Building Permits at 2225 M Street Ne Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2225 M Street Ne Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
95
Excavate to connect customers stub at 2225 m street ne with underground service by building 65 service conduit from a proposed pole; sidewalk of m street east of 21st place ne as indicated on the attached prints. 53343325 a separate permit will be required if steel plates are utilized. Hours permitted to work are between 9: am to 3: pm monday thru friday.
Date:  November 15, 2010

Client: Pepco Phi Holdings, Inc | Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: February 2, 2011 | Permit id: Pa58615
2010/11/150952225 M Street Ne Washington DcPepco Phi Holdings Inc
SCORE
95
Install 65 of wire and remove of wire and install 1 pole on 2225 "m" street east of 21st place, ne as indicated on the attached prints. Wr# 53343325 gjn 1 calendar days
Date:  November 17, 2010

Client: Pepco Phi Holdings, Inc | Permit type: Over head work; string telecom wire/fiber, over head work; pole installation (each addl) | Permit status: Permit expired | Expiration date: May 23, 2011 | Permit id: Pa58668
2010/11/170952225 M Street Ne Washington DcPepco Phi Holdings Inc
SCORE
95
Excavate to connect customers stub at 2225 m street ne with underground service by building 65 service conduit from a proposed pole; sidewalk of m street east of 21st place ne as indicated on the attached prints. 53343325 a separate permit will be required if steel plates are utilized. Hours permitted to work are between 9: am to 3: pm monday thru friday.
Date:  February 14, 2011

Client: Pepco Phi Holdings, Inc | Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: March 19, 2011 | Permit id: Pa58615-R1
2011/02/140952225 M Street Ne Washington DcPepco Phi Holdings Inc
SCORE
95
Excavation; electric connection (trench)
Date:  February 14, 2011

Permit status: 8 | Expiration date: March 19, 2011 | Permit id: Pa58615-R1
2011/02/140952225 M Street Ne Washington DcPepco Phi Holdings Inc
SCORE
95
Over head work; string telecom wire fiber, over head work; pole installation (each addl)
Date:  November 22, 2010

Permit status: 8 | Expiration date: May 23, 2011 | Permit id: Pa58668
2010/11/220952225 M Street Ne Washington DcPepco Phi Holdings Inc
SCORE
95
Excavation; electric connection (trench)
Date:  December 14, 2010

Permit status: 8 | Expiration date: February 2, 2011 | Permit id: Pa58615
2010/12/140952225 M Street Ne Washington DcPepco Phi Holdings Inc
SCORE
95
Construction staging area
Contractor: Pepco Holdings Inc

Permit status: Withdrawn | Expiration date: April 30, 2011 | Permit id: 0
0952225 M Street Ne Washington DcPepco Holdings Inc
SCORE
95
Construction staging area
Contractor: Pepco Holdings Inc

Permit status: Withdrawn | Expiration date: April 30, 2011 | Permit id: 0
0952225 M Street Ne Washington DcPepco Holdings Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.