Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Varian medical systems: install a 5 kva medium voltage switch bewtween an (e) transformer and (e) switch gear. Date: October 9, 2012 Contractor: Rosendin Electric, Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02536 | |||||
SCORE 93 Commercial: install (3) dual head ev chargers in (e) parking lot level 2 Date: February 17, 2016 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-00368 | |||||
SCORE 93 Ti for existing tenant "varian medical systems inc" 885 sf. Remodel office lobby including new lights and new electrical outlets. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-03314 | |||||
SCORE 96 Replace two (2) air handlers on the roof. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03201 | |||||
SCORE 64 Varian building 4 first floor ~ 1366 sf: ti. Includes (3) (n) offices, (1) meeting room, open office area, add (2) vav boxes to (e) hvac sytem, (n) ceiling and light fixtures. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-01175 | |||||
SCORE 64 Building 4 first floor varian: interior non-structural demo in first floor. ~ 1214 sf Date: April 18, 2014 Contractor: J L Carter Construction Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00921 | |||||
SCORE 96 Replace (e) boiler in same location, mechanical room. Date: June 24, 2013 Contractor: Therma Corporation Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01664 | |||||
SCORE 93 Varian: (n) 349 sf storage mezanine at the first floor for the existing tenant. Date: October 30, 2012 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02710 | |||||
SCORE 93 11-3019: bulletin 6, revise truncated dome layout. Change driveway between two parking lots at east end of service drive to a curb. Change lighting add a drinking fountain Date: December 21, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00712 | |||||
Commercial sewer line replacement to main connection in street. Permit type: Project - building permit | Permit status: Routed | Permit id: 12000-03103 | |||||
Varian medical systems: install a 5 kva medium voltage switch bewtween an (e) transformer and (e) switch gear. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02536 | |||||
SCORE 93 11000-03019: deferred submittal, design bld stair #1,2 &3 Date: July 25, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00409 | |||||
SCORE 93 Varian: commercial remodel ~2500sf Date: October 9, 2012 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02533 | |||||
Varian medical systems: install a 5 kva medium voltage switch bewtween an (e) transformer and (e) switch gear. Date: October 9, 2012 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02536 | |||||
Commercial sewer line replacement to main connection in street. Date: December 20, 2012 Permit type: Project - building permit | Permit status: Routed | Permit id: 12000-03103 | |||||
SCORE 96 Varian: chilled water piping from the (e) to chiller to connect to (e) water piping and add new rooftop sleepers. Install hot water branch for new building Date: June 12, 2012 Contractor: Therma Corporation Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01354 | |||||
SCORE 96 Manufacturing process chilled water system modification. Includes rooftop equipment. Date: August 13, 2012 Contractor: Therma Corporation Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01986 | |||||
SCORE 93 11000-03019: relocating transformer, plumbing revisions per cpa inspector, steel at excercise room ceiling. Date: July 12, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00389 | |||||
Install (n) gas monitoring panel and connect an existing hydrogen shut off valve & seismic switches to the new gmp Date: June 1, 2012 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01269 | |||||
SCORE 93 11-3019:varian medical: opening in floor added near stair #1, mechanical equipment revised. Kitchen equipment and drains relocated. Relocate elevator controll room. Eliminate prep room #2. Miscelaneous interior revisions for all trades coordination. Date: March 28, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00186 | |||||
SCORE 96 11-3272: revise structural detail. Date: May 29, 2012 Contractor: Xl Construction Corporation Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00286 | |||||
SCORE 93 Temporary construction power. Date: February 2, 2012 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00264 | |||||
SCORE 94 Commercial reroof: install cold apply bur roofing o/ (e) sheathing. Tremco roofing to comply with ul report Date: April 20, 2012 Contractor: Waterproofing Associates Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00915 | |||||
SCORE 93 Install 3 new dual head level 2 charging stations at the existing parking stalls. 5 17 16: routed a revised landscape page to kelsey Date: May 11, 2016 Contractor: James R Griffin Inc Permit type: Project - building permit | Permit status: Approved | Permit id: 16000-01129 | |||||
SCORE 86 Install (n) gas monitoring panel and connect an existing hydrogen shut off valve & seismic switches to the new gmp Date: June 1, 2012 Contractor: Grodonprill, Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01269 | |||||
SCORE 95 Commercial sewer line replacement to main connection in street. Date: December 20, 2012 Contractor: Rotorooter Permit type: Project - building permit | Permit status: Routed | Permit id: 12000-03103 | |||||
SCORE 93 11-3019: bulletin 4 and 5, delta 9 and - room 234/235 operable partition deleted, assessment rm 221 relocated, trash compactor & enclosure on site deleted, finish plans a11. 1 a11. 2 added. Wall configuration changed to add rooms 234, 235, 236 and 237. Date: August 30, 2012 Contractor: James R Griffin Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00495 |