Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Excavate at rear of curb & base of pole in grass area to place turn-ups on existing poles; place innerduct in sections for fttp overlay plan in "fios drawdown acct" this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Date: February 22, 2012 Contractor: Verizon Inc Permit type: Excavation; repair telecom ml conduit | Permit status: Permit expired | Expiration date: September 14, 2012 | Permit id: Pa69618 | |||||
SCORE 95 Construction staging area Date: March 21, 2012 Contractor: Verizon Verizon Permit status: Expired | Expiration date: April 25, 2012 | Permit id: Pa10053207 | |||||
SCORE 88 Excavate at rear of curb & base of pole in grass area to place turn-ups on existing poles; place innerduct in sections for fttp overlay plan in "fios drawdown acct" this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Date: March 6, 2012 Contractor: Verizon Inc Permit status: Permit expired | Expiration date: September 14, 2012 | Permit id: Pa69618 | |||||
SCORE 72 Roll off debris container Date: June 1, 2017 Contractor: Gard Global Group Permit status: Permit expired | Expiration date: June 14, 2017 | Permit id: Pa10413488 |