Building Permits at 219 Western Av Allston MA 02134


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 219 Western Av Allston MA 02134 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Abandon inactive gas service; 5 x 4 rdwy; # 1381248190437; extension
Date:  October 31, 2013

Permit type: Maintenance | Permit id: Exca-29888
2013/10/31095219 Western Av Allston Ma 02134
SCORE
99
Complete demolition of existing structure
Date:  March 14, 2014
Value:   $100,000
Contractor: Diane Miller

Permit type: Demolition - exterio | Current use: Comm | Permit id: Sf341820
2014/03/1410000099219 Western Av Allston Ma 02134Diane Miller
SCORE
100
Furnish & install new fire alarm system for garage & (2) tenants at 219 western ave towers
Date:  March 27, 2014
Value:   $460,000
Contractor: John Mclaughlin

Permit type: Fire alarm | Current use: Comm | Permit id: Efa347289
2014/03/27460000100219 Western Av Allston Ma 02134John Mclaughlin
Abandon gas service; 5 x 4 rdwy;(money on deposit for sdwk); # 1396547880564; ds 2014-140-8568
Date:  April 22, 2014

Permit type: Maintenance | Permit id: Exca-35247
2014/04/22095219 Western Av Allston Ma 02134
Install (2) soil borings; all work 9:30am-3;30pm;
Date:  June 19, 2014

Permit type: Capital improvement | Permit id: Exca-37552
2014/06/19095219 Western Av Allston Ma 02134
Install new water sewer and fire pipe; 5x5; sdwk; ; 40x10; 43x5; rdwy sdwk; ; boston police a; rdwy sdwk; ; all work 9:30 am to 3:30 pm; ; ; maintain pedestrian safety % access; cobucs # 1396398170024; dig safe; #; 2014-350-3939; extension
Date:  August 27, 2014

Permit type: Service | Permit id: Exca-40193
2014/08/27095219 Western Av Allston Ma 02134
Install new water sewer and fire pipe; 5x5; sdwk; ; 40x10; 43x5; rdwysdwk; ; boston police a; rdwysdwk; ; all work 9: am to 3: pm; ; ; maintain pedestrian safety access; cobucs # 1396398170024; dig safe; #; 2014-350-3939; extension
Date:  May 26, 2015

Permit type: Service | Permit status: Expired | Permit id: Exca-401938
2015/05/26095219 Western Av Allston Ma 02134
SCORE
100
Installation shall be inaccordance with the requirements of 7 cmr 8th edition and nfpa 72 and nfpa 96
Date:  July 9, 2015
Contractor: John Mclaughlin

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf464409
2015/07/090100219 Western Av Allston Ma 02134John Mclaughlin
Install (2) soil borings; all work 9:30am-3;30pm;
Date:  June 19, 2014

Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-375520
2014/06/19095219 Western Av Allston Ma 02134
Sidewalk deposit during construction at barrys corner allston..; deposit covers 6 ramps and sidewalk area at 219 western ave and no. Harvard street; this is not a permit to occupy excavate andor install driveways; separate permits are required ; deposit will be returned if completed work meets city standards and federal slope requirements.; permit; 60. 00; inspection; 500. 00; deposit 64 000. 00;
Date:  January 29, 2014

Permit type: Sidewalk deposit | Permit status: Na | Permit id: Sdep-323004
2014/01/29095219 Western Av Allston Ma 02134
Installation of upho
Date:  June 24, 2015

Permit status: Na | Permit id: Chm487498
2015/06/24095219 Western Av Allston Ma 02134
Welding for installation of ;heating ventilation and air conditioning piping system dpl 103015 bfd paid detail required
Date:  June 10, 2015

Permit status: Na | Permit id: Cbw469128
2015/06/10095219 Western Av Allston Ma 02134
Welding only of steel reinforcement (re-bar) installation for concrete (dpl)
Date:  May 12, 2014

Permit status: Na | Permit id: Cbw360477
2014/05/12095219 Western Av Allston Ma 02134
Cutting burning &; welding for the installation of gas;piping &; water piping
Date:  May 9, 2014

Permit status: Na | Permit id: Cbw359936
2014/05/09095219 Western Av Allston Ma 02134
Burning of 8" &; 6" holes through metal stair landing;(dpl) sprinkler permit applied for (sprk#378715) &; attached
Date:  February 26, 2015

Permit status: Na | Permit id: Cbw449446
2015/02/26095219 Western Av Allston Ma 02134
Installation of inte
Date:  July 20, 2015

Permit status: Na | Permit id: Chm489857
2015/07/20095219 Western Av Allston Ma 02134
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdatr262455
2013/07/16095219 Western Av Allston Ma 02134
Cuttingburning of steel safety stanchions for construction project; dpl 92815
Date:  May 20, 2015

Permit status: Na | Permit id: Cbw471135
2015/05/20095219 Western Av Allston Ma 02134
Interior demo abatement &; demo of existing 1-story;structure;
Date:  January 22, 2014

Permit status: Na | Permit id: Fdc318099
2014/01/22095219 Western Av Allston Ma 02134
Installation inaccordance with nfpa 13 nfpa 14 ;nfpa and 7 cmr
Date:  July 15, 2014

Permit status: Na | Permit id: Sprk378715
2014/07/15095219 Western Av Allston Ma 02134
Light gauge metal &; panel fabrication weld pedestal a base of panel &; bar joist to tube steel top of panel
Date:  September 29, 2014

Permit status: Na | Permit id: Cbw411574
2014/09/29095219 Western Av Allston Ma 02134
Installation shall be inaccordance with nfpa standards and 7 cmr 8th edition
Date:  July 22, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk493839
2015/07/22095219 Western Av Allston Ma 02134
SCORE
88
Install wireless radio transmitter at main fire alarm control panel inaccordance with nfpa 72 section 26. 6. 3. 3. 2
Date:  September 19, 2012

Permit status: Na | Permit id: Bfdf180873
2012/09/19088219 Western Av Allston Ma 02134Paul Dunphy Harvard University
Cut &; cap of all fire lines for the complete demo of building @ 219 western ave. In brighton bfd paid detail required 1 firefighter
Date:  December 10, 2013

