Wood trellis & 2 bbqs (near building 1) Date: October 7, 2009 Value: $6,160 Applicant: Same As Owner | Permit status: Finaled | Completion date: November 2, 2009 | Expiration date: October 7, 2010 | Permit id: 910050070 | |||||
Sewer connections bldg 1,7 units,101 1+38,102 2+14,103 2+04, 104 1+82,105 1+72,106 1+50,107 1+28 manhole reference 1+62. 82 and 1+00. 00 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190004 | |||||
SCORE 86 New 3-story 7 unit condo (bldg 1-3-5 same plan) Engineer: Withee Malcom Architects | Applicant: At La Ventanas Llc | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 608250020 | |||||
SCORE 86 Electrical plancheck for units 101-107 Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 706270051 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060008 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707020006 | |||||
SCORE 86 Plumbing fixtures for apt bldg Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707020011 | |||||
SCORE 86 New 3-story 7 unit condo (bldg 1-3-5 same plan) Engineer: Withee Malcom Architects | Applicant: At La Ventanas Llc | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 608250020 | |||||
SCORE 86 Electrical plancheck for units 101-107 Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 706270051 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060008 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707020006 | |||||
SCORE 86 Plumbing fixtures for apt bldg Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707020011 | |||||
SCORE 86 Plumbing fixtures Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 707030003 | |||||
Sewer connection bldg 3, 7 units,301 2+17,302 1+46,303 1+56, 304 1+78,305 1+80,306 2+10,307 2+27 manhole reference 2+56. And 2+07. 00 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190006 | |||||
SCORE 86 New 3-story 7 unit condo (bldg 1-3-5 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 608250026 | |||||
SCORE 86 Electrical Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 706280050 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060010 | |||||
SCORE 86 New 3-story 7 unit condo (bldg 1-3-5 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 608250026 | |||||
SCORE 86 Electrical Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 706280050 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc- | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060010 | |||||
SCORE 86 Plumbing fixtures Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 707030003 | |||||
Sewer connection bldg 5, 7 units,501 4+48,502 1+50,503 1+60, 504 1+82,505 1+92,506 2+07,507 4+58 manhole reference 4+89. And 2+07. 00 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190008 | |||||
SCORE 79 New 3-story 7 unit condo (bldg 1-3-5 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 608250029 | |||||
SCORE 79 Electrical fixtures - bldg 5 Date: November 9, 2007 Contractor: W D Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 706280048 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060012 | |||||
SCORE 79 Hvac for multi-family residences Date: November 9, 2007 Contractor: W D Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030014 | |||||
SCORE 79 Plumbing fixtures Date: November 9, 2007 Contractor: W D Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030006 | |||||
SCORE 74 New 3-story 7 unit condo (bldg 1-3-5 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 608250029 | |||||
SCORE 74 Electrical fixtures - bldg 5 Date: November 9, 2007 Contractor: W D Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 706280048 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060012 | |||||
SCORE 74 Hvac for multi-family residences Date: November 9, 2007 Contractor: W D Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030014 | |||||
SCORE 74 Plumbing fixtures Date: November 9, 2007 Contractor: W D Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030006 | |||||
Sewer connection bldg 2, 7 units,201 1+50,202 2+14,203 1+98, 204 1+88,205 1+66,206 1+31,207 1+ manhole reference 1+56. 81 and 2+60. 33 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190005 | |||||
SCORE 86 New 3 story 7 unit condo (bldg 2-4-6 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 608250030 | |||||
SCORE 86 Electrical plan check fee Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: August 20, 2008 | Permit id: 706280051 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060009 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: August 20, 2008 | Permit id: 707020017 | |||||
SCORE 86 Plumbing fixtures Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: August 20, 2008 | Permit id: 707020030 | |||||
SCORE 86 New 3 story 7 unit condo (bldg 2-4-6 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: September 8, 2009 | Expiration date: August 20, 2008 | Permit id: 608250030 | |||||
SCORE 86 Electrical plan check fee Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: August 20, 2008 | Permit id: 706280051 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc- | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060009 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: August 20, 2008 | Permit id: 707020017 | |||||
SCORE 86 Plumbing fixtures Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: August 20, 2008 | Permit id: 707020030 | |||||
Sewer connection bldg 4, 7 units,401 3+06,402 5+06,403 5+16, 404 1+72,405 1+94,406 2+10,407 2+96 manhole reference 3+74. 71 and 2+07. 00 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190007 | |||||
SCORE 86 New 3 story 7 unit condo (bldg 2-4-6 same plan) permit for 3 model units only, per e. B. Engineer: Withee Malcom Architects | Applicant: Joelson Efrem | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 608250031 | |||||
SCORE 91 Electrical plan check fee Date: July 13, 2007 Contractor: Temporary Power Systems Applicant: Temporary Power Systems | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 706280049 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060011 | |||||
SCORE 86 Hvac Date: July 13, 2007 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 707030010 | |||||
SCORE 86 Plumbing fixtures Date: July 13, 2007 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 707030004 | |||||
SCORE 86 New 3 story 7 unit condo (bldg 2-4-6 same plan) permit for 3 model units only, per e. B. Engineer: Withee Malcom Architects | Applicant: Joelson Efrem | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 608250031 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060011 | |||||
SCORE 86 Hvac Date: July 13, 2007 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 707030010 | |||||
SCORE 86 Plumbing fixtures Date: July 13, 2007 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: January 9, 2008 | Permit id: 707030004 | |||||
Sewer connection bldg 6, 7 units,601 5+36,602 1+40,603 1+66, 604 1+76,605 1+97,606 2+07,607 5+22 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190009 | |||||
SCORE 79 New 3 story 7 unit condo (bldg 2-4-6 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 608250034 | |||||
SCORE 79 Electrical fixtures for multi-residential bldg Date: November 9, 2007 Contractor: W D Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 706270053 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060013 | |||||
SCORE 79 Hvac Date: November 9, 2007 Contractor: W D Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030016 | |||||
SCORE 79 Plumbing fixtures Date: November 9, 2007 Contractor: W D Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030010 | |||||
SCORE 74 New 3 story 7 unit condo (bldg 2-4-6 same plan) Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 608250034 | |||||
SCORE 74 Electrical fixtures for multi-residential bldg Date: November 9, 2007 Contractor: W D Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 706270053 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060013 | |||||
SCORE 74 Hvac Date: November 9, 2007 Contractor: W D Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030016 | |||||
SCORE 74 Plumbing fixtures Date: November 9, 2007 Contractor: W D Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: May 7, 2008 | Permit id: 707030010 | |||||
SCORE 100 Pex water re-pipe Date: January 15, 2015 Contractor: All American Repipe Applicant: Nick Kongmani | Permit status: Finaled | Completion date: January 20, 2015 | Expiration date: January 15, 2016 | Permit id: 1501150016 | |||||
Sewer connection bldg 7, 11 units,701 1+51,702 4+20,703 4+41 704 4+51,705 4+73,706 4+83,707 5+06,708 5+16,709 5+37,7 5+53,711 1+41 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190010 | |||||
SCORE 86 New 3 story 11 unit condo Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 608250037 | |||||
SCORE 86 Plancheck fee for units 701-711 Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 706270054 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060015 | |||||
SCORE 86 Hvac for apartments Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 706290011 | |||||
SCORE 86 Plumbing fixtures for condos Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 707030012 | |||||
SCORE 86 New 3 story 11 unit condo Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 608250037 | |||||
SCORE 86 Plancheck fee for units 701-711 Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 706270054 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060015 | |||||
SCORE 86 Hvac for apartments Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 706290011 | |||||
SCORE 86 Plumbing fixtures for condos Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: February 18, 2009 | Expiration date: August 20, 2008 | Permit id: 707030012 | |||||
Sewer connection bldg 8, 11 units,801 1+51,802 3+33,803 3+23 804 3+01,805 2+91,806 2+69,807 2+58,808 2+36,809 2+26, 8 2+04,811 1+41 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190011 | |||||
SCORE 86 New 3 story 11 unit condo Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: July 21, 2009 | Expiration date: August 20, 2008 | Permit id: 608250040 | |||||
