Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Removed nob and tube wire, replaced with new romex wiring. Wired new addition. Include 3 2 volt circuits and 15 1 volt circuit Date: February 19, 2016 Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Expiration date: August 22, 2016 | Current use: Half of a party wall double | Permit id: 16-05413-Erpr | |||||
SCORE 59 Construct 181 s. F. Addition to the rear of existing double left side only, also includes an elevated deck addition as per plans. Permit type: Renovation (structural) | Permit status: Permit approval letter | Expiration date: June 4, 2016 | Current use: Two-family | Permit id: 15-34278-Rnvs | |||||
SCORE 96 Paint exterior, patch drywall, install insulation, install new kitchen, remodel bathroom, paint interior, flooring, repair siding where needed. Permit type: Renovation (non-structural) | Permit status: Permit issued | Expiration date: May 11, 2016 | Current use: Two-family | Permit id: 15-34068-Rnvn | |||||
SCORE 59 Construct 181 s. F. Addition to the rear of existing double left side only, also includes an elevated deck addition as per plans. Permit type: Renovation (structural) | Permit status: Permit approval letter | Expiration date: June 4, 2016 | Current use: Two-family | Permit id: 15-34278-Rnvs | |||||
SCORE 93 New gasline and gas w heater vernon 415-3566 ck#5167. Date: February 16, 2017 Contractor: Vernon Marcotte Permit type: Mechanical fuel gas | Permit status: Certificate of completion | Completion date: February 16, 2017 | Expiration date: August 16, 2017 | Current use: Single family | Permit id: 17-05781-Fgas | |||||
SCORE 98 Install 2. 5-ton a/c and gas air handler. Francisco gonzales (#7211) 504-682-7866 Date: November 16, 2015 Contractor: Francisco Gonzales Permit type: Mechanical hvac | Permit status: Certificate of completion | Expiration date: May 16, 2016 | Current use: Two-family | Permit id: 15-34607-Hvac |