Permit status: Na | Permit id: Sprk300963
2013/12/10095219 Western Av Allston Ma 02134
Cutting burning welding for installation of steel sheet piles in support of excavation system for new building construction (dpl)
Date:  April 15, 2014

Permit status: Na | Permit id: Cbw351291
2014/04/15095219 Western Av Allston Ma 02134
SCORE
96
Erect a 325 unit apartment building
Date:  July 16, 2015
Contractor: Jason Nadeau

Permit type: Bfd other | Permit status: Na | Permit id: Fdc491761
2015/07/16096219 Western Av Allston Ma 02134Jason Nadeau
Abandon inactive gas service; 5 x 4 rdwy; # 1381248190437; extension
Date:  October 31, 2013

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-298881
2013/10/31095219 Western Av Allston Ma 02134
Cutting of structural steel (framing) ...(dpl 4-11-2014); bfd paid detail required
Date:  March 13, 2014

Permit status: Na | Permit id: Cbw342913
2014/03/13095219 Western Av Allston Ma 02134
Complete demo of existing structure
Date:  January 10, 2014

Permit status: Na | Permit id: Fdc317921
2014/01/10095219 Western Av Allston Ma 02134
Install new water sewer and fire pipe; 5x5; sdwk; / 40x10; 43x5; rdwy/sdwk; / boston police a; rdwy/sdwk; / all work 9: am to 3: pm; / ; maintain pedestrian safety access; cobucs # 1396398170024; dig safe; #; 2014-350-3939; extension
Date:  May 26, 2015

Permit type: Service | Permit status: Expired | Permit id: Exca-401938
2015/05/26095219 Western Av Allston Ma 02134
Installation of floo
Date:  June 24, 2015

Permit status: Na | Permit id: Chm487679
2015/06/24095219 Western Av Allston Ma 02134
Cutting / welding for installation of heating ventilation and air conditioning piping system for new construction of building (dpl)
Date:  November 12, 2014

Permit status: Na | Permit id: Cbw424008
2014/11/12095219 Western Av Allston Ma 02134
Cutting burning &; welding of steel relieving angles steel channel for;mock-u (foundation footing) ;framing erection &; decking ;(dpl12 -31-2014) ;;
Date:  May 15, 2014

Permit status: Na | Permit id: Cbw361318
2014/05/15095219 Western Av Allston Ma 02134
Welding; of tie feet to spandrel steel on the tie floors &; angles from the landing gates to existing steel
Date:  November 7, 2014

Permit status: Na | Permit id: Cbw422230
2014/11/07095219 Western Av Allston Ma 02134
Occupy manhole on sidewalk/ stand truck at curb / 2 police details area d 343-4210
Date:  August 5, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-319301
2014/08/05095219 Western Av Allston Ma 02134
Cutting / burning / welding for installation of new dock leveler (dpl)
Date:  July 20, 2011

Permit status: Na | Permit id: Cbw85641
2011/07/20095219 Western Av Allston Ma 02134
Cutting / burning / welding for installation of new stairs (dpl)
Date:  July 20, 2011

Permit status: Na | Permit id: Cbw82240
2011/07/20095219 Western Av Allston Ma 02134
Operation for the erection of light gauge metal panel fabrications and steel bar joist systems bfd paid detail required
Date:  September 23, 2014

Permit status: Na | Permit id: Cbw407848
2014/09/23095219 Western Av Allston Ma 02134
Cutting of rebar associated with construction of barrys corner (dpl 10-1-2014)
Date:  April 4, 2014

Permit status: Na | Permit id: Cbw348870
2014/04/04095219 Western Av Allston Ma 02134
Install handrails guardrails ladders seating stairs and other misc metal for new construction.
Date:  August 25, 2014

Permit status: Na | Permit id: Cbw397827
2014/08/25095219 Western Av Allston Ma 02134
Construction of a new 9 &; 6 story appartment building
Date:  November 19, 2014

Permit status: Na | Permit id: Fdc427443
2014/11/19095219 Western Av Allston Ma 02134
Date:  January 7, 2014

Permit status: Na | Permit id: Asb317197
2014/01/07095219 Western Av Allston Ma 02134
Cutting / burning / welding / brazing / soldering for installation of new heating and air conditioning piping system for construction of new building
Date:  November 3, 2014

Permit status: Na | Permit id: Cbw419973
2014/11/03095219 Western Av Allston Ma 02134
To conduct the following: store propane for hoc heaters to melt/dry decks and concrete five (5) 25lb propane tanks : applicant to follow nfpa 241 : also to store fuels in proper storage locker/cages : protected from vehicle traffic
Date:  October 17, 2014

Permit type: Bfd other | Permit status: Na | Permit id: Gp414004
2014/10/17095219 Western Av Allston Ma 02134
Install electrical conduit; 56 x 2 rdwy; riley bros
Date:  March 24, 2015

Permit type: Service | Permit status: Expired | Permit id: Exca-455985
2015/03/24095219 Western Av Allston Ma 02134
To conduct the following: 1 gallons of 1993 diesel fuel hi michael townes i m emailing you back about the application i brought in yesterday. I guess i left the line "to conduct the following" blank. That line should read "to store 1 gallons of (1993) diesel fuel for weld welding machines". Also i have here a pic of the fuel cell that we will be using. There will be concrete barriers around the cell for protection against traffic as well. Thank you pamela norton /allied pile driving
Date:  April 9, 2014

Permit type: Bfd other | Permit status: Na | Permit id: Gp350969
2014/04/09095219 Western Av Allston Ma 02134
To conduct the following: for use of temporary portable heater two ;(2) model#sh-20 two (2) sh-40 &; one (1) idf 5 heater located at gound level outside of building duct work will be used to move heat up into building for concrete placements spray fireproofing and interior rough.;fuel type: natural gas;: applicant must monitor for co levels and record results
Date:  December 4, 2014

Permit type: Temporary heat | Permit status: Na | Permit id: Gp427793
2014/12/04095219 Western Av Allston Ma 02134
Welding only;of metal frame for a 35-cubic ft brick;gas kiln (dpl 4-30-12) bfd paid detail required
Date:  February 16, 2012

