Building Permits at 25 Cherry St, Burlington, VT 05401


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 25 Cherry St, Burlington, VT 05401 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
At courtyard marriott: remove (2) phase iii 1 gal indirect water heating tanks and replace with (2) triangle tube smart t1 indirect tanks.
Date:  February 22, 2013

Permit type: Plumbing permit | Permit status: Issued | Permit id: 13-166016 | Parcel: 0442146000
2013/02/2209525 Cherry St, Burlington, Vt 05401
Install 2 ada lifts in existing pool/spa room
Date:  January 16, 2013

Permit type: Building permit | Permit status: Pending approval | Permit id: 13-164859 | Parcel: 0442146000
2013/01/1609525 Cherry St, Burlington, Vt 05401
Replace (14) corroded sprinklers and escutchinons in pool area. Note: separate permits, testing, and inspections from the city fire marshals office must be secured and conducted in addition to this permit issued by dpw/isd.
Date:  August 8, 2012

Permit type: Sprinkler systems | Permit status: Closed | Permit id: 12-157283 | Parcel: 0442146000
2012/08/0809525 Cherry St, Burlington, Vt 05401
Work was never done-building permit was not required for this project per chapter 8 of the burlington code of ordinance sect 8-28(d) or as approved and noted by the city of burlington building official.
Date:  February 10, 2012

Permit type: Building permit | Permit status: Closed | Permit id: 12-149379 | Parcel: 0442146000
2012/02/1009525 Cherry St, Burlington, Vt 05401
Building permit was not required for this project per chapter 8 of the burlington code of ordinance and as approved by the city of burlington building official.
Date:  February 23, 2011

Permit type: Building permit | Permit status: Closed | Permit id: 11-133202 | Parcel: 0442146000
2011/02/2309525 Cherry St, Burlington, Vt 05401
SCORE
95
Amendment to 08-514ca for change to materials for east elevation.
Date:  July 23, 2010

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 08-514ca(a) | Parcel: 0442146000
2010/07/2309525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
95
Install one parallel and two projecting signs for hotel. Illumination included.
Date:  May 27, 2010

Permit type: Zoning permit - signs and awnings | Permit status: Final co issued | Permit id: 10-1010sn | Parcel: 0442146000
2010/05/2709525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
95
Install 5 lights for sculpture at hotel entrance.
Date:  May 27, 2010

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 10-1009ca | Parcel: 0442146000
2010/05/2709525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
95
Obstruction location: activity permitted: delivery of material to hotel, truck in roadway, items on sidewalk leave sidewalk lane open for pedestrians
Date:  May 11, 2010

Permit type: Obstruction permit | Permit status: Closed | Permit id: 10-120525 | Parcel: 0442146000
2010/05/1109525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
99
Obstruction location: activity permitted: ladders on sidewalk area, for anwing installation tape off area / signage for pedestrians
Date:  April 12, 2010

Permit type: Obstruction permit | Permit status: Closed | Permit id: 10-119482 | Parcel: 0442146000
2010/04/1209925 Cherry St, Burlington, Vt 05401Otter Creek Awnings
SCORE
76
Obstruction location: activity permitted: crane service to relocate roof mounted equipment. At marriott hotel closing cherry st from battery to cathedral sq. Driveway on friday 4 / 9 or alt date of monday 4 / 12 see traffic plan for signage / traffic c
Date:  April 6, 2010
Contractor: Ccs Crane Service

Permit type: Obstruction permit | Permit status: Closed | Permit id: 10-119323 | Parcel: 0442146000
2010/04/0607625 Cherry St, Burlington, Vt 05401Ccs Crane Service
SCORE
100
Obstruction location: activity permitted: closing off roadway for crane removal roadway closed from pine st to garage entrance garage entrance will remain open
Date:  November 2, 2009

Permit type: Obstruction permit | Permit status: Closed | Permit id: 09-112463 | Parcel: 0442146000
2009/11/02010025 Cherry St, Burlington, Vt 05401Pizzagalli Construction Company
SCORE
95
Amendment to permit 08-514ma/ca for condition 5 to allow exterior construction activity on saturdays from 7. 30am to 6. 30pm.
Date:  October 9, 2009

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 10-0372ca | Parcel: 0442146000
2009/10/0909525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
100
Obstruction location: activity permitted: blocking of street for crane assembly see traffic plan detour signage / flaggers/ general signage parking meter bags - 24 hr for two days ( 10/ 5 - 10/6 )
Date:  September 30, 2009

Permit type: Obstruction permit | Permit status: Closed | Permit id: 09-111314 | Parcel: 0442146000
2009/09/30010025 Cherry St, Burlington, Vt 05401Pizzagalli Construction Company
SCORE
97
Gas test coupon - erosion control on gas lines
Date:  July 8, 2009

Permit type: Excavation permit | Permit status: Closed | Permit id: 09-108350 | Parcel: 0442146000
2009/07/0809725 Cherry St, Burlington, Vt 05401Vermont Gas Systems Inc
Install new fire alarm wiring and devices for a new 34 room, 16 gsf addition to the existing 88,0 gsf marriott courtyard hotel. The will be an extension of the existing fire alarm system in the existing part of the building. Note: separate permits, t
Date:  July 2, 2009

Permit type: Fire alarm systems | Permit status: Closed | Permit id: 09-108211 | Parcel: 0442146000
2009/07/0209525 Cherry St, Burlington, Vt 05401
Installation of dwv, water piping connecting into existing services, owner supplied fixtures to serve 35 units.
Date:  July 2, 2009

Permit type: Plumbing permit | Permit status: Closed | Permit id: 09-108209 | Parcel: 0442146000
2009/07/0209525 Cherry St, Burlington, Vt 05401
SCORE
95
Parallel entry sign for courtyard marriott. Internally illuminated. East elevation
Date:  November 3, 2008

Permit type: Zoning permit - signs and awnings | Permit status: Final co issued | Permit id: 09-400sn | Parcel: 0442146000
2008/11/0309525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
95
Construction of a 34 room addition to the existing marriott courtyard hotel.
Date:  January 31, 2008

Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 08-514ca | Parcel: 0442146000
2008/01/3109525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
99
Obstruction location: activity permitted: crane service for window cleaning
Date:  October 4, 2007

Permit type: Obstruction permit | Permit status: Closed | Permit id: 07-126804 | Parcel: 0442146000
2007/10/0409925 Cherry St, Burlington, Vt 05401Superior Window Cleaning
SCORE
66
Amendment application to change use of 43 (forty-three) residential condo units to 31 (thirty-one) residential condo units and the remaining space to be used for offices.
Date:  July 16, 2007

Permit type: Zoning permit - coa level i | Permit status: Request denied | Permit id: 07-838ca | Parcel: 0442146000
2007/07/1606625 Cherry St, Burlington, Vt 05401Westlake Residential Condominium Association
SCORE
99
Obstruction location: activity permitted: installation of fiber optic cable on cherry st from garage area to church st
Date:  June 7, 2007

Permit type: Obstruction permit | Permit status: Closed | Permit id: 07-123266 | Parcel: 0442014003
2007/06/0709925 Cherry St, Burlington, Vt 05401Engineers Construction Inc
SCORE
98
Installation of new sidewalk & curb no fee for this project included with restoration
Date:  May 8, 2007

Permit type: Excavation permit | Permit status: Closed | Permit id: 07-122145 | Parcel: 0442014003
2007/05/0809825 Cherry St, Burlington, Vt 05401S. D. Ireland Brothers Corporation
SCORE
99
To create phase iii (for the parking garage) approved under permit #04-304. Three stories on interior of project: first level (c1) to be conveyed to westlake residential partners, second level (c2) to be retained by the city, and top level (c3) landscape
Date:  January 25, 2007
Contractor: City Of Burlington

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 07-457ca | Parcel: 0442014003
2007/01/2509925 Cherry St, Burlington, Vt 05401City Of Burlington
SCORE
95
To create phase ii (for the 127 room hotel) approved under permit #04-304.
Date:  January 25, 2007

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 07-456ca | Parcel: 0442146000
2007/01/2509525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
99
Install emergency generator among existing mechanical equipment cluster and screen with 3 new spruce trees. Proposed location to replace location approved as part of permit # 04-032ma/ca.
Date:  December 7, 2006
Contractor: City Of Burlington

Permit type: Zoning permit - coa level i | Permit status: Superseded | Permit id: 07-391ca | Parcel: 0442014003
2006/12/0709925 Cherry St, Burlington, Vt 05401City Of Burlington
SCORE
95
Parallel sign ( in x 332. 25 in) for courtyard marriott on battery street facade. Internally illuminated.
Date:  October 5, 2006

Permit type: Zoning permit - signs and awnings | Permit status: Final co issued | Permit id: 07-273sn | Parcel: 0442146000
2006/10/0509525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
98
Obstruction location: corners of battery st and cherry st activity permitted: lifts and equipment for westlake hotel project long term obstruction approved by council
Date:  October 4, 2006

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-112113 | Parcel: 0442146000
2006/10/0409825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
SCORE
100
Install new hvac system to serve merriott hotels swimming pool, restaurant and residential areas.
Date:  August 4, 2006

Permit type: Mechanical permit | Permit status: Closed | Permit id: 06-110718 | Parcel: 0442146000
2006/08/04010025 Cherry St, Burlington, Vt 05401Mountain Air Systems Inc
Install control wiring for the smoke evacuation system pending review and approval of fire marshal.
Date:  June 20, 2006

Permit type: Fire alarm systems | Permit status: Closed | Permit id: 06-106940 | Parcel: 0442146000
2006/06/2009525 Cherry St, Burlington, Vt 05401
SCORE
82
One parallel metal sign for the marriott courtyard.
Date:  June 19, 2006

Permit type: Zoning permit - signs and awnings | Permit status: Withdrawn | Permit id: 06-862sn | Parcel: 0442146000
2006/06/1908225 Cherry St, Burlington, Vt 05401Westlake Residential Partners Llc
SCORE
82
Install 2 parallel signs and 1 freestanding sign for courtyard marriott. One parallel sign to be internally illuminated, the other 2 will not be illuminated.
Date:  June 9, 2006

Permit type: Zoning permit - signs and awnings | Permit status: Permit relinquished | Permit id: 06-838sn | Parcel: 0442146000
2006/06/0908225 Cherry St, Burlington, Vt 05401Westlake Residential Partners Llc
SCORE
76
Marriot/courtyard: 2nd part of a 2 part permit: install new wiring for a new building, including new service, sub panels, receps. Lights, switches, and temporary service. Coordinate with bed. All per nec 2005
Date:  June 8, 2006
Contractor: Alfred Senecal

