Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] install 7. 56 kw solar system on roof Date: May 19, 2014 Contractor: Solterra Systems Permit type: Electrical | Permit status: Permit closed | Completion date: June 4, 2014 | Expiration date: May 19, 2015 | Current use: Single family / duplex | Permit id: 6418514 |