Permit status: Na | Permit id: Cbw119460
2012/02/16095219 Western Av Allston Ma 02134
Bagging of smoke detectors
Date:  August 13, 2015

Permit status: Na | Permit id: Bsd506325
2015/08/13095219 Western Av Allston Ma 02134
Cutting burning &; welding of hand/guard rails ladders grating cmu clips stairs &; other misc metal fabrications (dpl) paid fire detail is now required
Date:  March 12, 2015

Permit status: Na | Permit id: Cbw450806
2015/03/12095219 Western Av Allston Ma 02134
SCORE
100
Phase -2 219 western ave. Phased application: south building floor 3-6 as second phase occupancy. North tower 1st floor garage & second floor south are phase 1
Date:  July 9, 2015
Contractor: John Mclaughlin

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf482721
2015/07/090100219 Western Av Allston Ma 02134John Mclaughlin
Temporary placement of dumbster;
Date:  November 19, 2014

Permit status: Na | Permit id: Td427446
2014/11/19095219 Western Av Allston Ma 02134
To conduct the following: using a diesel fired hot kettle to apply hot melt asphalt waterproofing above grade on ground level plaza and 2nd floor terrace : proper fire extinguisher required
Date:  May 8, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Gp470552
2015/05/08095219 Western Av Allston Ma 02134
Cutting &; burning;of steel for bldg mock-up (dpl)
Date:  July 10, 2014

Permit status: Na | Permit id: Cbw376998
2014/07/10095219 Western Av Allston Ma 02134
Abandon gas service; 5 x 4 rdwy;(money on deposit for sdwk); # 1396547880564; ds 2014-140-8568
Date:  April 22, 2014

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-352470
2014/04/22095219 Western Av Allston Ma 02134
Install conduit; 75 x 2 and 1 x 2; rdwy/sdwk / boston police area d; 343-4210; maintain pedestrian safety / parking lane and pedestrian walkway available at close of work day / pedestrian ramps damaged during construction are required to be restored to city and ada standards by; liberty concrete; extension
Date:  April 21, 2015

Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-462793
2015/04/21095219 Western Av Allston Ma 02134
Excavation permit
Date:  April 21, 2015

Permit type: Capital improvement | Permit id: Exca-462793
2015/04/21095219 Western Av Allston Ma 02134
Excavation permit
Date:  May 26, 2015

Permit type: Service | Permit id: Exca-401938
2015/05/26095219 Western Av Allston Ma 02134
Excavation permit
Date:  March 24, 2015

Permit type: Service | Permit id: Exca-455985
2015/03/24095219 Western Av Allston Ma 02134
Install new water sewer and fire pipe; 5x5; sdwk; ; 40x10; 43x5; rdwy sdwk; ; boston police a; rdwy sdwk; ; all work 9: am to 3: pm; ; ; maintain pedestrian safety access; cobucs # 1396398170024; dig safe; #; 2014-350-3939; extension
Date:  May 26, 2015

Client: President And Fellows Of | Permit type: Service | Permit status: Expired | Permit id: Exca-401938 | Parcel: 2200534000
2015/05/26095219 Western Av Allston Ma 02134
Install conduit; 75 x 2 and 1 x 2; rdwy sdwk ; boston police area d; 343-4210; maintain pedestrian safety ; parking lane and pedestrian walkway available at close of work day ; pedestrian ramps damaged during construction are required to be restored to city and ada standards by; liberty concrete; extension
Date:  April 21, 2015

Client: President And Fellows Of | Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-462793 | Parcel: 2200534000
2015/04/21095219 Western Av Allston Ma 02134
Excavation permit
Date:  April 21, 2015

Client: President And Fellows Of | Permit type: Capital improvement | Permit id: Exca-462793
2015/04/21095219 Western Av Allston Ma 02134
SCORE
59
New hvac plumbing electric sprinkler fire alarm tenant fit up as per plans
Date:  May 1, 2017
Value:   $1,600,000
Contractor: Domenick V Dileo

Client: President And Fellows Of | Permit type: Change occupancy | Permit status: Open | Current use: Comm | Permit id: Alt689023 | Parcel: 2200534000
2017/05/01160000059219 Western Av Allston Ma 02134Domenick V Dileo
SCORE
84
Installation of a 2 floor elevator minor hvac modifications and alterations to existing store front glass
Date:  March 16, 2017
Value:   $850,000
Contractor: Domenick Dileo

Client: President And Fellows Of | Permit type: Interior/exterior work | Permit status: Open | Current use: Mixed | Permit id: Alt676852 | Parcel: 2200534000
2017/03/1685000084219 Western Av Allston Ma 02134Domenick Dileo
SCORE
85
Short form bldg permit
Date:  August 2, 2012
Value:   $22,500
Contractor: Andrew Stone

Client: President And Fellows Of | Permit type: Excavation borings test pits | Permit status: Expired | Current use: Mixed | Permit id: Sf168751 | Parcel: 2200534000
2012/08/022250085219 Western Av Allston Ma 02134Andrew Stone
SCORE
100
New apartment building - temporary gas please note that this permit # should replace gas permit #g423564 which keeps giving me an error when i add the fixtures
Date:  December 2, 2014
Value:   $300,000
Contractor: Joseph Clancy

Client: President And Fellows Of | Permit type: Gas | Current use: 1-4fam | Permit id: G428186
2014/12/02300000100219 Western Av Allston Ma 02134Joseph Clancy
SCORE
91
Install a gas kiln
Date:  March 13, 2012
Value:   $10,000
Contractor: Andrew Culhane

Client: President And Fellows Of | Permit type: Gas | Current use: Comm | Permit id: G124628
2012/03/131000091219 Western Av Allston Ma 02134Andrew Culhane
SCORE
98
Convert exisitng primary service from 2. 4kv to 13. 8kv.
Date:  March 6, 2012
Value:   $30,000
Contractor: Dan Sullivan

