Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Construct alterations to 2nd story in an existing church for a limited use emergency shelter (compass) per plans. Date: September 30, 2015 Value: $58,864 Applicant: Starr, Scott | Permit type: Construction | Permit status: Permit closed | Current use: Institutional | Permit id: 6497122 | |||||
SCORE 100 Remove 15 exit signs and reinstall 15 led exit signs Date: July 27, 2009 Contractor: Southgate Electric Inc Permit type: Electrical | Permit status: Permit closed | Completion date: August 20, 2009 | Expiration date: July 27, 2010 | Current use: Commercial | Permit id: 6222540 | |||||
SCORE 100 Replace existing boiler Date: September 18, 2002 Contractor: Fischer Plumbing Co Inc The Applicant: Fischer Plumbing Co Inc, The | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: September 18, 2002 | Expiration date: March 18, 2004 | Current use: Commercial | Permit id: 6003996 | |||||
SCORE 95 Media circuits power screen music controller Date: November 21, 2016 Contractor: Kemly Electric Incorporated Permit type: Electrical | Permit status: Permit closed | Completion date: December 5, 2016 | Expiration date: November 21, 2017 | Current use: Commercial | Permit id: 6568181 | |||||
SCORE 95 Replace existing boiler Date: September 18, 2002 Contractor: Fischer Plumbing Co Inc, The Applicant: Fischer Plumbing Co Inc, The | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: September 18, 2002 | Expiration date: March 18, 2004 | Current use: Commercial | Permit id: 6003996 | |||||
SCORE 100 Remodel of womans shelter area 12/22/15 hkh; add lv devices and 1 lv control unit. Add joint venture with integrity home integration Date: November 11, 2015 Contractor: Active Engineering Permit type: Electrical | Permit status: Permit closed | Completion date: December 22, 2015 | Expiration date: November 10, 2016 | Current use: Commercial | Permit id: 6504539 | |||||
SCORE 95 Replace light switch panels, two locations - 1 0. 0. 2 replace relays as needed, four included - 1 0. 0. 3 add electrical receptacles, cut plaster as needed to flush mount receptacles, fish if accessible below and possible. Installed on existing circuits. A. 3 on east wall b. 3 on west wall c. 2 in front of sanctuary, one behind organ and one behind pulpit. D. 2 into wooden stairs going up to alter. - 1 0. 0. 4 provide and install led floods to existing spots at alter. - 1 0. 0. 5 add sconce fixture locations and 3 way switching, open walls as needed to install flush on walls, there will likely need to be some surface mounted emt to get to switch locations and to get from the east side to the west side. A. 3 on west wall b. 3 on east wall - 1 0. 0. 6 swap stairwell fixture - 1 0. 0. 7 install two recessed lights and led retrofit kits in overhang in back of sanctuary, cans and retrofit kits furnished by exact. - 1 0. 0. 8 run two dedicated circuits to break area for a microwave and a co Date: September 21, 2015 Contractor: Exact Electric Llc Permit type: Electrical | Permit status: Permit closed | Completion date: March 28, 2016 | Expiration date: September 20, 2016 | Current use: Commercial | Permit id: 6495745 | |||||
SCORE 95 200a/240v 1ph panel change Date: July 9, 2015 Contractor: Exact Electric Llc Permit type: Electrical | Permit status: Permit closed | Completion date: July 15, 2015 | Expiration date: July 8, 2016 | Current use: Commercial | Permit id: 6483529 |