Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replacement of a 2. 5 ton a c unit Date: August 14, 2012 Contractor: Cooper Heating And Cooling Client: Charles Meredith,Barbara Meredith | Applicant: Cooper Heating & Cooling | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: August 27, 2012 | Current use: Single family d | |||||
SCORE 95 Total tear-off & reroof of sfd, 36 squares of asphalt shingles on a pitch represented as 4 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Charles Meredith | Permit type: Roofing | Permit status: Cmp | Completion date: September 13, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-04100 | |||||
SCORE 95 Replacement of a 2. 5 ton a c unit Client: Charles Meredith | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: August 27, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03969 | |||||
SCORE 95 Replace forced air furnace Client: Charles Meredith | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-05318 |