Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Remoel interior of condo. Interior remodel on unit 1201. Electrial, plumbing permits required. Also, tile exterior balcony. Zone - historic district - see plnhlc2014-00329 as per l. B. ![]() Permit type: Permit | Permit status: Pass | Completion date: December 19, 2014 | Current use: Residential | Permit id: Bld2014-03613 | |||||
11-fixtures ![]() Permit type: Plumbing | Permit status: Pass | Completion date: December 19, 2014 | Current use: Residential | Permit id: Bld2014-03984 | |||||
Electrical re-wire ![]() Permit type: Electrical | Permit status: Reviews not require | Completion date: June 16, 2014 | Current use: Residential | Permit id: Bld2014-04112 | |||||
SCORE 66 Hvac duct modification ![]() ![]() Permit type: Mechanical | Permit status: Reviews not require | Completion date: July 9, 2014 | Current use: Residential | Permit id: Bld2014-04832 | |||||
This property in a local historic district. Planning approval is required before we can proceed with a building permit. Please contact planning @ 801-535-77 or make application online for a historic landmark approval through the planning tab. Es report also required for building code dept. 1. Remove the existing roof ballast from the roof and job site. 2. Prepare the existing roof surface for an overlay application. 3. Mechanically fasten inch fan fold insulation to wood deck. 4. Mechanically fasten a mil sarnafil sikaplan pvc roof membrane over the fan fold insulation. This membrane will be a white membrane. 5. Install new white pvc coated drip metal to the wood deck. 6. Install all new base-flashing along all vertical walls that intersects the slope of your roof. 7. Install all new pipe boots on all pipes. 8. Install walk pad around the base of the ac units. 9. Remove all associated roof debris and leave the job site neat and clean. ![]() Permit type: Roofing | Permit status: Pass | Completion date: July 10, 2014 | Current use: Commercial | Permit id: Bld2014-04862 | |||||
SCORE 66 Int remodel of master bath, elec/plmbg permits reqd, rmf-75 sf condo #904e, in hist district, no ext work j. U. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: October 10, 2014 | Current use: Residential | Permit id: Bld2014-05695 | |||||
SCORE 66 (1) bath tub ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: October 3, 2014 | Current use: Residential | Permit id: Bld2014-05986 | |||||
SCORE 66 Remodel bathroom ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: October 10, 2014 | Current use: Residential | Permit id: Bld2014-06159 | |||||
SCORE 66 Condo int only remodel k. A. Rmf-75, historic, no ext work a. S. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: February 26, 2015 | Current use: Residential | Permit id: Bld2014-05817 | |||||
SCORE 66 Remodel of condo unit ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: February 26, 2015 | Current use: Residential | Permit id: Bld2014-06633 | |||||
SCORE 66 8-fixtures wsc is contractor & ellett is the homeowner ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: February 26, 2015 | Current use: Residential | Permit id: Bld2014-07759 | |||||
SCORE 66 Change ductwork layout on existing hvac system. ![]() ![]() Permit type: Mechanical | Permit status: Pass | Completion date: February 25, 2015 | Current use: Residential | Permit id: Bld2014-07802 | |||||
SCORE 66 Electrical only. No building permit on file remodel. Inspection required. Kitchen remodel ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: February 26, 2015 | Current use: Residential | Permit id: Bld2014-08584 | |||||
SCORE 82 Interior non-structural demo r. M. K. B. ![]() ![]() Permit type: Permit | Permit status: Completed | Completion date: December 15, 2014 | Current use: Residential | Permit id: Bld2014-09116 | |||||
SCORE 82 Condo remodel. Plumbing and electrical permits required. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: February 17, 2015 | Current use: Residential | Permit id: Bld2015-01048 | |||||
SCORE 69 3/4 bathroom remodel. Move water and drain lines from existing tub to accommodate new shower only. Move plumbing for lav. ![]() ![]() Permit type: Plumbing | Permit status: Reviews not require | Completion date: February 25, 2015 | Current use: Residential | Permit id: Bld2015-01262 | |||||