Permit type: Electrical permit | Permit status: Closed | Permit id: 06-106576 | Parcel: 0442146000
2006/06/0807625 Cherry St, Burlington, Vt 05401Alfred Senecal
SCORE
80
Obstruction location: battery street between college st and cherry st activity permitted: concrete trucks for pouring west lake project
Date:  June 2, 2006
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-106428 | Parcel: 0442146000
2006/06/0208025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
98
Obstruction location: corner of cherry st at battery st activity permitted: crane and dumpster for continued work on westlake hotel project
Date:  June 2, 2006

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-106422 | Parcel: 0442146000
2006/06/0209825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
SCORE
98
Obstruction location: corner of battery st and cherry st activity permitted: dumpster and lift vehicles for westlake hotel project permit cancelled, incorrect information
Date:  June 2, 2006

Permit type: Obstruction permit | Permit status: Canceled | Permit id: 06-106411 | Parcel: 0442146000
2006/06/0209825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
SCORE
80
Obstruction location: along battery street between college st and cherry st activity permitted: concrete trucks for pouring upper decks to condo project
Date:  April 18, 2006
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-105097 | Parcel: 0442146000
2006/04/1808025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
99
Obstruction location: along battery street between college st and cherry st activity permitted: fencing for westlake condo project. Permit for period of oct 28, 2005 thru june 28, 2006
Date:  March 16, 2006

Permit type: Obstruction permit | Permit status: Canceled | Permit id: 06-104149 | Parcel: 0442146000
2006/03/1609925 Cherry St, Burlington, Vt 05401Yandow Dousevicz Construction
SCORE
80
Obstruction location: on battery street between college st and cherry st. Activity permitted: concrete truck and pumper for pouring upper decks on condo project
Date:  March 8, 2006
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-103980 | Parcel: 0442146000
2006/03/0808025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
98
Obstruction location: cherry street, along south side. Activity permitted: crane and dumpster for hotel construction. Permit holder responsible for snow removal while obstruction is in place. Anticipated completion for crane use is end of march 2006
Date:  February 23, 2006

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-101077 | Parcel: 0442146000
2006/02/2309825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
SCORE
80
Obstruction location: battery street between cherry street and college st. Activity permitted: concrete trucks and pumpers for pumping concrete on upper floors for condos.
Date:  February 17, 2006
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-100962 | Parcel: 0442146000
2006/02/1708025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
100
Westlake hotel install new plumbing system to serve new nione story hotel with kitchen on second floor.
Date:  January 27, 2006

Permit type: Plumbing permit | Permit status: Closed | Permit id: 06-100516 | Parcel: 0442146000
2006/01/27010025 Cherry St, Burlington, Vt 05401Mountain Air Systems Inc
SCORE
80
Obstruction location: on battery street between cherry st and college st activity permitted: concrete trucks for pumping concrete on upper floors
Date:  January 9, 2006
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 06-100140 | Parcel: 0442146000
2006/01/0908025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
80
Obstruction location: battery street between college st and cherry st activity permitted: concrete and pumper trucks for pouring concrete flooring for condos. Trucks will come and go as necessary. No vehicles left in roadway during non work hours.
Date:  December 1, 2005
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-119960 | Parcel: 0442146000
2005/12/0108025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
97
Installing conduit across the remainder of cherry street
Date:  November 14, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-119580 | Parcel: 0442146000
2005/11/1409725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
98
Obstruction location:contractor is seeking to place a crane on cherrry street, to support their construction project. Their crane will obstruct cherry street leaving 24 feet of roadway during its off hours, and feet of roadway during hours of construct
Date:  November 9, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-119533 | Parcel: 0442146000
2005/11/0909825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
Contractor is seeking to obstruct the roadway, sidewalk, and greenbelt, for a period of approximately 8 weeks. The crane is to be positioned approximately 1 from the west side of the crane to the curbline projection for battery street. The crane will b
Date:  November 9, 2005

Permit type: Excavation permit | Permit status: Canceled | Permit id: 05-119530 | Parcel: 0442146000
2005/11/0909525 Cherry St, Burlington, Vt 05401
SCORE
80
Obstruction location: cherry and battery activity permitted:concrete trucks and pumper this portion of job completed
Date:  November 3, 2005
Contractor: S D Ireland Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-119352 | Parcel: 0442146000
2005/11/0308025 Cherry St, Burlington, Vt 05401S D Ireland Inc
SCORE
97
Obstruction location: cherry st and battery st activity permitted: concrete trucks and pumper job completed
Date:  October 26, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-119116 | Parcel: 0442146000
2005/10/2609725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
98
Obstruction location: cherry street at battery st activity permitted: concrete trucks and pumper.
Date:  October 20, 2005
Contractor: Sd Mansfield Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-118961 | Parcel: 0442146000
2005/10/2009825 Cherry St, Burlington, Vt 05401Sd Mansfield Inc
Installing water service for hotel at corner of cherry st @ battery st
Date:  October 17, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-118812 | Parcel: 0442146000
2005/10/1709525 Cherry St, Burlington, Vt 05401
SCORE
97
Obstruction location: along battery and cherry st for westlake project. Poc: scott aiken activity permitted: fencing for project. For period 5/5/2005-10/28/2005
Date:  September 28, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-118273 | Parcel: 0442146000
2005/09/2809725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
98
Obstruction location: lower cherry st activity permitted: removal of crane
Date:  September 19, 2005
Contractor: Sd Mansfield Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-118002 | Parcel: 0442146000
2005/09/1909825 Cherry St, Burlington, Vt 05401Sd Mansfield Inc
SCORE
98
Obstruction location: lower cherry street activity permitted: removal of crane from cherry street site
Date:  September 1, 2005
Contractor: Sd Mansfield Inc

