Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 1, 2013 Contractor: Brian Milholland Permit type: Electrical : 8002 - | Permit status: Permit finaled | Completion date: December 5, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 1, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 5, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 1, 2013 Contractor: Milholland Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 5, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: October 27, 2017 Contractor: Oak Island Heating And Air Conditioning Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: December 2, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |