Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Co issued | Current use: Residential | Permit id: 13-02705 | Parcel: 1946808 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Co issued | Current use: Residential | Permit id: 13-02705 | Parcel: 1946808 | |||||
May 7, 2013 2:48:49 pm ssalyer. Placement of used mobile home in existing park wellington mhp;ref 12-5279 and 09-61 for master permits;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. As Permit type: Res: mfg. Home | Permit status: Co issued | Permit id: 13-02705 | Parcel: 1946808 | |||||
May 7, 2013 2:48:49 pm ssalyer. Placement of used mobile home in existing park wellington mhp;ref 12-5279 and 09-61 for master permits;sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until final inspection has been made. As ![]() Permit type: Res: mfg. Home | Permit status: Co issued | Permit id: 13-02705 | Parcel: 1946808 |