements on the basement, 1st, 2nd, and 3rd floors as per plans. Date: June 3, 2013 Contractor: Washington International School; Colin Clark Client: Washington International School | Permit type: Demolition | Permit status: Completed | Permit id: D1300528 | |||||
SCORE 67 To restore the dacha house to its original interior state by removing the existing drywall partitions Date: June 27, 2013 Contractor: Capitol Property Development Llc Client: Washington International School Inc | Permit type: Demolition | Permit status: Permit issued | Permit id: D1300620 | |||||
SCORE 93 Interior renovation to the cottage on the tregaron campus. Date: April 28, 2014 Contractor: Knox Client: Washington International School | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406418 | |||||
SCORE 93 Interior renovation of the greenhouse Date: April 30, 2014 Contractor: Knox Client: Washington International School | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406419 | |||||
SCORE 93 Interior renovation. Existing louver replacement and 2 window replacements (phase 2) replace fire alarm devices. Date: May 21, 2014 Contractor: Knox Client: Washington International School Inc | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1405794 | |||||
SCORE 93 Renovation of windows and replacement of doors in the mansion and in the cottage on the tregaron campus. Date: July 3, 2014 Contractor: Knox Client: Washington International School Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1408805 | |||||
SCORE 96 After hours for permit d1300528 for monday thru sunday for 7pm to 7 am to also include the 4th of july Date: July 3, 2013 Contractor: Kim Mitchell Cdkm Consulting, Llc Client: Washington International School | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300704 | |||||
SCORE 86 Electrical Date: July 18, 2013 Contractor: Larry V Mcdaniel Client: Washington International School Inc | Permit status: Completed | Permit id: E1306906 | |||||
Plumbing and gas Date: July 18, 2013 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1306485 | |||||
SCORE 96 Plumbing and gas Date: July 15, 2013 Contractor: Stephen J. Exelbert Client: Washington International School Inc | Permit status: Completed | Permit id: P1306366 | |||||
SCORE 96 Plumbing and gas Date: July 17, 2013 Contractor: James D Mazzullo Client: Washington International School Inc | Permit status: Completed | Permit id: P1306456 | |||||
Plumbing and gas Date: August 2, 2013 Client: Washington International School Inc | Permit status: Completed | Permit id: P1306907 | |||||
SCORE 93 Mechanical Date: July 15, 2013 Contractor: Joseph T Fama Client: Washington International School Inc | Permit status: Completed | Permit id: M1302284 | |||||
SCORE 96 Mechanical Date: July 25, 2013 Contractor: James K Ashen Client: Washington International School Inc | Permit status: Permit issued | Permit id: M1302368 | |||||
SCORE 56 The work consists of the re-grading of an existing open lawn area. The area will be re-graded and returned to open lawn. Date: October 10, 2014 Client: Dale Temple | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1400133 | |||||
SCORE 96 Electrical Date: June 12, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406378 | |||||
SCORE 96 Electrical Date: June 9, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406265 | |||||
SCORE 96 Electrical Date: June 9, 2014 Contractor: James C. Gyuras Client: Washington International School Inc | Permit status: Completed | Permit id: E1406266 | |||||
Plumbing and gas Date: July 2, 2014 Client: Washington International School Inc | Permit status: Permit issued | Permit id: P1406704 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402319 | |||||
SCORE 86 Mechanical Date: June 20, 2014 Contractor: Joel S Knight Client: Washington International School Inc | Permit status: Completed | Permit id: M1402318 | |||||
SCORE 86 A total of two 6-inch diameter soil test borings will be drilled using 2. 25-inch continuous hollow stem flight augers. The borings will extend to a maximum depth of feet below current site grades using a truck-mounted drill rig. Upon completion of the drilling, the boreholes will be grouted with bentonite slurry 2 lbs of bentonite to 1 gallon of water and the auger cuttings and all other investigation derived waste idw will be containerized in sealed drums per ddoe permit. Date: March 30, 2015 Contractor: Dmy Engineering Consultants Inc Client: Tregaron Conservancy | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500228 | |||||
SCORE 56 Repair and replace existing stone staircase with handrails. Date: March 29, 2016 Client: N&a Washington International School | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1606242 | |||||
SCORE 56 1. Strengthen and repair historic bridge to current standards. Work will be done without aesthetic alteration. 2. Drainage improvements include trench drain, cobble gutter, inlets, end section, outlet protection, and 174 ft of 12-inch rcp pipe. Date: June 7, 2016 Client: Dale Temple | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1606088 | |||||
SCORE 93 Repair/replace existing exterior terrace at rear of building in kind. Date: September 11, 2014 Contractor: Knox Client: Washington International School Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1411853 | |||||
SCORE 83 Drilling air rotary 2 geothermal test wells 6 ft each single loop 1 1/4 hdpe no trenching Date: January 24, 2014 Contractor: Neil Northern Virginia Drilling Inc Client: Dale Washington International School | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400120 | |||||
SCORE 83 Drilling air rotary 44 vertical geothermal wells 6 feet each single hdpe loop 1 1/2 inches on private property and trenching Date: March 28, 2014 Contractor: Neil Northern Virginia Drilling Inc Client: Dale Temple | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400196 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Permit status: Completed | Permit id: P1406315 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Permit status: Completed | Permit id: P1406315 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Permit status: Completed | Permit id: P1406315 | |||||
Plumbing and gas Date: June 17, 2014 Client: Washington International School Inc | Permit status: Completed | Permit id: P1406315 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406316 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406316 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406316 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406316 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406317 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406317 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406317 | |||||
SCORE 82 Plumbing and gas Date: June 17, 2014 Contractor: Gregory R Gosnell Client: Washington International School Inc | Permit status: Completed | Permit id: P1406317 |