Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp ![]() Permit status: Closed | Permit id: 12-00142 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00142 | Parcel: 6033 | |||||
SCORE 88 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00142 | Parcel: 6033 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00142 | Parcel: 6033 | |||||
January 5, 2012 9:52:09 am kneel. Wellington mhp - used mh to lot, master approval 09-6160. Location: wellington mhp off airport rd.; march 5, 2012 10:34:39 am jfortner. Wellington mhp - used mh to lot, master approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes wa Permit type: Permits - historical | Permit status: Closed | Permit id: 12-00142 | Parcel: 6033 | |||||
Wellington mhp ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 12-00142 | |||||
January 5, 2012 9:52:09 am kneel. Wellington mhp - used mh to lot, master approval 09-6160. Location: wellington mhp off airport rd.; march 5, 2012 10:34:39 am jfortner. Wellington mhp - used mh to lot, master approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes wa ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 12-00142 | Parcel: 6033 |