Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New mh to lot 28 Date: March 20, 2008 Permit status: Closed | Permit id: 08-01318 | |||||
New mh to lot 28 Value: $41,000 Client: New Mh To Lot 28 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01318 | Parcel: 20940 | |||||
SCORE 100 New mh to lot 28 Client: New Mh To Lot 28 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01318 | Parcel: 20940 | |||||
March 6, 2008 3:49:48 pm kneel new mh to lot 28 location: n louisiana to right on emma, left on emma hills; moving mobile home into emma hills mobile home park lot # 28. Mobile home must meet all development standards of the udo for mobile home parks. If the requirements cannot be met this permit shall become null and void. March 11, 2008 2:34:53 pm garym.; march 20, 2008 11:04:32 am kneel new mh to lot 28; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling Permit type: Permits - historical | Permit status: Closed | Permit id: 08-01318 | Parcel: 20940 | |||||
New mh to lot 28 Date: March 20, 2008 Value: $41,000 Client: New Mh To Lot 28 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-01318 | Parcel: 20940 | |||||
March 6, 2008 3:49:48 pm kneel new mh to lot 28 location: n louisiana to right on emma, left on emma hills; moving mobile home into emma hills mobile home park lot # 28. Mobile home must meet all development standards of the udo for mobile home parks. If the requirements cannot be met this permit shall become null and void. March 11, 2008 2:34:53 pm garym.; march 20, 2008 11:04:32 am kneel new mh to lot 28; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling Date: March 20, 2008 Permit type: Permits - historical | Permit status: Closed | Permit id: 08-01318 | Parcel: 20940 |