Building Permits at 2545 Central Av Boulder CO


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2545 Central Av Boulder CO over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
95
Remove room divider.
Date:  January 11, 2005

Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Current use: Office - admini
2005/01/110952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Furr out 3 walls
Date:  September 7, 2004
Value:   $1,500

Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 19, 2004 | Current use: Office - admini
2004/09/071500952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Add 2 new walls and remove 3 walls.
Date:  August 24, 2004
Value:   $6,600

Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2005 | Current use: Office - admini
2004/08/246600952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
96
Fire sprinkler system - phase 5
Date:  April 17, 2001

Client: Central 2545.0 | Applicant: Code Fire Systems, Inc | Permit type: Fire | Permit status: Cmp | Completion date: January 28, 2002 | Current use: Office - techni
2001/04/170962545 Central Av Boulder CoCode Fire Systems Inc
SCORE
88
Replace split system a c system unit.
Date:  January 11, 2001

Client: Central 2545.0 | Applicant: Encompass Mechanical Services | Permit type: Mechanical | Permit status: N&v | Current use: Manufacturing,
2001/01/110882545 Central Av Boulder CoEncompass Mechanical Services
SCORE
95
Create three offices from two.
Date:  January 10, 2001
Value:   $4,200

Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Office - admini
2001/01/104200952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Demo wall and rebuild
Date:  November 13, 2000
Value:   $4,000

Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Office - admini
2000/11/134000952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Tenant remodel, includes building and electrical
Date:  May 24, 2000
Value:   $353

Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 30, 2000 | Current use: Office - admini
2000/05/24353952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Interior non-structural demolition of interior walls only -- main floor only. Approximately 16,0 sf.
Date:  April 24, 2009

Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: October 10, 2011 | Current use: Office - admini
2009/04/240952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Tenant remodel of 21, 456 sf to create offices, conference rooms and laboratory areas for droplet measurment technologies. Fire sprinkler system to be added by separate permit.
Date:  June 24, 2009
Value:   $1,291,758

Client: Central 2545.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 22, 2009 | Current use: Office - techni
2009/06/241291758952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
New sprinkler for droplet
Date:  June 30, 2009
Contractor: Code Fire Llc

Client: Central 2545.0 | Applicant: Code Fire Llc | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2012 | Current use: Office - techni
2009/06/300952545 Central Av Boulder CoCode Fire Llc
SCORE
100
Install new 6inch fireline
Date:  July 9, 2009
Contractor: Nixcavating Inc

Client: Central 2545.0 | Applicant: Nixcavating, Inc | Permit type: Fire, water, right-o | Permit status: Iss
2009/07/0901002545 Central Av Boulder CoNixcavating Inc
SCORE
91
New fire alarm system for droplet measurement
Date:  August 12, 2009

Client: Central 2545.0 | Applicant: Samsons Detection Systems Inc. | Permit type: Fire | Permit status: Cmp | Current use: Office - techni
2009/08/120912545 Central Av Boulder CoSamsons Detection Systems Inc
SCORE
100
Bore 75foot along central to install new cable
Date:  May 13, 2011
Contractor: Comcast

Client: Central 2545.0 | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss
2011/05/1301002545 Central Av Boulder CoComcast
SCORE
92
Remove roofing on upper tier of roof and re-roof with foam and 3 coats of elastomeric coating. 76 squares, flat roof.
Date:  December 13, 2012

Client: Investment Flatiron | Applicant: Technical Foam Corp | Permit type: Roofing | Permit status: Cmp | Completion date: May 20, 2013 | Current use: Existing
2012/12/130922545 Central Av Boulder CoTechnical Foam Corp
SCORE
95
Installation of two replacement rtus, like for like, units to meet required energy efficiencies detailed in the 2006 iecc, brc 1981 and amended and or ashrae 90. 1.
Date:  May 1, 2013

Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: June 26, 2013 | Current use: Office - techni
2013/05/010952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
95
Interior non-structural demo. Fire sprinklers under separate permit. Scope of work does not include mechanical, electrical or plumbing.
Date:  December 23, 2013

Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: February 5, 2014 | Current use: Manufacturing,
2013/12/230952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
100
Fs - sowl - inchrelocate 2 penent sprinklers for new tenant finish. Total of 2. Inch
Date:  January 16, 2014
Contractor: Fire Defense Inc

Client: Investment Flatiron | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 5, 2014 | Current use: Office - admini
2014/01/1601002545 Central Av Boulder CoFire Defense Inc
SCORE
100
Tenant interior remodel: scope to include creation of new office space and open conference space. Scope will also include creation of new accessible bathroom.
Date:  July 2, 2014
Value:   $175,857

Client: Investment Flatiron | Applicant: Faurot Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 12, 2014 | Current use: Office - profes
2014/07/021758571002545 Central Av Boulder CoFaurot Construction Inc
SCORE
100
Interior non-structural demolition for tenant interior remodel under pmt2014-01805.
Date:  April 24, 2014

Client: Investment Flatiron | Applicant: Faurot Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: September 11, 2014 | Current use: Office - profes
2014/04/2401002545 Central Av Boulder CoFaurot Construction Inc
SCORE
95
Replacement of 3 rtus - like for like size and location. To include 2, 5 ton units at 17. 1 seer and 1, 7. 5 ton unit at 13 seer.
Date:  June 24, 2014

Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: July 30, 2014 | Current use: Commercial/reta
2014/06/240952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
100
Push pull nre cable via bore to exsisting conduit
Date:  August 4, 2014
Contractor: Comcast

Client: Investment Flatiron | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss
2014/08/0401002545 Central Av Boulder CoComcast
SCORE
99
Fa - add 13 h s & 3 strbs
Date:  August 5, 2014

Client: Investment Flatiron | Applicant: Fire Alarm System Technologies Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - admini
2014/08/050992545 Central Av Boulder CoFire Alarm System Technologies Inc
SCORE
95
Fs - tf for office space
Date:  August 7, 2014

Client: Investment Flatiron | Applicant: Abc Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - admini
2014/08/070952545 Central Av Boulder CoAbc Fire Protection Inc
SCORE
95
Installation of replacement rtu (124,8 btu) on commercial building. New unit matches existing size and penetrations.
Date:  September 16, 2014

Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: October 9, 2014 | Current use: Office - techni
2014/09/160952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
95
Inchlike for likeinch replacements of eight rtufoots . Four 7. 5 ton - 92k btu, (1) 4 ton - 48k btu, (1) 5 ton - 60k btu, (1) 8. 5 ton - 102k btu, and (1) 12. 5 ton - 150k btu.
Date:  August 13, 2015

Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Iss | Current use: Manufacturing,
2015/08/130952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
95
New sign cabinet to be installed over existing free-standing sign.
Date:  June 28, 2016
Value:   $9,290

Client: Investment Flatiron | Permit type: Flood fence flood permit, sign | Permit status: Cmp | Completion date: August 11, 2016 | Current use: Commercial/retail, existing | Permit id: Pmt2016-02773
2016/06/289290952545 Central Av Boulder CoBroomfield Sign Co, Inc
Underground cable replacement for out of service building. Bore ~4 ft with 9 8inchpotholes, and 5 3x3 bore cuts.
Date:  August 23, 2016

Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03891
2016/08/230952545 Central Av Boulder Co
SCORE
95
Tenant remodel of 21, 456 sf to create offices, conference rooms and laboratory areas for droplet measurment technologies. Fire sprinkler system to be added by separate permit.
Date:  June 26, 2009
Value:   $230,000

Client: Central | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: October 22, 2009 | Current use: Office - technical, tenant remodel | Permit id: Pmt2009-02043
2009/06/26230000952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
New sprinkler for droplet
Date:  July 8, 2009
Value:   $28,628
Contractor: Code Fire Llc

Client: Central | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2012 | Current use: Office - technical, existing | Permit id: Pmt2009-02429
2009/07/0828628952545 Central Av Boulder CoCode Fire Llc
SCORE
95
Install new 6inch fireline
Date:  July 9, 2009
Contractor: Nixcavating, Inc

