Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 91 Carport and 2nd level addition to existing bedroom. Date: September 19, 2008 Contractor: Fox Construction Inc Permit status: In for review | Current use: Residential | Permit id: Bld2008-02010 | |||||
SCORE 100 Electric service upgrade and misc electrical upgrades worksheet valve Date: February 13, 2013 Contractor: Capital Electric Inc Permit type: Electrical | Permit status: Closed | Current use: Residential | Permit id: Bld2009-00118 | |||||
SCORE 91 Finish basement, add shelf (engineer design) redo outside basement stairs, rough in 1/2 bath main floor, basement finish includes bath, laundry & family room j. U. Zone: sr-1a, sfd, in hist, cert of app provided plnhlc2010-00409, interior finish of basement & redo outside stairs to basement rough in main floor 1/2 bath. Same footprint. J. U. Date: August 12, 2010 Contractor: Fox Construction Inc Permit status: Closed | Current use: Residential | Permit id: Bld2010-05486 | |||||
SCORE 96 Install 4 plumbing fixtures, 3 drains, 1 water heater, & 1 hose bibb for basement finish. Date: September 14, 2010 Contractor: Malouf Group Llc Permit type: Plumbing | Permit status: Closed | Current use: Residential | Permit id: Bld2010-06317 | |||||
SCORE 100 Elec work for finish basement Date: October 26, 2010 Contractor: Capital Electric Inc Permit type: Electrical | Permit status: Closed | Current use: Residential | Permit id: Bld2010-07384 |