Client: President And Fellows Of | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E122604 | Parcel: 2200534000
2012/03/063000098219 Western Av Allston Ma 02134Dan Sullivan
SCORE
91
Remove and dispose of existing 2 insulation and sarnafil roofing down to the old built-up roofing. Mechanically fasten 3. 3 polyisocyanurate roofi insulation. Fully adhere 60 mil sarnafil roofing system. Fabricate and install new bronze aluminum edge flashing. Furnish sarnafil 15 year warranty.
Date:  April 1, 2010
Value:   $171,445
Contractor: Edwin J Stasio

Client: President And Fellows Of | Permit type: Roofing | Permit status: Expired | Current use: Mixed | Permit id: Sf3350 | Parcel: 2200534000
2010/04/0117144591219 Western Av Allston Ma 02134Edwin J Stasio
SCORE
96
The interior demolition and abatement of the existing buildings at the site to prepare for the building razing. The building razing work will be done under separate permit.
Date:  January 22, 2014
Value:   $350,000
Contractor: Jason Nadeau

Client: President And Fellows Of | Permit type: Demolition - interior | Current use: Comm | Permit id: Sf314530
2014/01/2235000096219 Western Av Allston Ma 02134Jason Nadeau
SCORE
100
Need feeders and switchgear for temp service. Utility authorization#1984592
Date:  April 3, 2014
Value:   $10,000
Contractor: John Mclaughlin

Client: President And Fellows Of | Permit type: Electrical | Current use: Comm | Permit id: Ets349319
2014/04/0310000100219 Western Av Allston Ma 02134John Mclaughlin
SCORE
100
New apartment building.
Date:  April 1, 2014
Value:   $3,000,000
Contractor: Joseph Clancy

Client: President And Fellows Of | Permit type: Gas | Current use: Multi | Permit id: G346372
2014/04/013000000100219 Western Av Allston Ma 02134Joseph Clancy
SCORE
100
New apartment building.
Date:  April 3, 2014
Value:   $7,500,000
Contractor: Joseph Clancy

Client: President And Fellows Of | Permit type: Plumbing | Current use: Multi | Permit id: Pl346384
2014/04/037500000100219 Western Av Allston Ma 02134Joseph Clancy
SCORE
91
Replace gas fired kilns in a ceramics studio
Date:  January 24, 2012
Value:   $2,000
Contractor: Andrew Culhane

Client: President And Fellows Of | Permit type: Gas | Current use: Comm | Permit id: G115810
2012/01/24200091219 Western Av Allston Ma 02134Andrew Culhane
SCORE
93
Complete demolition of existing structure
Date:  March 14, 2014
Value:   $100,000

Client: President And Fellows Of | Permit type: Demolition - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf341820
2014/03/1410000093219 Western Av Allston Ma 02134Jdc Demolition Company Inc
SCORE
88
Rewire new gas kiln
Date:  April 5, 2012
Value:   $1,000
Contractor: Anthony Nardella

Client: President And Fellows Of | Permit type: Electrical | Current use: Comm | Permit id: E121837
2012/04/05100088219 Western Av Allston Ma 02134Anthony Nardella
SCORE
100
Furnish & install electrical distribution and tenant fit up for the 219 western ave building apartments garage & future retail
Date:  March 27, 2014
Value:   $6,000,000
Contractor: John Mclaughlin

Client: President And Fellows Of | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E347284 | Parcel: 2200534000
2014/03/276000000100219 Western Av Allston Ma 02134John Mclaughlin
SCORE
96
Install sheet piling to stabalize the site after the one story building is demolished
Date:  April 17, 2014
Value:   $160,000
Contractor: Jason Nadeau

Client: President And Fellows Of | Permit type: Excavation borings test pits | Current use: Comm | Permit id: Sf353361
2014/04/1716000096219 Western Av Allston Ma 02134Jason Nadeau
SCORE
91
Install a gas kiln
Date:  March 13, 2012
Value:   $10,000
Contractor: Andrew Culhane

Permit type: Gas permit | Expiration date: September 13, 2012 | Current use: Comm | Permit id: G124628
2012/03/131000091219 Western Av Allston MaAndrew Culhane
SCORE
100
Installation shall be inaccordance with the requirements of 7 cmr 8th edition and nfpa 72 and nfpa 96
Date:  July 9, 2015
Contractor: John Mclaughlin

Permit type: Bfd fire alarm installations | Permit id: Bfdf464409
2015/07/090100219 Western Av Allston MaJohn Mclaughlin
Install (2) soil borings; all work 9:30am-3;30pm;
Date:  June 19, 2014

Permit type: Excavation permit | Expiration date: June 25, 2014 | Permit id: Exca-375520
2014/06/19095219 Western Av Allston Ma
SCORE
91
Replace gas fired kilns in a ceramics studio
Date:  January 24, 2012
Value:   $2,000
Contractor: Andrew Culhane

Permit type: Gas permit | Expiration date: July 24, 2012 | Current use: Comm | Permit id: G115810
2012/01/24200091219 Western Av Allston MaAndrew Culhane
Sidewalk deposit during construction at barrys corner allston..; deposit covers 6 ramps and sidewalk area at 219 western ave and no. Harvard street/; this is not a permit to occupy excavate and/or install driveways; separate permits are required / deposit will be returned if completed work meets city standards and federal slope requirements.; permit; 60. 00; inspection; 500. 00; deposit 64 000. 00;
Date:  January 29, 2014

Permit type: Sidewalk deposit | Permit id: Sdep-323004
2014/01/29095219 Western Av Allston Ma
Bfd chemist certificate proces
Date:  June 24, 2015

Permit id: Chm487498
2015/06/24095219 Western Av Allston Ma
Welding for installation of ;heating ventilation and air conditioning piping system dpl 10/30/15 bfd paid detail required
Date:  June 10, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw469128
2015/06/10095219 Western Av Allston Ma
Welding only of steel reinforcement (re-bar) installation for concrete (dpl)
Date:  May 12, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw360477
2014/05/12095219 Western Av Allston Ma
Cutting burning &; welding for the installation of gas;piping &; water piping
Date:  May 9, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw359936
2014/05/09095219 Western Av Allston Ma
Burning of 8" &; 6" holes through metal stair landing;(dpl) sprinkler permit applied for (sprk#378715) &; attached
Date:  February 26, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw449446
2015/02/26095219 Western Av Allston Ma
Bfd application tank removal
Date:  July 16, 2013

