Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Plumbing and gas Date: April 1, 2016 Contractor: James S Lynn Client: Gary A Nails | Permit status: Completed | Permit id: P1605083 | |||||
SCORE 93 Boiler Date: April 4, 2016 Contractor: Randy S. Chun Client: Gary A Nails | Permit status: Permit canceled | Permit id: Fb1600075 | |||||
SCORE 61 Mechanical Date: April 5, 2016 Contractor: Aaron Blake Client: Gary A Nails | Permit status: Permit issued | Permit id: M1601643 | |||||
SCORE 61 Mechanical Date: April 5, 2016 Contractor: Aaron Blake Client: Gary A Nails | Permit status: Permit issued | Permit id: M1601643 | |||||
SCORE 98 Plumbing and gas Date: April 1, 2016 Contractor: James S Lynn Client: Gary A Nails | Permit status: Completed | Permit id: P1605083 | |||||
SCORE 93 Boiler Date: April 4, 2016 Contractor: Randy S. Chun Client: Gary A Nails | Permit status: Permit canceled | Permit id: Fb1600075 | |||||
SCORE 93 Boiler Date: April 4, 2016 Contractor: Randy S. Chun Client: Gary A Nails | Permit status: Permit canceled | Permit id: Fb1600075 | |||||
SCORE 56 Painting install laminate flooring and carpet. Renovate bathroom in kind, replacement water heater. New hvac system. No relocation of plumbing fixtures, all same location, not exterior work. All alterations in kind. Date: March 22, 2016 Contractor: Gary Nails; Tauheed Burke Client: Gary A Nails | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605952 | |||||
SCORE 56 Revision to b1605952. Remove new vinyl soffits from main and porch roof and restore underlying wood (too coordinate with hpo if it is too damaged). Replace back and front door, front door to be painted wood five- or six-panel door. Restore front transom over entry door and restore trim around the transom and door to be a consistent continuous casing. Open partition wall leading to living room. Paint exterior stucco. Replace 22 nails create half wall at kitchen dining room,turn one the bedroom into closets. No walls being moved. Replace 4 columns in front. Replace portion of back deck and steps. Replace rotted wood boards of front porch decking and paint the new wood. Replace roof shingles with same color, reframe kitchen window on right side of property, new appliances, new cabinets. Correction items: remove vinyl soffits at main roof and porch roof, restore to original. If wood is damaged beyond repair consult with hpo before repairs or adjustments. Date: May 31, 2016 Contractor: Gary Nails Complete Enhancement Client: Gary A Nails | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1608657 | |||||
SCORE 98 Plumbing and gas Date: April 1, 2016 Contractor: James S Lynn Client: Gary A Nails | Permit status: Completed | Permit id: P1605083 | |||||
SCORE 61 Mechanical Date: April 5, 2016 Contractor: Aaron Blake Client: Gary A Nails | Permit status: Permit issued | Permit id: M1601643 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeileg6y%2fvbaeygx%2f88sunegz3 Date: August 17, 2016 Contractor: Gary Nails; Gary Nails; Eugene S Ahns Client: Gary Nails | Permit type: Electrical | Permit status: Completed | Permit id: E62838329 |