Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington estates Date: May 13, 2013 Permit status: Closed | Permit id: 13-01779 | |||||
SCORE 100 Wellington estates Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-01779 | Parcel: 1946868 | |||||
SCORE 95 Wellington estates Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-01779 | Parcel: 1946868 | |||||
March 26, 2013 1:08:59 pm rhurley. Received application via fax for set up of used dw mh 28x56; heat pump;wellington estates mhp; rlh; april 16, 2013 1:35: pm alishac. Premise number redacted phone number8. Adc.; may 13, 2013 4:22:25 pm ssalyer. Sls called in power;sls; may 13, 2013 4:19: pm ssalyer. Set up of used dw mh 28x56;wellington estates mhp; sls; post address numbers so they are visible from the street, 4 inch min. Height. Manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks Permit type: Permits - historical | Permit status: Closed | Permit id: 13-01779 | Parcel: 1946868 | |||||
Wellington estates Date: May 13, 2013 Value: $3,725 Permit type: Historical | Permit status: Closed | Permit id: 13-01779 | |||||
March 26, 2013 1:08:59 pm rhurley. Received application via fax for set up of used dw mh 28x56; heat pump;wellington estates mhp; rlh; april 16, 2013 1:35: pm alishac. Premise number redacted phone number8. Adc.; may 13, 2013 4:22:25 pm ssalyer. Sls called in power;sls; may 13, 2013 4:19: pm ssalyer. Set up of used dw mh 28x56;wellington estates mhp; sls; post address numbers so they are visible from the street, 4 inch min. Height. Manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks Date: May 13, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-01779 | Parcel: 1946868 |