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-117541 | Parcel: 0442146000
2005/09/0109825 Cherry St, Burlington, Vt 05401Sd Mansfield Inc
SCORE
99
Obstruction location: battery street between college st and cherry st activity permitted: crane for steel placement for condos. Permit continued on permit no 05-118273 until oct 28, 2005.
Date:  August 17, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-117099 | Parcel: 0442146000
2005/08/1709925 Cherry St, Burlington, Vt 05401Yandow Dousevicz Construction
SCORE
97
Obstruction location: cherry st, between battery st and pine st. Activity permitted: closure of street for crane assembly
Date:  August 11, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-117017 | Parcel: 0442146000
2005/08/1109725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
Installing new water service for westlake project
Date:  June 30, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-115779 | Parcel: 0442146000
2005/06/3009525 Cherry St, Burlington, Vt 05401
SCORE
97
Installing conduit along battery st for pedestrian signals, on west side battery at cherry st
Date:  June 13, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-115164 | Parcel: 0442146000
2005/06/1309725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
Marriott hotel-install wiring for a complete fire alarm system for marriott hotel. Including main panel, annunciator, initiation, notification, monitoring etc. Pending review and approval of fire marshal
Date:  June 9, 2005

Permit type: Fire alarm systems | Permit status: Closed | Permit id: 05-115082 | Parcel: 0442146000
2005/06/0909525 Cherry St, Burlington, Vt 05401
Courtyard marriott: install low voltage wiring and controls for boilers cooling tower to circ. Pumps. Install low voltage wiring for individual heat pumps (143 total)
Date:  June 9, 2005

Permit type: Electrical control wiring | Permit status: Closed | Permit id: 05-115079 | Parcel: 0442146000
2005/06/0909525 Cherry St, Burlington, Vt 05401
SCORE
97
Installing sheeting and footings for construction project
Date:  June 2, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114823 | Parcel: 0442146000
2005/06/0209725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Obstruction location: cherry st near battery st activity permitted: fencing for construction project. Duplicate permit, permit cancelled
Date:  June 2, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-114822 | Parcel: 0442146000
2005/06/0209725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Obstruction location: activity permitted:
Date:  June 2, 2005

Permit type: Obstruction permit | Permit status: Canceled | Permit id: 05-114821 | Parcel: 0442146000
2005/06/0209725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing electrical conduit. Adjustment to permit no 05-113252
Date:  May 27, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114699 | Parcel: 0442146000
2005/05/2709725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit. Adjustment to permit no 113253
Date:  May 27, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114698 | Parcel: 0442146000
2005/05/2709725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit under sidewalk. Admin fees only for replacement of sidewalk.
Date:  May 27, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114673 | Parcel: 0442146000
2005/05/2709725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Adjustment for permit no 114223
Date:  May 26, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114668 | Parcel: 0442146000
2005/05/2609725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Conection to storm drain on battery street.
Date:  May 20, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114435 | Parcel: 0442146000
2005/05/2009725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit across battery street for traffic signals
Date:  May 20, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114434 | Parcel: 0442146000
2005/05/2009725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit across cherry st
Date:  May 12, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-114223 | Parcel: 0442146000
2005/05/1209725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit. Cancelled, work done differently
Date:  May 10, 2005

Permit type: Excavation permit | Permit status: Canceled | Permit id: 05-114129 | Parcel: 0442146000
2005/05/1009725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Cancelled. Work performed differently than planned.
Date:  May 9, 2005

Permit type: Excavation permit | Permit status: Canceled | Permit id: 05-114127 | Parcel: 0442146000
2005/05/0909725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit in street in front of parking garage
Date:  April 25, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-113600 | Parcel: 0442146000
2005/04/2509725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit on south side of cherry street near parking garage
Date:  April 25, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-113599 | Parcel: 0442146000
2005/04/2509725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
99
Two temporary 72 by 42 project signs.
Date:  April 22, 2005
Contractor: City Of Burlington

Permit type: Zoning permit - signs and awnings | Permit status: Final co issued | Permit id: 05-538sn | Parcel: 0442146000
2005/04/2209925 Cherry St, Burlington, Vt 05401City Of Burlington
SCORE
97
Installing conduit under sidewalk for westlake project along north side of cherry st
Date:  April 21, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-113549 | Parcel: 0442146000
2005/04/2109725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing conduit across cherry st for cherry st project.
Date:  April 11, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-113253 | Parcel: 0442146000
2005/04/1109725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Installing electrical conduit across cherry st
Date:  April 11, 2005

Permit type: Excavation permit | Permit status: Closed | Permit id: 05-113252 | Parcel: 0442146000
2005/04/1109725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
SCORE
97
Obstruction location: fencing along battery street from wyndham hotel to cherry st. To maintain 54 inch walkway with jersey barriers along curb for pedestrian access. Will present plan to commission for longer extension.
Date:  April 6, 2005

Permit type: Obstruction permit | Permit status: Closed | Permit id: 05-113160 | Parcel: 0442146000
2005/04/0609725 Cherry St, Burlington, Vt 05401S. D. Ireland Concrete Construction Corporation
Permit cancelled:
Date:  March 18, 2005