SCORE 86 Electrical fixtures Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Permisud | Expiration date: August 20, 2008 | Permit id: 706280052 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060016 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: July 21, 2009 | Expiration date: August 20, 2008 | Permit id: 707030018 | |||||
SCORE 86 New 3 story 11 unit condo Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: July 21, 2009 | Expiration date: August 20, 2008 | Permit id: 608250040 | |||||
SCORE 86 Electrical fixtures Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Permisud | Expiration date: August 20, 2008 | Permit id: 706280052 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060016 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: July 21, 2009 | Expiration date: August 20, 2008 | Permit id: 707030018 | |||||
Sewer connection bldg 9, units,901 1+51,902 1+21,903 1+ 904 1+11,905 1+32,906 1+42,907 1+64,908 1+74,909 1+95,9 1+42 Date: November 19, 2009 Applicant: Same As Owner | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: November 19, 2010 | Permit id: 911190012 | |||||
SCORE 86 New 3 story unit condo Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 608250041 | |||||
SCORE 86 Plancheck fee for units 901-9 Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 706270055 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060017 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707030020 | |||||
SCORE 86 Plumbing fixtures Date: February 22, 2008 Contractor: Wd Contractors Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707030016 | |||||
SCORE 86 New 3 story unit condo Engineer: Withee Malcom Architects | Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 608250041 | |||||
SCORE 86 Plancheck fee for units 901-9 Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 706270055 | |||||
SCORE 86 House meter Date: March 6, 2008 Contractor: Wd Contractors, Inc Applicant: Wd Contractors, Inc. | Permit status: Finaled | Completion date: May 13, 2010 | Expiration date: September 2, 2008 | Permit id: 803060017 | |||||
SCORE 86 Hvac Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707030020 | |||||
SCORE 86 Plumbing fixtures Date: February 22, 2008 Contractor: Wd Contractors, Inc Applicant: Kao Mary | Permit status: Finaled | Completion date: November 3, 2009 | Expiration date: August 20, 2008 | Permit id: 707030016 | |||||
SCORE 86 Convert garage to sales office, convert sales office back to garage Applicant: Watt Communities | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: October 5, 2010 | Permit id: 910050069 | |||||
SCORE 86 Plumbing fixtures for garage Date: October 5, 2009 Contractor: Wd Contractors Inc Applicant: Watt Communities | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: October 5, 2010 | Permit id: 910050026 | |||||
SCORE 86 Electrical fixtures Date: October 5, 2009 Contractor: Wd Contractors Inc Applicant: Watt Communities | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: October 5, 2010 | Permit id: 910050037 | |||||
SCORE 86 Convert garage to sales office, convert sales office back to garage Applicant: Watt Communities- | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: October 5, 2010 | Permit id: 910050069 | |||||
SCORE 86 Electrical fixtures Date: October 5, 2009 Contractor: Wd Contractors, Inc Applicant: Watt Communities- | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: October 5, 2010 | Permit id: 910050037 | |||||
SCORE 86 Plumbing fixtures for garage Date: October 5, 2009 Contractor: Wd Contractors, Inc Applicant: Watt Communities- | Permit status: Finaled | Completion date: March 8, 2010 | Expiration date: October 5, 2010 | Permit id: 910050026 | |||||
SCORE 91 Install zp40a braker and l6. R plug for electric vehicle Date: April 18, 2011 Contractor: Sunwest Electric Applicant: Eastman, Shaun P. | Permit status: Finaled | Completion date: August 8, 2011 | Expiration date: April 17, 2012 | Permit id: 1104180039 | |||||
SCORE 91 Install zp40a braker and l6. R plug for electric vehicle Date: April 18, 2011 Contractor: Sunwest Electric Applicant: Eastman, Shaun P. | Permit status: Finaled | Completion date: August 8, 2011 | Expiration date: April 17, 2012 | Permit id: 1104180039 | |||||
SCORE 100 Electric vehicle charger Date: August 8, 2011 Contractor: On Target Electric Inc Applicant: Rubio Rubio | Permit status: Finaled | Completion date: October 11, 2011 | Expiration date: August 7, 2012 | Permit id: 1108080001 | |||||
SCORE 85 Electric vehicle charger Date: August 8, 2011 Contractor: On Target Electric, Inc Applicant: Rubio Rubio | Permit status: Finaled | Completion date: October 11, 2011 | Expiration date: August 7, 2012 | Permit id: 1108080001 | |||||
SCORE 100 Repipe house with pex Date: May 17, 2016 Contractor: Repipe 1 Applicant: Kingsland, Jon | Permit status: Finaled | Completion date: May 23, 2016 | Expiration date: May 17, 2017 | Permit id: 1605170029 |