Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning use permit Date: March 21, 2016 Client: Omara Spiro Inc | Permit status: Completed | Permit id: 660813 | |||||
Zoning permit Date: December 8, 2015 Client: Omara Spiro Inc | Permit status: Completed | Permit id: 632227 | |||||
Demolition permit Date: March 21, 2016 Client: Omara Spiro Inc | Permit status: Completed | Permit id: 660830 | |||||
Plumbing permit Date: February 9, 2016 Client: Omara Spiro Inc | Permit status: Completed | Permit id: 668864 | |||||
Permit for the demolition of all existing structures on lot; for the lot adjustment to create ten(10) lots from ( parcel "a" through parcel " j") from three(3) opa accounts (2515 e albert st, 2519 albert st and 2629-33 belgrade street) as follows: parcel "a" through parcel "e" ( belgrade street frontgae): for the erecrion of an attached structure ( nte 38 ft high) ; pilot house accessed to roof deck only for a single family household living with one(1) off-street parking for one(1) car accessed by a shear driveway ( wide ) at rear parcel "f" through parcel "j" ( livingston st frontgae): for the erecrion of an attached structure ((nte 38 ft high) ; pilot house accessed to roof deck only for a single family household living with one(1) off-street parking for one(1) car accessed by a shear driveway ( wide ) at rear size and location as shown in the application. Date: September 18, 2015 Client: Omara Spiro Inc | Applicant: Leo Mulvihill, Jr.Esquire | Permit type: Appeal | Permit status: Granted | Completion date: November 30, 2015 | Permit id: 26102 | |||||
SCORE 93 Sealing off lateral and remove curb trap pa20160400947 (sfd)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: February 9, 2016 Contractor: Richard Ladavich Client: Riverward Land Holdings L | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 13, 2016 | Permit id: 668864 | |||||
For the demolition of all existing structures on lot; for the lot adjustment to create ten(10) lots from ( parcel "a" through parcel " j") from one(1) opa account (2515 e albert st) and from two(2) deeded lots (2519 albert st and 2629-33 belgrade street). Size and location as shown in the application. Date: December 8, 2015 Client: Riverward Land Holdings L | Permit type: Zoning permit | Permit status: Completed | Completion date: December 29, 2015 | Permit id: 632227 | |||||
Complete demo of warehouse Date: March 21, 2016 Client: Riverward Land Holdings L | Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 21, 2016 | Permit id: 660813 | |||||
For the complete demolition of an attached structure. Valid sidewalk closure permit to be secured for proposed temporary fencing. Pedestrian protection to be provided in accordance with section b-3306. (21 day demo start date waived--zba hearing under ap#632227, cal no. 26102) Date: March 21, 2016 Client: Riverward Land Holdings L | Permit type: Demolition permit | Permit status: Completed | Completion date: May 25, 2016 | Permit id: 660830 |