Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Mechanical permit Date: July 14, 2008 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 163720 | |||||
Zoning permit Date: December 14, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 118326 | |||||
Plumbing permit Date: March 3, 2008 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 135661 | |||||
Addition permit Date: December 14, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 118329 | |||||
Electrical permit Date: February 27, 2008 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 135006 | |||||
Alteration permit Date: October 2, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 104463 | |||||
Electrical permit Date: February 27, 2008 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 135006 | |||||
Plumbing permit Date: March 3, 2008 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 135661 | |||||
Mechanical permit Date: July 14, 2008 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 163720 | |||||
Zoning permit Date: December 14, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 118326 | |||||
Addition permit Date: December 14, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 118329 | |||||
Alteration permit Date: October 2, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit status: Completed | Permit id: 104463 | |||||
SCORE 99 Rough in 3 water closets, 3 lavys, 2 tubs laundry tub, kitchen sink, indirect waste Date: March 3, 2008 Contractor: Stephen Ditomo Jr Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 14, 2008 | Permit id: 135661 | |||||
SCORE 100 Install one 2. 5 ton air handler on the third floor and one 2. 5 air handler in the basement of a sfd. No other work allowed on this permit. Condensors to be located on the roof; not visible from the street. Applicant agrees to limit construction to comply with ez permit standard dated february, 2007. Deviation from this standard will result in the revocation of this permit and the imposition of further penalties. Date: July 14, 2008 Contractor: Anthony Casile Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 27, 2008 | Permit id: 163720 | |||||
SCORE 65 Install 200a service, proper grounding and re wire entire house as per 2005 nec (south district) Date: February 27, 2008 Contractor: H C Electrical Co Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Electrical permit | Permit status: Completed | Completion date: August 13, 2008 | Permit id: 135006 | |||||
SCORE 100 House drain, house trap and fresh air inlet, lateral, water distribution Date: February 19, 2008 Contractor: Murray Resnick Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 3, 2008 | Permit id: 133270 | |||||
Second story rear addition on top of existing one story portion of structure - with egress window well and interior alterations. Date: December 14, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Addition permit | Permit status: Completed | Completion date: August 5, 2008 | Permit id: 118329 | |||||
Second story rear addition on top of existing one story portion of structure Date: December 14, 2007 Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Zoning permit | Permit status: Completed | Completion date: December 14, 2007 | Permit id: 118326 | |||||
SCORE 99 Remove replace shingles with year fiberglass shingles. Install rubber membrane at gutter areas and flats. Install lb. Asphalt base sheet to entire roof. In stall copper drain liners (3). For rear lower roof, install new facial board at eave. Install new aluminum facial board covers and k gutter with 4" downspouts. Front proch roof install new copper drain flange and new aluminum drip edge. Date: October 2, 2007 Contractor: Castelli Contractors Client: Pooler Joseph W Jr Pooler Terri G | Permit type: Alteration permit | Permit status: Completed | Completion date: October 24, 2007 | Permit id: 104463 |