SCORE 69 Remodel in bedroom, bath, hallway, and office ![]() ![]() Permit type: Electrical | Permit status: Accepted | Completion date: March 16, 2015 | Current use: Residential | Permit id: Bld2015-01688 | |||||
Minimum electrical permit. ![]() Permit type: Electrical | Permit status: Pass | Completion date: February 19, 2014 | Current use: Residential | Permit id: Bld2014-00593 | |||||
Elec work for kitchen remodel ![]() Permit type: Electrical | Permit status: Pass | Completion date: January 31, 2014 | Current use: Residential | Permit id: Bld2014-00383 | |||||
Furnace replacement ![]() Permit type: Mechanical | Permit status: Pass | Completion date: August 23, 2013 | Current use: Residential | Permit id: Bld2013-02344 | |||||
SCORE 66 1-bathtub, 1-shower, 1-kitchen sink, 2-wash basins, 4-dist. Piping, 5-drains. Interior remodel, no structural work, new cabinets in kitchen, new appliances, new elec, new plmbg fixtures r. M. Interior remodel only a. H. ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: June 7, 2013 | Current use: Residential | Permit id: Bld2013-01903 | |||||
SCORE 66 Remodel of condo unit ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: June 6, 2013 | Current use: Residential | Permit id: Bld2013-01495 | |||||
SCORE 66 Interior remodel, no structural work, new cabinets in kitchen, new appliances, new elec, new plmbg fixtures r. M. Interior remodel only a. H. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: February 22, 2013 | Current use: Residential | Permit id: Bld2013-01006 | |||||
2-make-up air burners between 300k to 1m btu. ![]() Permit type: Mechanical | Permit status: Reviews not require | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2013-01536 | |||||
SCORE 64 Stone veneer installed per ibc 1405. 7 #2 l. L. Residential condo in the rmf-75 zoning district, capitol hill historic, no zoning issues for new stone veneer siding per coa, plnhlc2012-00743 a. A. ![]() ![]() Permit type: Permit | Permit status: Pass | Completion date: December 13, 2012 | Current use: Residential | Permit id: Bld2012-07764 | |||||
Replacing existing swamp coolers with same master cool units. ![]() Permit type: Mechanical | Permit status: On-line ready | Completion date: June 2, 2010 | Current use: Residential | Permit id: Bld2010-03639 | |||||
SCORE 59 Replacing bathtub ![]() ![]() Permit type: Plumbing | Permit status: Inspections | Completion date: December 23, 2015 | Current use: Residential | Permit id: Bld2015-10918 | |||||
SCORE 61 Interior remodel kitchen, bathroom upgrade, insulation. Patch & repair sheetrock, millwork electrical upgrade, finishes, doors (interior). Mep permits reqd applicant applied as homeowner. ![]() ![]() Permit status: Inspections | Completion date: November 23, 2015 | Current use: Residential | Permit id: Bld2015-10156 | |||||
This property in a local historic district. Planning approval is required before we can proceed with a building permit. Please contact planning @ 801-535-77 or make application online for a historic landmark approval through the planning tab. Es report also required for building code dept. 1. Remove the existing roof ballast from the roof and job site. 2. Prepare the existing roof surface for an overlay application. 3. Mechanically fasten inch fan fold insulation to wood deck. 4. Mechanically fasten a mil sarnafil sikaplan pvc roof membrane over the fan fold insulation. This membrane will be a white membrane. 5. Install new white pvc coated drip metal to the wood deck. 6. Install all new base-flashing along all vertical walls that intersects the slope of your roof. 7. Install all new pipe boots on all pipes. 8. Install walk pad around the base of the ac units. 9. Remove all associated roof debris and leave the job site neat and clean. ![]() Permit type: Roofing | Permit status: Closed | Completion date: August 5, 2015 | Current use: Commercial | Permit id: Bld2014-04862 | |||||
SCORE 66 Remodel bathroom for handicap access. No additional fixtures. Plumbing and electrical reqd. ![]() ![]() Permit status: Inspections | Completion date: May 24, 2016 | Current use: Residential | Permit id: Bld2016-04947 | |||||
