Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 62 Building renovations school renovations to mcdonogh 28 jr, high sch to inc: hvac work, fire alarm system, emergency & exit lighting, caulk, watpro as per plans and specs. Preliminary . Client: School Board, Orleans Parish | Permit id: B02002347 | |||||
SCORE 89 Electrical reconnect school cleveland francois planned ourage reconnect Client: School Board, Orleans Parish | Permit id: E01009283 | |||||
SCORE 75 General repairs school repairs Client: School Board, Orleans Parish | Permit id: E02000192 | |||||
SCORE 82 Electrical rewiring school clinton armand Client: School Board, Orleans Parish | Permit id: E02008518 | |||||
SCORE 97 Install mechanical equipment school install (31)- 5-ton hvac system, (14)- 4-ton system and 43-elec warm air furnace. Bernard j lyons 271-3431 Client: School Board, Orleans Parish | Permit id: M03005048 | |||||
Install mechanical equipment school install (31)- 5-ton hvac system, (14)- 4-ton system and 43-elec warm air furnace. Bernard j lyons 271-3431 Client: School Board, Orleans Parish | Permit id: M03005048 | |||||
SCORE 69 Install mechanical equipment school install (31)- 5-ton hvac system, (14)- 4-ton system and 43-elec warm air furnace. Bernard j lyons 271-3431 Client: School Board, Orleans Parish | Permit id: M03005048 | |||||
SCORE 82 Building renovations school renovations and repairs of existing rest rooms for students and staff at mcdonogh #28,jr high as per plans. //// preliminary ///. Client: School Board, Orleans Parish | Permit id: B01004273 |