Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 125a new electrical sub-panel has been added to relocate existing load from the main service panel to this sub-panel. A fee is added for misc. Electrical 06/15/16 plan change, change note in line diagram to show 125a main breaker to be installed w/in existing 200a subpanel. See comments in cofa. -drw Date: May 31, 2016 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 17, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 125a new electrical sub-panel has been added to relocate existing load from the main service panel to this sub-panel. A fee is added for misc. Electrical 06 15 16 plan change, change note in line diagram to show 125a main breaker to be installed w in existing 200a subpanel. See comments in cofa. -drw Date: May 31, 2016 Contractor: Tmag Industries Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: June 17, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: June 15, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Final Date: October 4, 2005 Permit status: Pass | Permit id: Pds2004-1023-20 | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 125a new electrical sub-panel has been added to relocate existing load from the main service panel to this sub-panel. A fee is added for misc. Electrical 06/15/16 plan change, change note in line diagram to show 125a main breaker to be installed w/in existing 200a subpanel. See comments in cofa. -drw Date: May 31, 2016 Contractor: Tmag Industries Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- |