Permit id: Bfdatr262455
2013/07/16095219 Western Av Allston Ma
Cutting/burning of steel safety stanchions for construction project; dpl 9/28/15
Date:  May 20, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw471135
2015/05/20095219 Western Av Allston Ma
Interior demo abatement &; demo of existing 1-story;structure;
Date:  January 22, 2014

Permit type: Bfd construction demo reno | Permit id: Fdc318099
2014/01/22095219 Western Av Allston Ma
Installation inaccordance with nfpa 13 nfpa 14 ;nfpa and 7 cmr
Date:  July 15, 2014

Permit type: Bfd sprinkler system | Permit id: Sprk378715
2014/07/15095219 Western Av Allston Ma
Light gauge metal &; panel fabrication weld pedestal a base of panel &; bar joist to tube steel top of panel
Date:  September 29, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw411574
2014/09/29095219 Western Av Allston Ma
Install conduit; 75 x 2 and 1 x 2; rdwy/sdwk / boston police area d; 343-4210; maintain pedestrian safety / parking lane and pedestrian walkway available at close of work day / pedestrian ramps damaged during construction are required to be restored to city and ada standards by; liberty concrete; extension
Date:  April 21, 2015

Permit type: Excavation permit | Expiration date: October 23, 2015 | Permit id: Exca-462793
2015/04/21095219 Western Av Allston Ma
Welding of elevator rail brackets in the hoistway for elevator cars dpl 2/18/15-7/18/15
Date:  February 20, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw448519
2015/02/20095219 Western Av Allston Ma
Erect and maintain pedestrian protective staging on sidewalk / 200x6; ; renewal
Date:  October 13, 2015

Permit type: Street occupancy permit | Expiration date: November 10, 2015 | Permit id: Occu-373433
2015/10/13095219 Western Av Allston Ma
Welding for installation of steel clips to support exterior glazing at canopies (dpl) bfd paid detail required
Date:  July 29, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw499627
2015/07/29095219 Western Av Allston Ma
Bfd chemist certificate proces
Date:  July 20, 2015

Permit id: Chm489857
2015/07/20095219 Western Av Allston Ma
SCORE
93
Complete demolition of existing structure
Date:  March 14, 2014
Value:   $100,000

Permit type: Short form bldg permit | Expiration date: September 14, 2014 | Current use: Comm | Permit id: Sf341820
2014/03/1410000093219 Western Av Allston MaJdc Demolition Company Inc
Installation shall be inaccordance with nfpa standards and 7 cmr 8th edition
Date:  July 22, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk493839
2015/07/22095219 Western Av Allston Ma
SCORE
88
Install wireless radio transmitter at main fire alarm control panel inaccordance with nfpa 72 section 26. 6. 3. 3. 2
Date:  September 19, 2012

Permit type: Bfd fire alarm installations | Permit id: Bfdf180873
2012/09/19088219 Western Av Allston MaPaul Dunphy Harvard University
Cut &; cap of all fire lines for the complete demo of building @ 219 western ave. In brighton bfd paid detail required 1 firefighter
Date:  December 10, 2013

Permit type: Bfd sprinkler system | Permit id: Sprk300963
2013/12/10095219 Western Av Allston Ma
Cutting / burning / welding for installation of steel sheet piles in support of excavation system for new building construction (dpl)
Date:  April 15, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw351291
2014/04/15095219 Western Av Allston Ma
SCORE
98
Convert exisitng primary service from 2. 4kv to 13. 8kv.
Date:  March 6, 2012
Value:   $30,000
Contractor: Dan Sullivan

Permit type: Electrical permit | Expiration date: September 6, 2012 | Current use: Comm | Permit id: E122604
2012/03/063000098219 Western Av Allston MaDan Sullivan
SCORE
100
New apartment building - temporary gas please note that this permit # should replace gas permit #g423564 which keeps giving me an error when i add the fixtures
Date:  December 2, 2014
Value:   $300,000
Contractor: Joseph Clancy

Permit type: Gas permit | Expiration date: June 2, 2015 | Current use: 1-4fam | Permit id: G428186
2014/12/02300000100219 Western Av Allston MaJoseph Clancy
SCORE
100
New apartment building.
Date:  April 1, 2014
Value:   $3,000,000
Contractor: Joseph Clancy

Permit type: Gas permit | Expiration date: October 1, 2014 | Current use: Multi | Permit id: G346372
2014/04/013000000100219 Western Av Allston MaJoseph Clancy
SCORE
96
Erect a 325 unit apartment building
Date:  July 16, 2015
Contractor: Jason Nadeau

Permit type: Bfd construction demo reno | Permit id: Fdc491761
2015/07/16096219 Western Av Allston MaJason Nadeau
Abandon inactive gas service; 5 x 4 rdwy; # 1381248190437; extension
Date:  October 31, 2013

Permit type: Excavation permit | Expiration date: May 4, 2014 | Permit id: Exca-298881
2013/10/31095219 Western Av Allston Ma
Cutting of structural steel (framing) ...(dpl 4-11-2014); bfd paid detail required
Date:  March 13, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw342913
2014/03/13095219 Western Av Allston Ma
SCORE
100
Need feeders and switchgear for temp service. Utility authorization#1984592
Date:  April 3, 2014
Value:   $10,000
Contractor: John Mclaughlin

Permit type: Electrical temporary service | Expiration date: October 3, 2014 | Current use: Comm | Permit id: Ets349319
2014/04/0310000100219 Western Av Allston MaJohn Mclaughlin
Complete demo of existing structure
Date:  January 10, 2014

Permit type: Bfd construction demo reno | Permit id: Fdc317921
2014/01/10095219 Western Av Allston Ma
Install new water sewer and fire pipe; 5x5; sdwk; / 40x10; 43x5; rdwy/sdwk; / boston police a; rdwy/sdwk; / all work 9: am to 3: pm; / ; maintain pedestrian safety access; cobucs # 1396398170024; dig safe; #; 2014-350-3939; extension
Date:  May 26, 2015

