Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Wire and install a new 4 amp one meter 3 phase service for the building. Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E207839 | |||||
Sidewalk deposit during construction / this is not a permit to excavate and/or occupy / deposit will be returned if the sidewalks are restored to city standards.; [ concrete sdwks are not to be poured until spring ]; permit fee 60. 00; inspection fee 100. 00; deposit:; 1 338. 75 Date: December 13, 2012 Permit type: Sidewalk deposit | Permit status: Na | Permit id: Sdep-207772 |