Permit type: Plumbing permit | Permit status: Canceled | Permit id: 05-112663 | Parcel: 0442146000
2005/03/1809525 Cherry St, Burlington, Vt 05401
Appeal of zoning administrators decision not to re-open appeal period.
Date:  November 30, 2004

Permit type: Zoning miscellaneous appeal | Permit status: Withdrawn | Permit id: 05-330ap | Parcel: 0442146000
2004/11/3009525 Cherry St, Burlington, Vt 05401
Construction of a 127-room hotel (westlake), 43 residential units, 25,8 sq. Ft. Of commercial office space, a new 128-space parking garage structure, surface and 6 standing parking spaces, and the addition of 2 levels to the existing lakeview parking
Date:  November 26, 2003

Permit type: Zoning permit - coa level ii | Permit status: Final co issued | Permit id: 04-304 | Parcel: 0442146000
2003/11/2609525 Cherry St, Burlington, Vt 05401
SCORE
56
Installation of seven nonilluminated parallel signs (two large parallel over entries handled under separate permit) for the existing retail (filenes) structure. (one directly over each entry door and each display window along cherry street)
Date:  September 20, 1999

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 00-170 | Parcel: 0442146000
1999/09/2005625 Cherry St, Burlington, Vt 05401May Design And Construction Co
SCORE
56
Installation of back-lit parallel signs for the existing department store (filenes).
Date:  May 18, 1999

Permit type: Zoning permit - coa level i | Permit status: Final co issued | Permit id: 99-575 | Parcel: 0442146000
1999/05/1805625 Cherry St, Burlington, Vt 05401May Department Stores
SCORE
90
Three lot subdivision to facilitate the construction of filenes department store and associated parking garage. Other lots created; 45 and 67 cherry streets. Located at the corner of battery and cherry streets.
Date:  September 29, 1998

Permit type: Zoning permit - coa level iii | Permit status: Final co issued | Permit id: 99-225 | Parcel: 0442146000
1998/09/2909025 Cherry St, Burlington, Vt 05401Donohoe Obrien Burlington
SCORE
59
Relocate a hood and reduct same back to the main exhause
Date:  October 6, 1988

Permit type: Mechanical permit | Permit status: Closed | Permit id: 9602 | Parcel: 0442014003
1988/10/0605925 Cherry St, Burlington, Vt 05401Vermont Air Systems
SCORE
100
Metal parking garage repair
Date:  April 18, 2001

Permit type: Building permit | Permit status: Closed | Permit id: 2010724 | Parcel: 0442014003
2001/04/18010025 Cherry St, Burlington, Vt 05401Pizzagalli Construction Company
SCORE
100
Install new area drain and piping system in existing parking garage--cherry st parking garage. Tie into existing
Date:  March 5, 2001
Contractor: David Brown

Permit type: Plumbing permit | Permit status: Closed | Permit id: 2010386 | Parcel: 0442014003
2001/03/05010025 Cherry St, Burlington, Vt 05401David Brown
Other
Date:  January 16, 2013
Value:   $13,500

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Pending approval | Current use: (c) commercial | Permit id: 13-164859
2013/01/16135009525 Cherry St, Burlington, Vt 05401
SCORE
100
Water heaters
Date:  February 22, 2013
Value:   $7,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Plumbing permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 13-166016
2013/02/22700010025 Cherry St, Burlington, Vt 05401Coolidge Heating And Hotwater
SCORE
95
Remodeling
Date:  February 19, 2014
Value:   $121,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Closed | Current use: (c) commercial | Permit id: 14-184956
2014/02/191210009525 Cherry St, Burlington, Vt 05401Burlington Harbor Hotel Group Llc
SCORE
97
General wiring
Date:  February 19, 2014
Value:   $45,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 14-184957
2014/02/19450009725 Cherry St, Burlington, Vt 05401Omega Electric Construction Company Inc
SCORE
95
Sprinkler system(s)
Date:  February 19, 2014
Value:   $700

Client: Burlington Harbor Hotel Group Llc | Permit type: Sprinkler systems | Permit status: Closed | Current use: (c) commercial | Permit id: 14-184960
2014/02/197009525 Cherry St, Burlington, Vt 05401Fire Protection Inc
SCORE
100
Other
Date:  April 30, 2014
Value:   $12,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Mechanical permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 14-187412
2014/04/301200010025 Cherry St, Burlington, Vt 05401Alliance Mechanical
SCORE
100
General plumbing
Date:  April 30, 2014
Value:   $600

Client: Burlington Harbor Hotel Group Llc | Permit type: Plumbing permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 14-187414
2014/04/3060010025 Cherry St, Burlington, Vt 05401Alliance Mechanical
Building permit
Date:  June 2, 2015

Client: Burlington Harbor Hotel Group Llc | Permit status: Application pending | Current use: (c) commercial | Permit id: 15-209796
2015/06/0209525 Cherry St, Burlington, Vt 05401
SCORE
97
Remodeling
Date:  January 14, 2016
Value:   $360,000
Contractor: Pc Construction

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 16-217083
2016/01/143600009725 Cherry St, Burlington, Vt 05401Pc Construction
SCORE
97
General wiring
Date:  January 14, 2016
Value:   $60,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 16-217085
2016/01/14600009725 Cherry St, Burlington, Vt 05401Omega Electric Construction Company Inc
SCORE
100
General plumbing
Date:  January 14, 2016
Value:   $5,500