Permit type: Excavation permit | Expiration date: June 24, 2015 | Permit id: Exca-401938
2015/05/26095219 Western Av Allston Ma
SCORE
91
Remove and dispose of existing 2" insulation and sarnafil roofing down to the old built-up roofing. Mechanically fasten 3. 3" polyisocyanurate roofi insulation. Fully adhere mil sarnafil roofing system. Fabricate and install new bronze aluminum edge flashing. Furnish sarnafil 15 year warranty.
Date:  April 1, 2010
Value:   $171,445
Contractor: Edwin J Stasio

Permit type: Short form bldg permit | Expiration date: October 1, 2010 | Current use: Mixed | Permit id: Sf3350
2010/04/0117144591219 Western Av Allston MaEdwin J Stasio
Bfd chemist certificate proces
Date:  June 24, 2015

Permit id: Chm487679
2015/06/24095219 Western Av Allston Ma
Cutting / welding for installation of heating ventilation and air conditioning piping system for new construction of building (dpl)
Date:  November 12, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw424008
2014/11/12095219 Western Av Allston Ma
Cutting burning &; welding of steel relieving angles steel channel for;mock-u (foundation footing) ;framing erection &; decking ;(dpl12 -31-2014) ;;
Date:  May 15, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw361318
2014/05/15095219 Western Av Allston Ma
Welding; of tie feet to spandrel steel on the tie floors &; angles from the landing gates to existing steel
Date:  November 7, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw422230
2014/11/07095219 Western Av Allston Ma
Occupy manhole on sidewalk/ stand truck at curb / 2 police details area d 343-4210
Date:  August 5, 2014

Permit type: Street occupancy permit | Expiration date: August 12, 2014 | Permit id: Occu-319301
2014/08/05095219 Western Av Allston Ma
Cutting / burning / welding for installation of new dock leveler (dpl)
Date:  July 20, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw85641
2011/07/20095219 Western Av Allston Ma
Cutting / burning / welding for installation of new stairs (dpl)
Date:  July 20, 2011

Permit type: Bfd cutting-burning-welding | Permit id: Cbw82240
2011/07/20095219 Western Av Allston Ma
Operation for the erection of light gauge metal panel fabrications and steel bar joist systems bfd paid detail required
Date:  September 23, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw407848
2014/09/23095219 Western Av Allston Ma
SCORE
96
The interior demolition and abatement of the existing buildings at the site to prepare for the building razing. The building razing work will be done under separate permit.
Date:  January 22, 2014
Value:   $350,000
Contractor: Jason Nadeau

Permit type: Short form bldg permit | Expiration date: July 22, 2014 | Current use: Comm | Permit id: Sf314530
2014/01/2235000096219 Western Av Allston MaJason Nadeau
SCORE
96
Install sheet piling to stabalize the site after the one story building is demolished
Date:  April 17, 2014
Value:   $160,000
Contractor: Jason Nadeau

Permit type: Short form bldg permit | Expiration date: October 17, 2014 | Current use: Comm | Permit id: Sf353361
2014/04/1716000096219 Western Av Allston MaJason Nadeau
Cutting of rebar associated with construction of barrys corner (dpl 10-1-2014)
Date:  April 4, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw348870
2014/04/04095219 Western Av Allston Ma
Install handrails guardrails ladders seating stairs and other misc metal for new construction.
Date:  August 25, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw397827
2014/08/25095219 Western Av Allston Ma
Construction of a new 9 &; 6 story appartment building
Date:  November 19, 2014

Permit type: Bfd construction demo reno | Permit id: Fdc427443
2014/11/19095219 Western Av Allston Ma
SCORE
85
8 soil borings.
Date:  August 2, 2012
Value:   $22,500
Contractor: Andrew Stone

Permit type: Short form bldg permit | Expiration date: February 2, 2013 | Current use: Mixed | Permit id: Sf168751
2012/08/022250085219 Western Av Allston MaAndrew Stone
Bfd asbestos removal
Date:  January 7, 2014

Permit id: Asb317197
2014/01/07095219 Western Av Allston Ma
Cutting / burning / welding / brazing / soldering for installation of new heating and air conditioning piping system for construction of new building
Date:  November 3, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw419973
2014/11/03095219 Western Av Allston Ma
To conduct the following: store propane for hoc heaters to melt/dry decks and concrete five (5) 25lb propane tanks : applicant to follow nfpa 241 : also to store fuels in proper storage locker/cages : protected from vehicle traffic
Date:  October 17, 2014

Permit type: Bfd general permit | Permit id: Gp414004
2014/10/17095219 Western Av Allston Ma
Install electrical conduit; 56 x 2 rdwy; riley bros
Date:  March 24, 2015

Permit type: Excavation permit | Expiration date: May 24, 2015 | Permit id: Exca-455985
2015/03/24095219 Western Av Allston Ma
To conduct the following: 1 gallons of 1993 diesel fuel hi michael townes i m emailing you back about the application i brought in yesterday. I guess i left the line "to conduct the following" blank. That line should read "to store 1 gallons of (1993) diesel fuel for weld welding machines". Also i have here a pic of the fuel cell that we will be using. There will be concrete barriers around the cell for protection against traffic as well. Thank you pamela norton /allied pile driving
Date:  April 9, 2014

Permit type: Bfd general permit | Permit id: Gp350969
2014/04/09095219 Western Av Allston Ma
To conduct the following: for use of temporary portable heater two ;(2) model#sh-20 two (2) sh-40 &; one (1) idf 5 heater located at gound level outside of building duct work will be used to move heat up into building for concrete placements spray fireproofing and interior rough.;fuel type: natural gas;: applicant must monitor for co levels and record results
Date:  December 4, 2014

Permit type: Bfd general permit | Permit id: Gp427793
2014/12/04095219 Western Av Allston Ma
Welding only;of metal frame for a 35-cubic ft brick;gas kiln (dpl 4-30-12) bfd paid detail required
Date:  February 16, 2012

