Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Moving truck Date: November 9, 2012 Contractor: Jeffrey Chelsky Permit status: Expired | Expiration date: November 29, 2012 | Permit id: Pa10078536 | |||||
SCORE 64 Moving storage container Date: November 26, 2012 Contractor: Jeffrey Chelsky Permit status: Expired | Expiration date: December 3, 2012 | Permit id: Pa10079755 | |||||
SCORE 95 Construction staging area Date: September 25, 2012 Contractor: Pepco Holdings Inc Permit status: Expired | Expiration date: October 25, 2012 | Permit id: Pa10073427 | |||||
SCORE 95 Make necessary excavation to install 11 of service conduit and miscellaneous equipment to 2819 11th st, nw, as indicated on the attached approved prints. Wr #3391004; ward 1; cut #27581; tcp #3; robert brown/202-388-2602/rcbrown@pepco. Com (racm). Wmata approval must be obtained before construction to relocate bus stop. Date: August 17, 2012 Contractor: Pepco Holdings Inc Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: November 8, 2012 | Permit id: Pa74577 | |||||
SCORE 95 Make necessary excavation to install 11 of service conduit and miscellaneous equipment to 2819 11th st, nw, as indicated on the attached approved prints. Wr #3391004; ward 1; cut #27581; tcp #3; robert brown 202-388-2602 rcbrown@pepco. Com (racm). Wmata approval must be obtained before construction to relocate bus stop. Date: September 5, 2012 Contractor: Pepco Holdings Inc Permit status: Permit expired | Expiration date: November 8, 2012 | Permit id: Pa74577 | |||||
SCORE 56 Moving truck Date: January 2, 2017 Contractor: Richard Shin Permit status: Permit expired | Expiration date: January 7, 2017 | Permit id: Pa10370985 |