Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: January 26, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 30, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: January 26, 2016 Contractor: Tmag Industries Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: March 30, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 8, 2017 Contractor: Oak Island Heating And Air Conditioning Inc Permit type: Addn | Permit status: Completed | Completion date: October 11, 2017 | Permit id: Pds2017-Resalt- | |||||
Rough frame Date: September 13, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Stormwater insp Date: November 4, 2009 Permit status: Monitor | Permit id: Pds2009-1006-20 | |||||
Stormwater insp Date: December 24, 2008 Permit status: Monitor | Permit id: Pds2008-1026-20 |