Permit type: Bfd cutting-burning-welding | Permit id: Cbw119460
2012/02/16095219 Western Av Allston Ma
Bagging of smoke detectors
Date:  August 13, 2015

Permit type: Bfd bag smoke detectors | Permit id: Bsd506325
2015/08/13095219 Western Av Allston Ma
Cutting burning &; welding of hand/guard rails ladders grating cmu clips stairs &; other misc metal fabrications (dpl) paid fire detail is now required
Date:  March 12, 2015

Permit type: Bfd cutting-burning-welding | Permit id: Cbw450806
2015/03/12095219 Western Av Allston Ma
SCORE
100
Phase -2 219 western ave. Phased application: south building floor 3-6 as second phase occupancy. North tower 1st floor garage & second floor south are phase 1
Date:  July 9, 2015
Contractor: John Mclaughlin

Permit type: Bfd fire alarm installations | Permit id: Bfdf482721
2015/07/090100219 Western Av Allston MaJohn Mclaughlin
SCORE
88
Rewire new gas kiln
Date:  April 5, 2012
Value:   $1,000
Contractor: Anthony Nardella

Permit type: Electrical permit | Expiration date: October 5, 2012 | Current use: Comm | Permit id: E121837
2012/04/05100088219 Western Av Allston MaAnthony Nardella
Temporary placement of dumbster;
Date:  November 19, 2014

Permit type: Bfd temporary dumpster | Permit id: Td427446
2014/11/19095219 Western Av Allston Ma
To conduct the following: using a diesel fired hot kettle to apply hot melt asphalt waterproofing above grade on ground level plaza and 2nd floor terrace : proper fire extinguisher required
Date:  May 8, 2015

Permit type: Bfd general permit | Permit id: Gp470552
2015/05/08095219 Western Av Allston Ma
Cutting &; burning;of steel for bldg mock-up (dpl)
Date:  July 10, 2014

Permit type: Bfd cutting-burning-welding | Permit id: Cbw376998
2014/07/10095219 Western Av Allston Ma
Abandon gas service; 5 x 4 rdwy;(money on deposit for sdwk); # 1396547880564; ds 2014-140-8568
Date:  April 22, 2014

Permit type: Excavation permit | Expiration date: May 17, 2014 | Permit id: Exca-352470
2014/04/22095219 Western Av Allston Ma
SCORE
100
New apartment building.
Date:  April 3, 2014
Value:   $7,500,000
Contractor: Joseph Clancy

Permit type: Plumbing permit | Expiration date: October 3, 2014 | Current use: Multi | Permit id: Pl346384
2014/04/037500000100219 Western Av Allston MaJoseph Clancy
SCORE
82
Welding and soldering to relocate water and gas lines (dpl) bfd paid detail required... No devirtion from prescribed safeguards &; conditions
Date:  October 14, 2016
Contractor: David Newbitt

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw645858 | Parcel: 2200534000
2016/10/14082219 Western Av Allston MaDavid Newbitt
SCORE
98
Cutting and welding steel piping on the ground floor of the 6 story building to relocate existing condenser water and heating hot water piping.(dpl) bfd paid detail required bfd paid detail required
Date:  October 20, 2016
Contractor: James Williams

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw644964 | Parcel: 2200534000
2016/10/20098219 Western Av Allston MaJames Williams
SCORE
82
Renewal of permit(s) sprk#378715+493839--to allow for job completion. Complete new sprinkler system for new construction. New system installation will consist of all fire protection components including 55 sprinkler heads lines mains risers fire pump standpipes and fire department connections.
Date:  October 26, 2016
Contractor: George Laws

Client: President And Fellows Of | Permit type: Bfd sprinkler system | Permit id: Sprk645846 | Parcel: 2200534000
2016/10/26082219 Western Av Allston MaGeorge Laws
Cutting burning welding for installation of steel sheet piles in support of excavation system for new building construction (dpl)
Date:  April 15, 2014

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw351291 | Parcel: 2200534000
2014/04/15095219 Western Av Allston Ma
To conduct the following: store propane for hoc heaters to melt dry decks and concrete five (5) 25lb propane tanks : applicant to follow nfpa 241 : also to store fuels in proper storage locker cages : protected from vehicle traffic
Date:  October 17, 2014

Client: President And Fellows Of | Permit type: Bfd general permit | Permit id: Gp414004 | Parcel: 2200534000
2014/10/17095219 Western Av Allston Ma
Cutting welding for installation of heating ventilation and air conditioning piping system for new construction of building (dpl)
Date:  November 12, 2014

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw424008 | Parcel: 2200534000
2014/11/12095219 Western Av Allston Ma
Cutting burning welding for installation of new stairs (dpl)
Date:  July 20, 2011

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw82240 | Parcel: 2200534000
2011/07/20095219 Western Av Allston Ma
Install conduit; 75 x 2 and 1 x 2; rdwy sdwk ; boston police area d; 343-4210; maintain pedestrian safety ; parking lane and pedestrian walkway available at close of work day ; pedestrian ramps damaged during construction are required to be restored to city and ada standards by; liberty concrete; extension
Date:  April 21, 2015

Client: President And Fellows Of | Permit type: Excavation permit | Expiration date: June 19, 2016 | Permit id: Exca-462793 | Parcel: 2200534000
2015/04/21095219 Western Av Allston Ma
To conduct the following: 1 gallons of 1993 diesel fuel hi michael townes i m emailing you back about the application i brought in yesterday. I guess i left the line "to conduct the following" blank. That line should read "to store 1 gallons of (1993) diesel fuel for weld welding machines". Also i have here a pic of the fuel cell that we will be using. There will be concrete barriers around the cell for protection against traffic as well. Thank you pamela norton allied pile driving
Date:  April 9, 2014

Client: President And Fellows Of | Permit type: Bfd general permit | Permit id: Gp350969 | Parcel: 2200534000
2014/04/09095219 Western Av Allston Ma
Cutting burning &; welding of steel relieving angles steel channel for;mock-u (foundation footing) ;framing erection &; decking ;(dpl12 -31-2014) ;
Date:  May 15, 2014

