Building Permits at 27 F St Nw, Washington, DC 20566


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 27 F St Nw, Washington, DC 20566 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Advance 4 borings to approximately ft. Bgs. Within the proposed building footprint using geoprobe and having a borehole of 2-inch diameter. One-inch pvc temporary wells will be installed in each borehole to complete a groundwater quality assessment. Temporary wells and boreholes will be open less than 24 hrs and will be grouted upon completion of the assessment of each location.
Date:  August 8, 2013

Client: Kennedy Center For The Performing Arts | Applicant: Langan Engineering ? Environmental | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300316
2013/08/0809527 F St Nw Washington Dc 20566
Drill 9 borings within footprint of proposed building. Two borings will be drilled to 45 ft. Bgs. And 65 ft. Bgs, having a 4. 25-inch diam. Borehole and using hollow stem auger. The remaining 7 borings will be drilled to 75 ft. Bgs using mud rotary and having a 3. 25-inch diam. Borehole. At these 7 locations the bedrock will be cored an additional to 15 ft. Bgs using nx coring having a 2. 15-inch diam. Borehole. Temporary well points will be installed for groundwater quality and aquifer testing in two of the boreholes at 65 ft and 75 ft. Bgs. Boreholes will be grouted upon completion of assessment and will be open less than 24 hrs.
Date:  August 8, 2013

Client: Kennedy Center For The Performing Arts | Applicant: Langan Engineering ? Environmental | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300317
2013/08/0809527 F St Nw Washington Dc 20566
Replace gift shop materail lift. Estimated cost of work 48,000. 00
Date:  November 12, 2013

Client: United States Of America | Applicant: Otis Elevator Company | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302160
2013/11/1209527 F St Nw Washington Dc 20566
Peelle door mod estimated cost of work 104,000. 00
Date:  November 20, 2013

Client: United States Of America | Applicant: Otis Elevator Co | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302161
2013/11/2009527 F St Nw Washington Dc 20566
Peelle door mod on biparty freight estimated cost of work 121,000. 00
Date:  November 12, 2013

Client: United States Of America | Applicant: Otis Elevator Co | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302165
2013/11/1209527 F St Nw Washington Dc 20566
Stripescalators to bare truss and rebuild est. Cost of work 1,611,5418. 00
Date:  November 4, 2014

Client: Smith Property Holdings 4411 Connecticutt Llc | Applicant: Otis Elevator Company | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1403129
2014/11/0409527 F St Nw Washington Dc 20566
The first phase of the project consists of land disturbance associated with the relocation of a dc water control vault on the site. The second phase of the project consists of construction of a new expansion, parking area, green roofs, and gardens to the kennedy center for the performing arts. Federal property
Date:  October 29, 2015

Client: United States Of America | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1411311
2015/10/2909527 F St Nw, Washington, Dc 20566
SCORE
64
Advance 4 borings to approximately ft. Bgs. Within the proposed building footprint using geoprobe and having a borehole of 2-inch diameter. One-inch pvc temporary wells will be installed in each borehole to complete a groundwater quality assessment. Temporary wells and boreholes will be open less than 24 hrs and will be grouted upon completion of the assessment of each location.
Date:  August 8, 2013

Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300316
2013/08/0806427 F St Nw, Washington, Dc 20566Langan Engineering Environmental
SCORE
64
Drill 9 borings within footprint of proposed building. Two borings will be drilled to 45 ft. Bgs. And 65 ft. Bgs, having a 4. 25-inch diam. Borehole and using hollow stem auger. The remaining 7 borings will be drilled to 75 ft. Bgs using mud rotary and having a 3. 25-inch diam. Borehole. At these 7 locations the bedrock will be cored an additional to 15 ft. Bgs using nx coring having a 2. 15-inch diam. Borehole. Temporary well points will be installed for groundwater quality and aquifer testing in two of the boreholes at 65 ft and 75 ft. Bgs. Boreholes will be grouted upon completion of assessment and will be open less than 24 hrs.
Date:  August 8, 2013

Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300317
2013/08/0806427 F St Nw, Washington, Dc 20566Langan Engineering Environmental
SCORE
64
Advance 4 borings to approximately ft. Bgs. Within the proposed building footprint using geoprobe and having a borehole of 2-inch diameter. One-inch pvc temporary wells will be installed in each borehole to complete a groundwater quality assessment. Temporary wells and boreholes will be open less than 24 hrs and will be grouted upon completion of the assessment of each location.
Date:  August 8, 2013

Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300316
2013/08/0806427 F St Nw, Washington, Dc 20566Langan Engineering Environmental
SCORE
64
Drill 9 borings within footprint of proposed building. Two borings will be drilled to 45 ft. Bgs. And 65 ft. Bgs, having a 4. 25-inch diam. Borehole and using hollow stem auger. The remaining 7 borings will be drilled to 75 ft. Bgs using mud rotary and having a 3. 25-inch diam. Borehole. At these 7 locations the bedrock will be cored an additional to 15 ft. Bgs using nx coring having a 2. 15-inch diam. Borehole. Temporary well points will be installed for groundwater quality and aquifer testing in two of the boreholes at 65 ft and 75 ft. Bgs. Boreholes will be grouted upon completion of assessment and will be open less than 24 hrs.
Date:  August 8, 2013

Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300317
2013/08/0806427 F St Nw, Washington, Dc 20566Langan Engineering Environmental
SCORE
95
Replace gift shop materail lift. Estimated cost of work 48,000. 00
Date:  November 12, 2013

Client: United States Of America | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302160
2013/11/1209527 F St Nw, Washington, Dc 20566Otis Elevator Company
SCORE
95
Peelle door mod estimated cost of work 104,000. 00
Date:  November 20, 2013
Contractor: Otis Elevator Co

Client: United States Of America | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302161
2013/11/2009527 F St Nw, Washington, Dc 20566Otis Elevator Co
SCORE
95
Peelle door mod on biparty freight estimated cost of work 121,000. 00
Date:  November 12, 2013
Contractor: Otis Elevator Co

Client: United States Of America | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1302165
2013/11/1209527 F St Nw, Washington, Dc 20566Otis Elevator Co
SCORE
95
Stripescalators to bare truss and rebuild est. Cost of work 1,611,5418. 00
Date:  November 4, 2014

Client: Smith Property Holdings 4411 Connecticutt Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1403129
2014/11/0409527 F St Nw, Washington, Dc 20566Otis Elevator Company
SCORE
71
The proposed work consists of construction of the stormwater management facilities and underground utility infrastructure for the kennedy center for the performing arts expansion - swm plan number 3955. Refer to building permit number b1411311 for erosion and sediment control and excavation approval. This project is located on federal property.
Date:  December 16, 2015
Contractor: Noelle Trent

Client: Tom Whitaker Kennedy Center For The Performing Arts | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602646
2015/12/1607127 F St Nw, Washington, Dc 20566Noelle Trent
The first phase of the project consists of land disturbance associated with the relocation of a dc water control vault on the site. The second phase of the project consists of construction of a new expansion, parking area, green roofs, and gardens to the kennedy center for the performing arts. Federal property
Date:  October 29, 2015

Client: United States Of America | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1411311
2015/10/2909527 F St Nw, Washington, Dc 20566
SCORE
59
Drill ten borings within site expansion area to depths ranging from 5 to feet bgs using geoprobe drilling method and macro-core samplers having an od of 2. 25 inches. Boreholes will be grouted upon completion of assessment and will be open less than 24 hours.
Date:  June 8, 2015

Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500318
2015/06/0805927 F St Nw, Washington, Dc 20566Langan Engineering And Environmenta
SCORE
59
We will perform 3 cone penetrometer tests, cpts and 2 flat dilatometer tests, dmts. The cpts and dmts consist of a conical and flat plate probe, respectively, that are pushed into the ground using a truck rig. No investigation dervide wastes are expected to be generated. If holes do not self-seal upon removal of probes, probe-holes will be immediately filled with grout.
Date:  June 26, 2015