Client: Burlington Harbor Hotel Group Llc | Permit type: Plumbing permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 16-217086
2016/01/14550010025 Cherry St, Burlington, Vt 05401Alliance Mechanical
SCORE
100
Hvac
Date:  January 14, 2016
Value:   $7,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 16-217087
2016/01/14700010025 Cherry St, Burlington, Vt 05401Alliance Mechanical
SCORE
97
Fire alarm(s)
Date:  January 14, 2016
Value:   $400

Client: Burlington Harbor Hotel Group Llc | Permit type: Fire alarm systems | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 16-217088
2016/01/144009725 Cherry St, Burlington, Vt 05401Omega Electric Construction Company Inc
SCORE
98
Sprinkler system(s)
Date:  January 14, 2016
Value:   $5,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Sprinkler systems | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 16-217089
2016/01/1450009825 Cherry St, Burlington, Vt 05401Firetech Sprinkler Corporation
SCORE
99
General wiring
Date:  May 11, 2016
Value:   $500
Contractor: Jp Systems

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 16-227525
2016/05/115009925 Cherry St, Burlington, Vt 05401Jp Systems
SCORE
90
Gas fireplace / heating stove
Date:  May 3, 2016
Value:   $7,912
Contractor: Blazing Design Inc

Client: Burlington Harbor Hotel Group Llc | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 16-227240
2016/05/0379129025 Cherry St, Burlington, Vt 05401Blazing Design Inc
General plumbing
Date:  March 18, 2005

Permit type: Plumbing permit | Permit status: Cancelled | Current use: (r) multi-family | Permit id: 05-112663
2005/03/1809525 Cherry St, Burlington, Vt 05401
SCORE
86
Install new gas fired fireplace and venting per manufacturers instructions and/or nfpa 54 in lobby area of new hotel
Date:  March 9, 2007
Value:   $6,000
Contractor: Russ Beamish

Client: Burlington Harbor Hotel Group Llc | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 07-120556 | Parcel: 0442146000
2007/03/0960008625 Cherry St, Burlington, Vt 05401Russ Beamish
SCORE
100
Courtyard marriott: this permit is for additional electrical work in new hotel and includes exterior lighting on level 9, bar lighting on level 2. Finish work in pool and pool area, courtyard lighting, service receptacle outlet on roof and replacing 12
Date:  April 10, 2007
Value:   $25,000
Contractor: Steve Baker

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 07-121317 | Parcel: 0442146000
2007/04/102500010025 Cherry St, Burlington, Vt 05401Steve Baker
SCORE
98
This is an after the fact finishing of three hotel suites on floor 9 (908, 910, and 912 at the burlington courtyard hotel
Date:  April 5, 2007
Value:   $55,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 07-121260 | Parcel: 0442146000
2007/04/05550009825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
SCORE
100
Install new wiring for ul listed sign lighting including a disconnecting means.
Date:  January 25, 2007
Value:   $6,000
Contractor: Twin State Signs

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 07-100527 | Parcel: 0442146000
2007/01/25600010025 Cherry St, Burlington, Vt 05401Twin State Signs
SCORE
100
Historic permit
Date:  April 18, 2001
Value:   $666,065

Client: Donohoe Obrien Burlington | Permit type: Building permit | Permit status: Closed | Current use: Historic permit | Permit id: 01-029364
2001/04/1866606510025 Cherry St, Burlington, Vt 05401Pizzagalli Construction Company
SCORE
59
Historic permit
Date:  October 6, 1988
Value:   $1,981

Client: Donohoe Obrien Burlington | Permit type: Mechanical permit | Permit status: Closed | Current use: Historic permit | Permit id: 88-031835
1988/10/0619815925 Cherry St, Burlington, Vt 05401Vermont Air Systems
SCORE
97
Add one 1 volt recep. Outlet from existing ckt. For kiosk in front entrance of hotel. Per nec 2011
Date:  June 13, 2013
Value:   $250
Contractor: Hegeman Electric

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 13-170459 | Parcel: 0442146000
2013/06/132509725 Cherry St, Burlington, Vt 05401Hegeman Electric
SCORE
99
Install new wiring for 2 ada lifts in existing pool/spa room including bonding per nec 2011
Date:  January 16, 2013
Value:   $200

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 13-164860 | Parcel: 0442146000
2013/01/162009925 Cherry St, Burlington, Vt 05401Gerald Leclair Electric
SCORE
95
Sprinkler system(s)
Date:  August 8, 2012
Value:   $765

Client: Burlington Harbor Hotel Group Llc | Permit type: Sprinkler permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 12-157283
2012/08/087659525 Cherry St, Burlington, Vt 05401Fire Protection Inc
Building permit
Date:  February 23, 2011

Client: Burlington Harbor Hotel Group Llc | Permit status: Closed | Current use: (c) commercial | Permit id: 11-133202
2011/02/2309525 Cherry St, Burlington, Vt 05401
Building permit
Date:  February 10, 2012

Client: Burlington Harbor Hotel Group Llc | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 12-149379
2012/02/1009525 Cherry St, Burlington, Vt 05401
SCORE
100
General wiring
Date:  June 9, 2005
Value:   $20,465

Client: City Of Burlington | Permit type: Electrical control wiring permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 05-115079
2005/06/092046510025 Cherry St, Burlington, Vt 05401Climate Systems Inc
SCORE
98
Nine story hotel with a swimming pool and restaurant on the two lower levels with residential above see final closing conditions
Date:  June 9, 2005
Value:   $4,200,000