SCORE 59 Repair to water pipe done previously (emergency repair). Replace damaged drywall and trim as necessary. No other work under this permit. Plumbing permit reqd. ![]() ![]() Permit status: Closed | Completion date: May 13, 2016 | Current use: Residential | Permit id: Bld2016-03589 | |||||
SCORE 82 Condo remodel. Plumbing and electrical permits required. ![]() ![]() Permit status: Closed | Completion date: November 20, 2015 | Current use: Residential | Permit id: Bld2015-01048 | |||||
SCORE 69 Remodel in bedroom, bath, hallway, and office ![]() ![]() Permit type: Electrical | Permit status: Closed | Completion date: November 20, 2015 | Current use: Residential | Permit id: Bld2015-01688 | |||||
SCORE 59 Bathroom remodel. Plumbing permit reqd. ![]() ![]() Permit status: Inspections | Completion date: May 5, 2016 | Current use: Residential | Permit id: Bld2016-04334 | |||||
SCORE 59 1 shower 1 wash basin 1 water closet for plumbing permit ![]() ![]() Permit type: Plumbing | Permit status: Inspections | Completion date: May 17, 2016 | Current use: Residential | Permit id: Bld2016-04686 | |||||
SCORE 59 Kitchen upgrade, finishes, millwork, 2nd sink bathroom. E& p reqd. ![]() ![]() Permit status: Inspections | Completion date: July 11, 2016 | Current use: Residential | Permit id: Bld2016-06470 | |||||
SCORE 59 Water piping & modify soil, waste vent pipe ![]() ![]() Permit type: Plumbing | Permit status: Closed | Completion date: April 19, 2016 | Current use: Residential | Permit id: Bld2016-03612 | |||||
SCORE 59 Interior remodel of kitchen- move from dining area to new kitchen dining area. ![]() ![]() Permit status: Inspections | Completion date: July 22, 2016 | Current use: Residential | Permit id: Bld2016-06887 | |||||
SCORE 69 3/4 bathroom remodel. Move water and drain lines from existing tub to accommodate new shower only. Move plumbing for lav. ![]() ![]() Permit type: Plumbing | Permit status: Closed | Completion date: November 20, 2015 | Current use: Residential | Permit id: Bld2015-01262 | |||||
SCORE 66 Remodel a few things ![]() ![]() Permit type: Electrical | Permit status: Pass | Completion date: March 27, 2013 | Current use: Residential | Permit id: Bld2012-08454 | |||||
SCORE 66 1 clothes washer (res), 1 dishwasher (res), 1 laundry tub, 3 showers, 1 kitchen sink, 3 wash basins (lavs), 3 water closets ( 1. 6 gal) ![]() ![]() Permit type: Plumbing | Permit status: Pass | Completion date: April 2, 2013 | Current use: Residential | Permit id: Bld2012-08323 | |||||
SCORE 66 Interior remodel of condo. Zone - rmf-75. Location within a hlc district. Interior work only. Windows will remain the same. D. D. N. L. ![]() ![]() Permit type: Permit | Permit status: In progress | Completion date: October 31, 2012 | Current use: Residential | Permit id: Bld2012-08076 | |||||
Clean up and redecorate - interior work on unit b1002, work per scope of work new closet, kitchen cabinets, electrical, flooring, paint, electrical, plumbing permits required. Letter dated 6/19/12 from homeowner assoc. Mailed. Zone - rmf-75, sf condo, in historical district unit #b1002, interior remodel only - owners assoc. Letter provided. J. U. ![]() Permit type: Permit | Permit status: Pass | Completion date: August 17, 2012 | Current use: Residential | Permit id: Bld2012-04480 | |||||
Elec work for remodel ![]() Permit type: Electrical | Permit status: Pass | Completion date: August 8, 2012 | Current use: Residential | Permit id: Bld2012-04422 | |||||
Furnace replacement ![]() Permit type: Mechanical | Permit status: Pass | Completion date: March 28, 2012 | Current use: Residential | Permit id: Bld2012-00552 | |||||
SCORE 59 Install 3 water closets for interior remodel ![]() Permit type: Plumbing | Permit status: On-line ready | Completion date: February 22, 2010 | Current use: Residential | Permit id: Bld2010-00892 | |||||
SCORE 59 Interior remodel of kitchen & changing sitting room to office & a hobby room. No bearing walls moved & new wall (non bearing) constructed. Elec, plmb, mech permits reqd. Rmf-75 sf condo on 10th flr hist dist, interior only. Ju ![]() Permit type: Permit | Permit status: Pass | Completion date: May 28, 2010 | Current use: Residential | Permit id: Bld2010-00764 | |||||
Install an air handler in unit 204 ![]() Permit type: Mechanical | Permit status: Reviews not require | Completion date: June 19, 2009 | Current use: Residential | Permit id: Bld2009-03589 |