Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Add patio door in dining room Client: Barry Prentice,Lena Prentice | Applicant: Barry Prentice | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 5, 2000 | Current use: Single family d | |||||
SCORE 56 Interior remodel and addition to single family residence. Addition of two car garage (627 sf), foyer, and master suite on main level (764 sf). Remodel of kitchen, dining, family room, gym, laundry, and bath on main level (1697). Addition of study and bath on second level (455 sf). Remodel of 3 bedrooms, 2 baths, and den (1009 sf). Includes new furnace, water heater, a c, upgrade to 2 amp service, and assoicated mep. Client: John Muller Zeh2 Llc | Applicant: John Muller Zeh2 Llc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount grid-tied 10. 72 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: September 18, 2013 Contractor: Namaste Solar Electric Inc Client: Llc Zeh2 | Applicant: Namaste Solar Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 28, 2014 | Current use: Single family d | |||||
SCORE 95 Place dumpster on street Date: October 25, 2013 Contractor: Eba Inc Client: Llc Zeh2 | Applicant: Eba Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Abandon existing 3 4inch water service meter,tap upsize water service meter to 1inch, remove and replace drive access to curbwalk as required per building permit pmt2013-01322 Date: November 15, 2013 Contractor: Bioterra Constructors Inc Client: Llc Zeh2 | Applicant: Bioterra Constructors Inc | Permit type: Right-of-way | Permit status: Iss | |||||
Interior remodel and addition to single family residence. Addition of two car garage (627 sf), foyer, and master suite on main level (764 sf). Remodel of kitchen, dining, family room, gym, laundry, and bath on main level (1697). Addition of study and bath on second level (455 sf). Remodel of 3 bedrooms, 2 baths, and den (1009 sf). Includes new furnace, water heater, a c, upgrade to 2 amp service, and assoicated mep. Date: May 22, 2013 Value: $747,500 Client: John | Permit type: Building, electrical, mechanical, plumbing, water | Permit status: Iss | Current use: Single family detached dwelling, additio | Permit id: Pmt2013-01322 | |||||
SCORE 95 Installation of a flush mount grid-tied 10. 72 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 28, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04283 | |||||
Add patio door in dining room Date: April 6, 2000 Value: $100 Client: Barry Prentice | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 5, 2000 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2000-01351 | |||||
Add patio door in dining room Date: April 6, 2000 Value: $1,000 Client: Barry Prentice | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 5, 2000 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2000-01351 |