Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp Date: October 17, 2013 Permit status: Closed | Permit id: 13-06032 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-06032 | Parcel: 1946908 | |||||
SCORE 95 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-06032 | Parcel: 1946908 | |||||
October 1, 2013 10:01:02 am jjames. Move new home and setup of mobile home in wellington mhp; october 17, 2013 8:41:55 am ssalyer. No premise number given have not called duke;sls; october 17, 2013 8:41:38 am ssalyer. Move new home and setup of mobile home in wellington mhp;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste l Permit type: Permits - historical | Permit status: Closed | Permit id: 13-06032 | Parcel: 1946908 | |||||
Wellington mhp Date: October 17, 2013 Value: $27,925 Permit type: Historical | Permit status: Closed | Permit id: 13-06032 | |||||
October 1, 2013 10:01:02 am jjames. Move new home and setup of mobile home in wellington mhp; october 17, 2013 8:41:55 am ssalyer. No premise number given have not called duke;sls; october 17, 2013 8:41:38 am ssalyer. Move new home and setup of mobile home in wellington mhp;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste l Date: October 17, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-06032 | Parcel: 1946908 |