Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 23 sf re-roof () if a re-roof project is proposed, the following specifications apply. Existing roofing material build up roof proposed roofing material polyflex sa manufacturer polyglass brand and model polyflex sa color (if cool roof required) polyfresko esr-2018 system #15 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) n a Permit type: Addn | Permit status: Completed | Completion date: September 28, 2017 | Permit id: Pds2017-Resalt- | |||||
Permit renewal Date: August 30, 2017 Permit status: Done | Permit id: Pds2006-1006-20 | |||||
Stormwater insp Date: March 9, 2009 Permit status: Monitor | Permit id: Pds2006-1004-20 | |||||
Underground electrical Date: November 19, 2007 Permit status: Pass | Permit id: Pds2006-1004-20 | |||||
Combo frame Date: November 28, 2006 Permit status: Pass | Permit id: Pds2006-1006-20 |