Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 Modernize one (1) 5-floor,8-openings,hydraulic passengers elevator located in university hall. Includingnew controller, car operating panel, cab, hall stations, (2) door operators,new hoistway hanger tracks,hangers, doors,power unit(tank,submersible pumping unit,motor,pump,control valve, shut off valve,and all necessary piping & wiring required. Pursuant to scope of work submitted. Permit type: Permit - elevator eq | Permit id: 100393683 | |||||
SCORE 89 Modernize one (1) 5-floor,8-openings,hydraulic passengers elevator located in university hall. Includingnew controller, car operating panel, cab, hall stations, (2) door operators,new hoistway hanger tracks,hangers, doors,power unit(tank,submersible pumping unit,motor,pump,control valve, shut off valve,and all necessary piping & wiring required. Pursuant to scope of work submitted. Permit type: Permit - elevator equipment | Permit id: 100393683 |