Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roofing permit: total tear-off and overlay of a condo townhome, 16 squares, 9 12-12 12 pitch, dimensional shingles Date: September 26, 2005 Contractor: Van Lier Roofing Inc Client: William Guercio | Applicant: Van Lier Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: November 8, 2005 | Current use: Multifamily dwe | |||||
SCORE 100 Remodel of existing condo to relocate kitchen sink, range, and dishwasher, add new toilet and new sink on first floor, replace tub shower with stall on second floor, and 7 new lights in kitchen. To include structural modifications per engineered design. Client: William Guercio | Applicant: Buckner Construction Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 20, 2010 | Current use: Multifamily dwe | |||||
SCORE 95 Fs - sowl - inchmodify the existing system head spacing and location in unit 15 for new wall configuration to gain compliance with nfpa 13. This will require adding five heads and relocate two heads. Inch Date: February 9, 2015 Contractor: Western States Fire Protection Client: David Terzian,Marilyn Terzian | Applicant: Western States Fire Protection | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 99 Addition and minor remodel to existing townhome. Scope of work includes creating habiltable space out of what was orginally an inchhoa storage spaceinch to create new bedroom and loft, and a reconfiguration of existing bathroom to add a shower. Includes electrical and plumbing permits. Client: David Terzian,Marilyn Terzian | Applicant: Buckner Construction | Permit type: Building, electrical | Permit status: Iss | Current use: Townhomes, addi | |||||
SCORE 100 Remodel of existing condo to relocate kitchen sink, range, and dishwasher, add new toilet and new sink on first floor, replace tub shower with stall on second floor, and 7 new lights in kitchen. To include structural modifications per engineered design. Client: William Guercio | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: May 20, 2010 | Current use: Multifamily dwellings, alteration | Permit id: Pmt2009-04040 | |||||
SCORE 95 Fs - sowl - inchmodify the existing system head spacing and location in unit 15 for new wall configuration to gain compliance with nfpa 13. This will require adding five heads and relocate two heads. Inch Client: David Terzian | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2015-00391 | |||||
SCORE 99 Addition and minor remodel to existing townhome. Scope of work includes creating habiltable space out of what was orginally an inchhoa storage spaceinch to create new bedroom and loft, and a reconfiguration of existing bathroom to add a shower. Includes electrical and plumbing permits. Client: David Terzian | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: September 4, 2015 | Current use: Townhomes, addition and remodel | Permit id: Pmt2015-00531 | |||||
SCORE 100 Roofing permit: total tear-off and overlay of a condo townhome, 16 squares, 9 12-12 12 pitch, dimensional shingles Client: William Guercio | Permit type: Roofing | Permit status: Cmp | Completion date: November 8, 2005 | Current use: Multifamily dwellings, existing | Permit id: Pmt2005-03739 |