Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Date: March 29, 2012 Contractor: Corinthian Contractors Inc Permit type: Excavation; sewer lateral connection to 4" (trench) | Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | |||||
SCORE 99 Refer to approved traffic control plan (tcp) for permitted hours of work; dc water lead replacement contract #1000 - corinthian contractors is the contractor; excavation and removal of existing lead service and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard; attached plans and conditiona are part of this permit Date: April 4, 2012 Contractor: Corinthian Contractors Inc Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: September 10, 2012 | Permit id: Pa70973 | |||||
SCORE 100 Construction staging area Date: July 12, 2012 Contractor: Dcwater Permit status: Expired | Expiration date: August 10, 2012 | Permit id: Pa10065882 | |||||
SCORE 99 Excavation; repair water service lateral Date: July 12, 2012 Contractor: Corinthian Contractors Inc Permit status: 8 | Expiration date: September 10, 2012 | Permit id: Pa70973 | |||||
SCORE 99 Excavation; sewer lateral connection to 4" (trench) Contractor: Corinthian Contractors Inc Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 100 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Contractor: Dcwater Ops Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 86 Refer to approved traffic control plan (tcp) for permitted hours of work; dc water lead replacement contract #1000 - corinthian contractors is the contractor; excavation and removal of existing lead service and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard; attached plans and conditiona are part of this permit Date: July 12, 2012 Contractor: Dcwater Ops Corinthian Contractor Permit status: Permit expired | Expiration date: September 10, 2012 | Permit id: Pa70973 | |||||
SCORE 99 Excavation; sewer lateral connection to 4" (trench) Contractor: Corinthian Contractors Inc Permit status: 3 | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 96 Steel plate- single location Date: July 31, 2012 Contractor: Capitol Paving Of Dc, Inc Permit status: Expired | Expiration date: August 4, 2012 | Permit id: Pa10068085 | |||||
SCORE 100 Staging of materials for and construction, excavation and removal of existing lead and install replacement copper water service 1" line in public space, in street, sidewalk, tree-space, and yard. Period of occupancy for construction of service line will not exceed 2 days. Contractor: Dcwater Ops Permit status: Cancel/withdrawn | Expiration date: August 31, 2012 | Permit id: 0 | |||||
SCORE 99 Other reserved parking Date: September 25, 2017 Contractor: William Callahan Permit status: Permit expired | Expiration date: October 3, 2017 | Permit id: Pa10465541 |