Based on the information received from building department, associated with 2215 5th Street Ne Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
91
Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1/4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately
Date:  October 22, 2013
Contractor: Sam Connelly

Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: February 11, 2014
2013/10/220912215 5th Street Ne Washington DcSam Connelly
SCORE
79
Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted.
Date:  December 18, 2013
Contractor: Insight Llc

Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Approved (pending payment | Expiration date: July 16, 2014
2013/12/180792215 5th Street Ne Washington DcInsight Llc
SCORE
91
Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1 4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately
Date:  October 22, 2013
Contractor: Sam Connelly

Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Cancel/withdrawn | Expiration date: February 11, 2014
2013/10/220912215 5th Street Ne Washington DcSam Connelly
SCORE
79
Excavation; boring test pit (each addl), excavation; boring test pit (single)
Contractor: Insight Llc

Permit status: 3 | Expiration date: July 16, 2014 | Permit id: 0
0792215 5th Street Ne Washington DcInsight Llc
SCORE
91
Excavation; boring test pit (single)
Contractor: Sam Connelly

Permit status: 3 | Expiration date: February 11, 2014 | Permit id: 0
0912215 5th Street Ne Washington DcSam Connelly
SCORE
86
Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1 4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately

Permit status: Cancel/withdrawn | Expiration date: February 11, 2014 | Permit id: 0
0862215 5th Street Ne Washington DcConnelly And Associates Inc
SCORE
79
Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted.
Contractor: Insight Llc

Permit status: Cancel/withdrawn | Expiration date: July 16, 2014 | Permit id: 0
0792215 5th Street Ne Washington DcInsight Llc
SCORE
99
Construction staging area
Date:  August 8, 2013
Contractor: E2cr C O Siva Balu

Permit status: Permit expired | Expiration date: September 18, 2013 | Permit id: Pa10108955
2013/08/080992215 5th Street Ne Washington DcE2cr C O Siva Balu
SCORE
91
Excavation; boring test pit (single)
Contractor: Sam Connelly

Permit status: 3 | Expiration date: February 11, 2014 | Permit id: 0
0912215 5th Street Ne Washington DcSam Connelly
SCORE
79
Excavation; boring test pit (each addl), excavation; boring test pit (single)
Contractor: Insight Llc

Permit status: 3 | Expiration date: July 16, 2014 | Permit id: 0
0792215 5th Street Ne Washington DcInsight Llc
SCORE
79
Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted.
Date:  July 2, 2013
Contractor: Insight Llc

Client: Dc Water | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 15, 2014 | Permit id: Pa84364
2013/07/020792215 5th Street Ne Washington DcInsight Llc
SCORE
86
Dccr project proposes to drill 6 direct push boring nebbd-28e-1, nebbd-28e-2, nebbd-28e-3 & nebbd-29e-1, nebbd-29e-2 & nebbd-30e located at 2215 5th street ne. The dp borings will be 2 inches in diameter and extend feet below ground surface. The borings will be completed using direct push methods with a standard hollow soil rod to collect soil samples. Groundwater samples may be collected via a peristaltic pump. Samples will be analyzed for tph-dro, tph-gro, voc, svoc, rcra metals (plus vanadium), pesticides, herbicides and pcbs. All drill cuttings will be containerized in 55 gallon dot rated steel drums. All drill cuttings will be properly tested and characterized for disposal. The dp borings will be backfilled with hydrated bentonite. Monitoring wells will not be installed. When the boring is complete, we fill the borehole approximately 1 4 full of bentonite pellets then add approximately 5 gallons of water to hydrate bentonite in the borehole. The boring is then filled approximately

Permit status: Cancel/withdrawn | Expiration date: February 11, 2014 | Permit id: 0
0862215 5th Street Ne Washington DcConnelly And Associates Inc
SCORE
79
Dccr project proposes to excavate 3 shallow pits (nebbv-30, nebbv-31, nebbv-32) for the purpose of utility location along 5th st ne, between w street ne and rhode island ave ne. The pits will be approximately 1 foot in diameter and less than feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavation will be approximately 2 weeks and will require the full work time of 7am -7pm. Nebbv- and nebbv-31 will require the use of flagmen, while nebbv-32 will be completed in the parking lane of 5th st ne. Sidewalks, pedestrians and parking meters will not be impacted.
Contractor: Insight Llc

Permit status: Cancel/withdrawn | Expiration date: July 16, 2014 | Permit id: 0
0792215 5th Street Ne Washington DcInsight Llc
SCORE
99
Construction staging area
Date:  September 10, 2013
Contractor: E2cr C O Siva Balu

Permit status: Permit expired | Expiration date: October 16, 2013 | Permit id: Pa10108955-R1
2013/09/100992215 5th Street Ne Washington DcE2cr C O Siva Balu
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.