Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp #26 Date: August 7, 2013 Permit status: Closed | Permit id: 13-03812 | |||||
SCORE 100 Wellington mhp #26 Client: Wellington Mhp #26 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-03812 | Parcel: 6080 | |||||
SCORE 95 Wellington mhp #26 Client: Wellington Mhp #26 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-03812 | Parcel: 6080 | |||||
June 24, 2013 12:40: pm heatherr. Move home and setup of mobile home in existing mobile home park, ref. 12-5279 & 9-61 mastersite; har location:wellington estates mhp off airport rd; august 7, 2013 9:58:18 am heatherr. Move home and setup of mobile home in existing mobile home park, ref. 12-5279 & 9-61 mastersite; har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Permit type: Permits - historical | Permit status: Closed | Permit id: 13-03812 | Parcel: 6080 | |||||
Wellington mhp #26 Date: August 7, 2013 Value: $14,625 Permit type: Historical | Permit status: Closed | Permit id: 13-03812 | |||||
June 24, 2013 12:40: pm heatherr. Move home and setup of mobile home in existing mobile home park, ref. 12-5279 & 9-61 mastersite; har location:wellington estates mhp off airport rd; august 7, 2013 9:58:18 am heatherr. Move home and setup of mobile home in existing mobile home park, ref. 12-5279 & 9-61 mastersite; har; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Date: August 7, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-03812 | Parcel: 6080 |