SCORE 91 Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1/4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately Date: October 22, 2013 Contractor: Sam Connelly Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: February 11, 2014 | |||||
SCORE 79 Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted. Date: December 18, 2013 Contractor: Insight Llc Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: July 16, 2014 | |||||
SCORE 91 Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1 4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately Date: October 22, 2013 Contractor: Sam Connelly Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: February 11, 2014 | |||||
SCORE 79 Excavation; boring test pit (each addl), excavation; boring test pit (single) Contractor: Insight Llc Permit status: 3 | Expiration date: July 16, 2014 | Permit id: 0 | |||||
SCORE 91 Excavation; boring test pit (single) Contractor: Sam Connelly Permit status: 3 | Expiration date: February 11, 2014 | Permit id: 0 | |||||
SCORE 86 Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1 4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately Contractor: Connelly And Associates Inc Permit status: Cancel/withdrawn | Expiration date: February 11, 2014 | Permit id: 0 | |||||
SCORE 79 Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted. Contractor: Insight Llc Permit status: Cancel/withdrawn | Expiration date: July 16, 2014 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: August 8, 2013 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: September 18, 2013 | Permit id: Pa10108955 | |||||
SCORE 91 Excavation; boring test pit (single) Contractor: Sam Connelly Permit status: 3 | Expiration date: February 11, 2014 | Permit id: 0 | |||||
SCORE 79 Excavation; boring test pit (each addl), excavation; boring test pit (single) Contractor: Insight Llc Permit status: 3 | Expiration date: July 16, 2014 | Permit id: 0 | |||||
SCORE 79 Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted. Date: July 2, 2013 Contractor: Insight Llc Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 15, 2014 | Permit id: Pa84364 | |||||
SCORE 86 Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1 4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately Contractor: Connelly And Associates Inc Permit status: Cancel/withdrawn | Expiration date: February 11, 2014 | Permit id: 0 | |||||
SCORE 79 Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted. Contractor: Insight Llc Permit status: Cancel/withdrawn | Expiration date: July 16, 2014 | Permit id: 0 | |||||
SCORE 99 Construction staging area Date: September 10, 2013 Contractor: E2cr C O Siva Balu Permit status: Permit expired | Expiration date: October 16, 2013 | Permit id: Pa10108955-R1 |