Client: City Of Burlington | Permit type: Building permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 05-115077 | Parcel: 0442146000
2005/06/0942000009825 Cherry St, Burlington, Vt 05401Kessel Duff Corporation
SCORE
100
Install new wiring for westlake garage, lights, power, equip. Feeds, new 4 amp., 208v service. All per nec 2005
Date:  June 8, 2005
Value:   $73,000

Client: City Of Burlington | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 05-115001 | Parcel: 0442014003
2005/06/087300010025 Cherry St, Burlington, Vt 05401Norway And Sons Inc
SCORE
99
Comercial parking garage: two levels of required ventilation, w/one level of parking outside on top a total of 132 to 136 parking spaces
Date:  June 8, 2005
Value:   $3,223,000

Client: City Of Burlington | Permit type: Building permit | Permit status: Closed | Current use: (c) commercial | Permit id: 05-114999 | Parcel: 0442014003
2005/06/0832230009925 Cherry St, Burlington, Vt 05401Yandow Dousevicz Construction
SCORE
78
Install ansul piranha 13 ul3 wet chemical fire suppression system to protect kitchen exhaust hood.
Date:  June 9, 2005
Value:   $1,500

Client: City Of Burlington | Permit type: Suppression systems | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 05-115084 | Parcel: 0442146000
2005/06/0915007825 Cherry St, Burlington, Vt 05401All State Fire Equipment
SCORE
100
Fire alarm(s)
Date:  June 9, 2005
Value:   $100,000
Contractor: Dave Cross

Client: City Of Burlington | Permit type: Alarm permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 05-115082
2005/06/0910000010025 Cherry St, Burlington, Vt 05401Dave Cross
SCORE
100
Install (3) buderus, 4 million btu boilers, (124) water souce heat pumps, (13) horizontal heat pumps, kmc ddc controls and associated duct work to serve courtyard by marriott.
Date:  June 9, 2005
Value:   $835,000

Client: City Of Burlington | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 05-115081 | Parcel: 0442146000
2005/06/0983500010025 Cherry St, Burlington, Vt 05401Climate Systems Inc
SCORE
100
Marriott hotel: this is a 2 part permit and will cover the new wiring for 12 amp service, sub panels, swimming pool and some equipment feeds. Coordinate with bed. All per nec 2005
Date:  April 27, 2006
Value:   $350,000
Contractor: Steve Baker

Client: Westlake Residential Partners Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 06-105373 | Parcel: 0442146000
2006/04/2735000010025 Cherry St, Burlington, Vt 05401Steve Baker
SCORE
100
General plumbing
Date:  January 27, 2006
Value:   $400,000

Client: Westlake Residential Partners Llc | Permit type: Plumbing permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 06-100516
2006/01/2740000010025 Cherry St, Burlington, Vt 05401Mountain Air Systems, Inc
SCORE
100
Temp service for marriott hotel project, 1 a, 480v, transformer and 120/208v panel. Coordinate with bed. All per nec 2002
Date:  December 8, 2005
Value:   $1,000
Contractor: Steve Baker

Client: City Of Burlington | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 05-120092 | Parcel: 0442146000
2005/12/08100010025 Cherry St, Burlington, Vt 05401Steve Baker
SCORE
98
Courtyard marrott install new sprinkler system to protect the new 127 room hotel.
Date:  August 10, 2006
Value:   $152,922

Client: Westlake Residential Partners Llc | Permit type: Sprinkler systems | Permit status: Closed | Current use: (c) commercial | Permit id: 06-110820 | Parcel: 0442146000
2006/08/101529229825 Cherry St, Burlington, Vt 05401Cedar Ridge Sprinkler Corporation
SCORE
100
Hvac
Date:  August 4, 2006
Value:   $800,000

Client: Westlake Residential Partners Llc | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 06-110718
2006/08/0480000010025 Cherry St, Burlington, Vt 05401Mountain Air Systems, Inc
SCORE
67
Manual
Date:  June 20, 2006
Value:   $20,000
Contractor: Trombly Electric

Client: Westlake Residential Partners Llc | Permit type: Alarm permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 06-106940
2006/06/20200006725 Cherry St, Burlington, Vt 05401Trombly Electric
SCORE
93
New building
Date:  June 8, 2006
Value:   $350,000

Client: Westlake Residential Partners Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 06-106576
2006/06/083500009325 Cherry St, Burlington, Vt 05401Alfred R. Senecal Jr
SCORE
100
Install new wiring for hvac controls for 8 story addition.
Date:  October 16, 2009
Value:   $13,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical control wiring permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-111903 | Parcel: 0442146000
2009/10/161300010025 Cherry St, Burlington, Vt 05401Climate Systems Inc
SCORE
100
Install temp power for construction trailer. Per nec 2008
Date:  September 17, 2009
Value:   $2,500
Contractor: Peck Electric Co

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-110878 | Parcel: 0442146000
2009/09/17250010025 Cherry St, Burlington, Vt 05401Peck Electric Co
SCORE
98
Provide sprinkler coverage in new addition. Tie into existing system. Note: separate permits, testing, and inspections from the city fire marshals office must be secured and conducted in addition to this permit issued by dpw/isd.
Date:  July 2, 2009
Value:   $25,925

