Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Construction of a sfd, 4,438 sf finished (including finished basement), attached garage of 387 sf, 144 sf of covered front porch. Three bedrooms, two full bathrooms, one 3 4 bathrooms, one powder room. Revised scope of work to reduce home size. Client: Verde Terra | Applicant: Silver Lining Builders | Permit type: Building, electrical | Permit status: Co | Current use: Single family d | |||||
SCORE 95 Construction of a detached studio, 361 sf. Client: Verde Terra | Applicant: Silver Lining Builders | Permit type: Building, electrical | Permit status: Co | Current use: Single family d | |||||
SCORE 95 Demolition of an accessory structure, 5 sf, built 1961. See his2009-00121 Date: July 10, 2009 Contractor: Silver Lining Builders Client: Verde Terra | Applicant: Silver Lining Builders | Permit type: Demolition | Permit status: Cmp | Completion date: October 26, 2012 | |||||
SCORE 95 Temporary set-up of concrete pumper truck in row - sidewalk closure reqfootd Date: October 30, 2009 Contractor: Silver Lining Builders Client: Verde Terra | Applicant: Silver Lining Builders | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of 9. 45 kw rooftop photovoltaic solar system on single-family residence. Date: March 11, 2010 Contractor: Namaste Solar Electric Inc Client: Verde Terra | Applicant: Namaste Solar Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 8, 2010 | Current use: Single family d | |||||
SCORE 65 Tap install new water, (1inch), and sewer, (4inch), services to subdivided lot. (see pmt2009-02631 for fees and meter) Date: March 22, 2010 Contractor: Pbm Excavating Co Client: Verde Terra | Applicant: Pbm Excavating Co. | Permit type: Water, wastewater, r | Permit status: Iss | |||||
SCORE 95 R r 1 lf curbwalk on 15th street and cedar street. Work on cedar to be completed 8 2-8 4 and work on 15th street to be completed several weeks later. Date: July 28, 2010 Contractor: Norris Concrete Contractors Llc Client: Verde Terra | Applicant: Norris Concrete Contractors Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Install new gas service to house Date: August 9, 2010 Contractor: Xcel Energy Client: Verde Terra | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Abandon existing, unused 3 4inch water service and meter. Abandon at main Date: August 16, 2010 Contractor: Nixcavating Inc Client: Verde Terra | Applicant: Nixcavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Construction of a sfd, 4,438 sf finished (including finished basement), attached garage of 387 sf, 144 sf of covered front porch. Three bedrooms, two full bathrooms, one 3 4 bathrooms, one powder room. Revised scope of work to reduce home size. Client: Verde Terra | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Single family detached dwelling, new | Permit id: Pmt2009-02631 | |||||
SCORE 95 Construction of a detached studio, 361 sf. Client: Verde Terra | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02633 | |||||
SCORE 95 Installation of 9. 45 kw rooftop photovoltaic solar system on single-family residence. Client: Verde Terra | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 8, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00893 | |||||
Install new gas service to house Date: August 9, 2010 Client: Verde Terra | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-03263 | |||||
SCORE 95 Abandon existing, unused 3 4inch water service and meter. Abandon at main Date: August 16, 2010 Contractor: Nixcavating, Inc Client: Verde Terra | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-03437 |