Client: Central | Permit type: Fire, water, right-of-way | Permit status: Iss | Permit id: Pmt2009-02569
2009/07/090952545 Central Av Boulder CoNixcavating, Inc
SCORE
91
New fire alarm system for droplet measurement
Date:  August 12, 2009
Value:   $5,000

Client: Central | Permit type: Fire | Permit status: Cmp | Current use: Office - technical, existing | Permit id: Pmt2009-03167
2009/08/125000912545 Central Av Boulder CoSamsons Detection Systems Inc
SCORE
95
Installation of two replacement rtus, like for like, units to meet required energy efficiencies detailed in the 2006 iecc, brc 1981 and amended and or ashrae 90. 1.
Date:  May 1, 2013
Value:   $5,510

Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: June 26, 2013 | Current use: Office - technical, existing | Permit id: Pmt2013-01838
2013/05/015510952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
95
Tenant remodel, includes building and electrical
Date:  May 24, 2000
Value:   $353

Client: Central | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 30, 2000 | Current use: Office - administrative, remodel | Permit id: Pmt2000-02099
2000/05/24353952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Create three offices from two.
Date:  January 10, 2001
Value:   $4,200

Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Office - administrative, remodel | Permit id: Pmt2001-00124
2001/01/104200952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
88
Replace split system a c system unit.
Date:  January 12, 2001
Value:   $19,441

Client: Central | Permit type: Mechanical | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2001-00142
2001/01/1219441882545 Central Av Boulder CoEncompass Mechanical Services
SCORE
96
Fire sprinkler system - phase 5
Date:  April 18, 2001
Value:   $1,850

Client: Central | Permit type: Fire | Permit status: Cmp | Completion date: January 28, 2002 | Current use: Office - technical, existing | Permit id: Pmt2001-01414
2001/04/181850962545 Central Av Boulder CoCode Fire Systems, Inc
SCORE
95
Fs - sowl - inchrelocate 2 penent sprinklers for new tenant finish. Total of 2. Inch
Date:  January 16, 2014
Value:   $200
Contractor: Fire Defense, Inc

Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: February 5, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-00231
2014/01/16200952545 Central Av Boulder CoFire Defense, Inc
SCORE
100
Tenant interior remodel: scope to include creation of new office space and open conference space. Scope will also include creation of new accessible bathroom.
Date:  July 10, 2014
Value:   $82,000

Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 12, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-01805
2014/07/10820001002545 Central Av Boulder CoFaurot Construction Inc
SCORE
95
Replacement of 3 rtus - like for like size and location. To include 2, 5 ton units at 17. 1 seer and 1, 7. 5 ton unit at 13 seer.
Date:  June 24, 2014
Value:   $36,276

Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: July 30, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2014-02983
2014/06/2436276952545 Central Av Boulder CoTimberline Mechanical Systems
Push pull nre cable via bore to exsisting conduit
Date:  August 4, 2014

Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-03508
2014/08/040952545 Central Av Boulder Co
SCORE
99
Fa - add 13 h s & 3 strbs
Date:  August 11, 2014
Value:   $2,000

Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-03624
2014/08/112000992545 Central Av Boulder CoFire Alarm System Technologies Inc
SCORE
95
Fs - tf for office space
Date:  August 8, 2014
Value:   $4,735

Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: September 23, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-03689
2014/08/084735952545 Central Av Boulder CoAbc Fire Protection Inc
SCORE
95
Installation of replacement rtu (124,8 btu) on commercial building. New unit matches existing size and penetrations.
Date:  September 16, 2014
Value:   $13,251

Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: October 9, 2014 | Current use: Office - technical, existing | Permit id: Pmt2014-04277
2014/09/1613251952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
92
Remove roofing on upper tier of roof and re-roof with foam and 3 coats of elastomeric coating. 76 squares, flat roof.
Date:  December 14, 2012
Value:   $37,475

Client: Investment Flatiron | Permit type: Roofing | Permit status: Cmp | Completion date: May 20, 2013 | Current use: Existing | Permit id: Pmt2012-05957
2012/12/1437475922545 Central Av Boulder CoTechnical Foam Corp
SCORE
95
Furr out 3 walls
Date:  September 7, 2004
Value:   $300