Client: Burlington Harbor Hotel Group Llc | Permit type: Sprinkler systems | Permit status: Closed | Current use: (c) commercial | Permit id: 09-108212 | Parcel: 0442146000
2009/07/02259259825 Cherry St, Burlington, Vt 05401Mountain Valley Sprinkler Systems
SCORE
100
Fire alarm(s)
Date:  July 2, 2009
Value:   $49,695
Contractor: Peck Electric Co

Client: Burlington Harbor Hotel Group Llc | Permit type: Alarm permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-108211
2009/07/024969510025 Cherry St, Burlington, Vt 05401Peck Electric Co
SCORE
100
Installation of fresh air ducting from owner supplied unit. Installation of 35 heat pumps with associated supply and return piping, condensate piping all connecting to existing services.
Date:  July 2, 2009
Value:   $224,159

Client: Burlington Harbor Hotel Group Llc | Permit type: Mechanical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-108210 | Parcel: 0442146000
2009/07/0222415910025 Cherry St, Burlington, Vt 05401Champ Mechanical Llc
SCORE
100
General plumbing
Date:  July 2, 2009
Value:   $216,641

Client: Burlington Harbor Hotel Group Llc | Permit type: Plumbing permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-108209
2009/07/0221664110025 Cherry St, Burlington, Vt 05401Champ Mechanical Llc
SCORE
100
Install new wiring for a new 34 room, 16 square foot addition to the existing 88,0 square foot marriott courtyard hotel, including lights, receps, switches, equipment feeds. Branch circuits will tie in the existing panels in the main part of the hotel.
Date:  July 2, 2009
Value:   $75,900
Contractor: Peck Electric Co

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-108208 | Parcel: 0442146000
2009/07/027590010025 Cherry St, Burlington, Vt 05401Peck Electric Co
SCORE
100
Construction of new 34 room, 16 gsf addition to the existing 88,0 gsf marriott courtyard hotel per 2003 ibc and 2003 nfpa 101.
Date:  July 2, 2009
Value:   $1,600,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-108207 | Parcel: 0442146000
2009/07/02160000010025 Cherry St, Burlington, Vt 05401Pizzagalli Construction Company
SCORE
100
Historic permit
Date:  March 5, 2001
Value:   $32,000
Contractor: David Brown

Client: Donohoe Obrien Burlington | Permit type: Plumbing permit | Permit status: Closed | Current use: Historic permit | Permit id: 01-014190
2001/03/053200010025 Cherry St, Burlington, Vt 05401David Brown
SCORE
100
Install new wiring to add a circuit for the parking garage. Amended 10/12/10-this work included adding a motion switch, gfci recep,and two garage door openers in the trash building next to the parking garage.
Date:  September 17, 2010
Value:   $800
Contractor: Peck Electric Co

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) commercial | Permit id: 10-125234 | Parcel: 0442146000
2010/09/1780010025 Cherry St, Burlington, Vt 05401Peck Electric Co
SCORE
100
Courtyard marriott: install new wiring for an exterior sign and landscape lighting at underpass. Per nec 2008
Date:  April 27, 2010
Value:   $1,200
Contractor: Peck Electric Co

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 10-120020 | Parcel: 0442146000
2010/04/27120010025 Cherry St, Burlington, Vt 05401Peck Electric Co
SCORE
99
Install internally lit ul listed sign. Branch circuit wiring done by others.
Date:  May 26, 2010
Value:   $500
Contractor: Barlo Signs

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 10-121134 | Parcel: 0442146000
2010/05/265009925 Cherry St, Burlington, Vt 05401Barlo Signs
SCORE
100
Foundation improvements in the area of the westlake garage ramp and add concrete to dumpster & recycle area.
Date:  August 13, 2009
Value:   $158,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Closed | Current use: (c) commercial | Permit id: 09-109700 | Parcel: 0442146000
2009/08/1315800010025 Cherry St, Burlington, Vt 05401Pizzagalli Construction Company
SCORE
97
Remodeling
Date:  March 2, 2017
Value:   $54,920
Contractor: Pc Construction

Client: Burlington Harbor Hotel Group Llc | Permit type: Building permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 17-244143
2017/03/02549209725 Cherry St, Burlington, Vt 05401Pc Construction
SCORE
97
General wiring
Date:  March 2, 2017
Value:   $20,000

Client: Burlington Harbor Hotel Group Llc | Permit type: Electrical permit | Permit status: Closed | Current use: (c) hotel/motel | Permit id: 17-244148
2017/03/02200009725 Cherry St, Burlington, Vt 05401Omega Electric Construction Company Inc
SCORE
98
Sprinkler system(s)
Date:  March 2, 2017
Value:   $1,660

Client: Burlington Harbor Hotel Group Llc | Permit type: Sprinkler permit | Permit status: Issued | Current use: (c) hotel/motel | Permit id: 17-244150
2017/03/0216609825 Cherry St, Burlington, Vt 05401Firetech Sprinkler Corporation
Mechanical permit
Date:  March 2, 2017

Client: Burlington Harbor Hotel Group Llc | Permit status: Application | Current use: (c) hotel/motel | Permit id: 17-244149
2017/03/0209525 Cherry St, Burlington, Vt 05401
Construct open air pavilion and masonry barbecue with structure to cover existing outdoor dining and event space.
Date:  August 20, 2015

Permit status: Appeal period - permit ex | Permit id: 297989
2015/08/2009525 Cherry St Burlington Vt
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.