Client: Kennedy Center For The Performing Arts | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500348
2015/06/2605927 F St Nw, Washington, Dc 20566Langan Engineering And Environmenta
SCORE
59
1 vertical geothermal bore, air rotary method to target depth of 5 feet, 8. 5 inch diameter to bedrock and 5. 5 inch diameter to target depth thereafter. See attached work plan for more detail.
Date:  February 4, 2015

Client: Claudette Donlon | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500117
2015/02/0405927 F St Nw, Washington, Dc 20566Sean Jones Allied Well Drilling
SCORE
59
Dc clean rivers proposes to drill twelve geotechnical borings, inc-1, inc-2, inc-3, bx-1, bx-2, bx-3, bx-4, bx-5, pz-1, pz-2, ow-1, ow-2, located in the parking lot and green space south of the kennedy center and north of i-66. The borings will be 6 inches in diameter and range between 67 and 82 feet in depth, drilled by mud rotary methods. Temporary casing will be used to install inclonometers, borehole extensometers and vibrating wire piezometers. Permanent casing will be socketed and grouted in rock before proceeding with drilling. Temporary casing will be set before proceeding with drilling. All drilling generated wastes will be drummed, and tested for proper disposal. All borings will be protected from surface water drainage and the vertical migration of contaminants and other materials down the borehole.
Date:  April 7, 2016

Client: Tom Whitaker- Kennedy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600141
2016/04/0705927 F St Nw, Washington, Dc 20566Nic Patterson Dccr Project Aecom
SCORE
59
Dc clean rivers project proposes to drill 1 secant piles, identified as s-1 through s-130, to support excavation of the cso-21 diversion chamber and drop shaft located in the parking lot and green space south of the kennedy center and north of i-66. The secant piles will be inches in diameter 67 feet deep and drilled by auger methods. Temporary steel casing will be advanced to top of rock and grouted before continued drilling. See attached work plan and schematics for additional information. All drilling generated waste will be contained: solids and liquids, tested and properly disposed. The boring will be covered and protected from surface water drainage and the vertical migration of contaminants and other materials during construction.
Date:  April 25, 2016

Client: Tom Whitaker Kenendy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600140
2016/04/2505927 F St Nw, Washington, Dc 20566Nic Patterson Dccr Project Aecom
SCORE
56
On behalf of dc water, the dc clean rivers project is requesting the doee approval to install approximately rock grout borings surrounding the drop shaft located south of the kennedy center. Dccr is proposing to drill the rock grout borings to support construction of the division pr-b cso-21 diversion chamber and drop shaft as part of dc waters ltcp. The rock grout borings will be excavated utilizing duplex rotary drilling with water flush methods to top of rock. Wet rotary with water flush and/or water actuated down the hole hammer methods will be used to drill into the rock. The rock grout will be tremied to the top of the bedrock. The boring will then be tremie grouted with bentonite slurry from the top of rock to the surface while extracting the temporary surface casing. Soil cuttings shall be isolated and temporarily stockpiled at the site in applicable stockpiling regulations. Sampling and laboratory analysis of these spoils will be performed to determine disposal requirements. No

Client: Tom Whitaker Kennedy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600166
2016/04/2505627 F St Nw, Washington, Dc 20566Tom Whitaker Kennedy Center; Lee Lucas Dccr Project Aecom
SCORE
64
(dccr) proposes to drill and install micropile foundation elements (s-1 through s-20) to support the ventilation control facility at the cso 021 diversion chamber and drop shaft site, located south of the kennedy center and north of i-66. Micropile foundation installation will be performed utilizing a fully cased methodology. After installing the first section of casing, drilling with an auger or bucket is performed until the excavation inside the casing reaches approximately 1. 5 feet above the lower end of the casing. Sandbags and earth dikes will be used to prevent surface runoff from entering the borehole. Reinforced steel will be placed after the excavation of the micropile has been completed, and the design depth of the pile has been reached. Each individual micropile shaft will be permanently filled with 4,0 psi grout. No excavated soils will be used as backfill. The micropile installation, waste management of drill spoils, and groundwater protective measures are comprehensively
Date:  July 11, 2017
Contractor: Homaira Sharif

Client: United States Of America | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700364
2017/07/1106427 F St Nw, Washington, Dc 20566Homaira Sharif
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.