Client: Central | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 19, 2004 | Current use: Office - administrative, remodel | Permit id: Pmt2004-03490
2004/09/07300952545 Central Av Boulder CoQuinlan Construction Inc
Bore 75foot along central to install new cable
Date:  May 13, 2011

Client: Central | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-01849
2011/05/130952545 Central Av Boulder Co
SCORE
95
Inchlike for likeinch replacements of eight rtufoots . Four 7. 5 ton - 92k btu, (1) 4 ton - 48k btu, (1) 5 ton - 60k btu, (1) 8. 5 ton - 102k btu, and (1) 12. 5 ton - 150k btu.
Date:  August 13, 2015
Value:   $48,145

Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: September 21, 2015 | Current use: Manufacturing, existing | Permit id: Pmt2015-03429
2015/08/1348145952545 Central Av Boulder CoTimberline Mechanical Systems
SCORE
95
Interior non-structural demo permit in preparation for work under pending pmtg2017-02148.
Date:  May 19, 2017

Client: Flatiron Gpif | Permit type: Demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-02149
2017/05/190952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Demo wall and rebuild
Date:  November 13, 2000
Value:   $4,000

Permit type: Building, electrical | Permit status: Cmp | Completion date: December 27, 2000 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-04623
2000/11/134000952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Add 2 new walls and remove 3 walls.
Date:  August 24, 2004
Value:   $6,600

Client: Central | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2005 | Current use: Office - administrative, remodel | Permit id: Pmt2004-03325
2004/08/246600952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Interior tenant remodel of an existing office space (remodel space located on main level in single-story portion of building)., scope includes work area of approximately 18 sf, and includes reconfiguration of interior non-structural walls, new single-stall restroom, reconfiguration of hvac ductwork, and electrical new lighting. Includes associated mep.
Date:  July 7, 2017
Value:   $67,785

Client: Flatiron Gpif | Permit type: Building, electrical, mechanical, plumbing | Permit status: Def | Completion date: September 7, 2017 | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-02148
2017/07/0767785952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Sowl - (scope of work letter) for adding approximately 18 sprinkler heads to accomodate new wall ceiling layout. Kbi biopharma. See pmt 2017-02148 for general building permit.
Date:  June 28, 2017
Value:   $1,097

Client: Flatiron Gpif | Permit type: Fire | Permit status: Cmp | Completion date: September 7, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-02747
2017/06/281097952545 Central Av Boulder CoFreedom Fire Protection, Llc
SCORE
100
Fa- sowl (scope of work letter) per applicant: modify existing addressable fa system to monitor the fire sprinkler riser, provide occupant notification throughout on actuation of water flow, pull station and detection devices. Provide elevator recall, fire hat and shunt trip; and communicate all alarm, supervisory, and trouble signals by point contact id format to a ul listed central station via an aes wireless fire radio. Add four new ceiling mounted horn strobes, one new ceiling mounted ceiling strobe, and relocate one ceiling strobe. See pmt 2017-02854 for general building permit. Kbi biopharma
Date:  July 14, 2017
Value:   $3,555

Client: Flatiron Gpif | Permit type: Fire | Permit status: Cmp | Completion date: September 7, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-02854
2017/07/1435551002545 Central Av Boulder CoTrident Security Systems
SCORE
95
Inchwhite shellinch demolition to prepare an existing tenant space for leasing. Energy and accessibilty code compliance to be detrmined upon future teant interior remodel permit submittal. Scope includes removal of interior partitions and electrical demolition.
Date:  October 5, 2017
Value:   $1,500

Client: Flatiron Gpif | Permit type: Electrical, demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-04294
2017/10/051500952545 Central Av Boulder CoQuinlan Construction Inc
SCORE
95
Installation of a replacement, roof mounted bathroom exhaust fan. Installation per manufacturerfoots specifications. No structural scope proposed approved.
Date:  October 6, 2017
Value:   $3,337

Client: Flatiron Gpif | Permit type: Mechanical | Permit status: Iss | Current use: Service industrial, existing | Permit id: Pmt2017-04337
2017/10/063337952545 Central Av Boulder CoTimberline Mechanical Systems
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.