Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Instalation of new masonry lintael and steel column in rear wall as prescribed by engineer. Date: October 26, 2017 Contractor: Sab Construction And Management Client: Propped Up Llc | Permit type: Alteration permit | Permit status: Active | Completion date: November 30, 2017 | Permit id: 826843 | |||||
SCORE 100 Install (1) gas furnace with ductwork. (sfd) Date: December 13, 2017 Contractor: Above And Below Heating And Air Client: Philadelphia Lotus 2 Llc | Client Company: Cal 750424 | Permit type: Mechanical permit | Permit status: Active | Completion date: December 13, 2017 | Permit id: 839087 | |||||
SCORE 89 Ez permit stadards alterations- for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: December 6, 2017 Contractor: Sab Construction And Management Client: Philadelphia Lotus 2 Llc | Client Company: Cal 750424 | Permit type: Alteration permit | Permit status: Active | Completion date: December 6, 2017 | Permit id: 837364 | |||||
SCORE 82 1 amp service & rewire with outlets, lights, switches, fixtures, smoke co detectors as per nec 2008 east district Date: December 7, 2017 Contractor: Terox Electric And Construction Client: Philadelphia Lotus 2 Llc | Client Company: Cal 750424 | Permit type: Electrical permit | Permit status: Active | Completion date: December 7, 2017 | Permit id: 837794 | |||||
SCORE 100 1. 5 bath and kitchen (potable water and drain)(sfd)the installation will comply with the philadelphia plumbing code 2004 Date: December 8, 2017 Contractor: Shegda Construction Corp Client: Philadelphia Lotus 2 Llc | Client Company: Cal 750424 | Permit type: Plumbing permit | Permit status: Active | Completion date: December 8, 2017 | Permit id: 838071 |