Building Permits at 302 N 78th St Seattle WA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 302 N 78th St Seattle WA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Construct alterations to 2nd story in an existing church for a limited use emergency shelter (compass) per plans.
Date:  September 30, 2015
Value:   $58,864

Applicant: Starr, Scott | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6497122
2015/09/305886495302 N 78th St Seattle Wa
SCORE
100
Remove 15 exit signs and reinstall 15 led exit signs
Date:  July 27, 2009

Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2009 | Expiration date: July 27, 2010 | Current use: Commercial | Permit id: 6222540
2009/07/270100302 N 78th St Seattle WaSouthgate Electric Inc
SCORE
100
Replace existing boiler
Date:  September 18, 2002

Applicant: Fischer Plumbing Co Inc, The | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: September 18, 2002 | Expiration date: March 18, 2004 | Current use: Commercial | Permit id: 6003996
2002/09/180100302 N 78th St Seattle WaFischer Plumbing Co Inc The
SCORE
95
Media circuits power screen music controller
Date:  November 21, 2016

Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2016 | Expiration date: November 21, 2017 | Current use: Commercial | Permit id: 6568181
2016/11/21095302 N 78th St Seattle WaKemly Electric Incorporated
SCORE
95
Replace existing boiler
Date:  September 18, 2002

Applicant: Fischer Plumbing Co Inc, The | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: September 18, 2002 | Expiration date: March 18, 2004 | Current use: Commercial | Permit id: 6003996
2002/09/18095302 N 78th St Seattle WaFischer Plumbing Co Inc, The
SCORE
100
Remodel of womans shelter area 12/22/15 hkh; add lv devices and 1 lv control unit. Add joint venture with integrity home integration
Date:  November 11, 2015
Contractor: Active Engineering

Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2015 | Expiration date: November 10, 2016 | Current use: Commercial | Permit id: 6504539
2015/11/110100302 N 78th St Seattle WaActive Engineering
SCORE
95
Replace light switch panels, two locations - 1 0. 0. 2 replace relays as needed, four included - 1 0. 0. 3 add electrical receptacles, cut plaster as needed to flush mount receptacles, fish if accessible below and possible. Installed on existing circuits. A. 3 on east wall b. 3 on west wall c. 2 in front of sanctuary, one behind organ and one behind pulpit. D. 2 into wooden stairs going up to alter. - 1 0. 0. 4 provide and install led floods to existing spots at alter. - 1 0. 0. 5 add sconce fixture locations and 3 way switching, open walls as needed to install flush on walls, there will likely need to be some surface mounted emt to get to switch locations and to get from the east side to the west side. A. 3 on west wall b. 3 on east wall - 1 0. 0. 6 swap stairwell fixture - 1 0. 0. 7 install two recessed lights and led retrofit kits in overhang in back of sanctuary, cans and retrofit kits furnished by exact. - 1 0. 0. 8 run two dedicated circuits to break area for a microwave and a co
Date:  September 21, 2015
Contractor: Exact Electric Llc

Permit type: Electrical | Permit status: Permit closed | Completion date: March 28, 2016 | Expiration date: September 20, 2016 | Current use: Commercial | Permit id: 6495745
2015/09/21095302 N 78th St Seattle WaExact Electric Llc
SCORE
95
200a/240v 1ph panel change
Date:  July 9, 2015
Contractor: Exact Electric Llc

Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2015 | Expiration date: July 8, 2016 | Current use: Commercial | Permit id: 6483529
2015/07/09095302 N 78th St Seattle WaExact Electric Llc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.