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw361318 | Parcel: 2200534000
2014/05/15095219 Western Av Allston Ma
Sidewalk deposit during construction at barrys corner allston..; deposit covers 6 ramps and sidewalk area at 219 western ave and no. Harvard street ; this is not a permit to occupy excavate and or install driveways; separate permits are required ; deposit will be returned if completed work meets city standards and federal slope requirements.; permit; 60. 00; inspection; 500. 00; deposit 64 000. 00;
Date:  January 29, 2014

Client: President And Fellows Of | Permit type: Sidewalk deposit | Permit id: Sdep-323004 | Parcel: 2200534000
2014/01/29095219 Western Av Allston Ma
Welding for installation of ;heating ventilation and air conditioning piping system dpl 10 30 15 bfd paid detail required
Date:  June 10, 2015

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw469128 | Parcel: 2200534000
2015/06/10095219 Western Av Allston Ma
Occupy manhole on sidewalk stand truck at curb 2 police details area d 343-4210
Date:  August 5, 2014

Client: President And Fellows Of | Permit type: Street occupancy permit | Expiration date: August 12, 2014 | Permit id: Occu-319301 | Parcel: 2200534000
2014/08/05095219 Western Av Allston Ma
Install new water sewer and fire pipe; 5x5; sdwk; ; 40x10; 43x5; rdwy sdwk; ; boston police a; rdwy sdwk; ; all work 9: am to 3: pm; ; ; maintain pedestrian safety access; cobucs # 1396398170024; dig safe; #; 2014-350-3939; extension
Date:  May 26, 2015

Client: President And Fellows Of | Permit type: Excavation permit | Expiration date: June 24, 2015 | Permit id: Exca-401938 | Parcel: 2200534000
2015/05/26095219 Western Av Allston Ma
Welding of elevator rail brackets in the hoistway for elevator cars dpl 2 18 15-7 18 15
Date:  February 20, 2015

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw448519 | Parcel: 2200534000
2015/02/20095219 Western Av Allston Ma
Cutting burning &; welding of hand guard rails ladders grating cmu clips stairs &; other misc metal fabrications (dpl) paid fire detail is now required
Date:  March 12, 2015

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw450806 | Parcel: 2200534000
2015/03/12095219 Western Av Allston Ma
Cutting burning welding for installation of new dock leveler (dpl)
Date:  July 20, 2011

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw85641 | Parcel: 2200534000
2011/07/20095219 Western Av Allston Ma
Erect and maintain pedestrian protective staging on sidewalk 200x6; ; renewal
Date:  October 13, 2015

Client: President And Fellows Of | Permit type: Street occupancy permit | Expiration date: November 10, 2015 | Permit id: Occu-373433 | Parcel: 2200534000
2015/10/13095219 Western Av Allston Ma
Cutting burning welding brazing soldering for installation of new heating and air conditioning piping system for construction of new building
Date:  November 3, 2014

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw419973 | Parcel: 2200534000
2014/11/03095219 Western Av Allston Ma
Cutting burning of steel safety stanchions for construction project; dpl 9 28 15
Date:  May 20, 2015

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw471135 | Parcel: 2200534000
2015/05/20095219 Western Av Allston Ma
Power for special event using generator model xdr 60 watt using gallons of diesel total
Date:  March 30, 2017

Client: President And Fellows Of | Permit type: Bfd general permit | Permit id: Gp693798 | Parcel: 2200534000
2017/03/30095219 Western Av Allston Ma
SCORE
82
Relocate 175 sprinkler heads to accommodate the fit out of the existing space on 1st floor as per plans. Per nfpa 13 and 7 cmr.
Date:  April 25, 2017
Contractor: George Laws

Client: President And Fellows Of | Permit type: Bfd sprinkler system | Permit id: Sprk695600 | Parcel: 2200534000
2017/04/25082219 Western Av Allston MaGeorge Laws
SCORE
82
Refeed relocate sprinkler piping to accommodate installation of a 2 floor elevator as per plans.
Date:  April 25, 2017
Contractor: George Laws

Client: President And Fellows Of | Permit type: Bfd sprinkler system | Permit id: Sprk691860 | Parcel: 2200534000
2017/04/25082219 Western Av Allston MaGeorge Laws
SCORE
93
Weld support plates to existing structural steel. (dpl) bfd paid detail required
Date:  May 4, 2017
Contractor: Andrew Arsenault

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw704631 | Parcel: 2200534000
2017/05/04093219 Western Av Allston MaAndrew Arsenault
SCORE
59
New hvac plumbing electric sprinkler fire alarm tenant fit up as per plans
Date:  May 1, 2017
Value:   $1,600,000
Contractor: Domenick V Dileo

Client: President And Fellows Of | Permit type: Long form/alteration permit | Expiration date: November 1, 2017 | Current use: Comm | Permit id: Alt689023 | Parcel: 2200534000
2017/05/01160000059219 Western Av Allston MaDomenick V Dileo
SCORE
82
Welding related to the installation of 3" gas line from the outside meter to trader joes on 1st floor and capped for future use. Pipe will run between garage level and 1st floor at trader joes. (dpl) bfd paid detail required
Date:  June 9, 2017
Contractor: David Newbitt

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw717415 | Parcel: 2200534000
2017/06/09082219 Western Av Allston MaDavid Newbitt
SCORE
84
Installation of a 2 floor elevator minor hvac modifications and alterations to existing store front glass
Date:  March 16, 2017
Value:   $850,000
Contractor: Domenick Dileo

Client: President And Fellows Of | Permit type: Long form/alteration permit | Expiration date: September 16, 2017 | Current use: Mixed | Permit id: Alt676852 | Parcel: 2200534000
2017/03/1685000084219 Western Av Allston MaDomenick Dileo
SCORE
82
Relocate 2 sprinkler heads on garage level. Per nfpa 13 and 7 cmr. (no more than one floor off at a time)
Date:  March 28, 2017
Contractor: George Laws

Client: President And Fellows Of | Permit type: Bfd sprinkler system | Permit id: Sprk685071 | Parcel: 2200534000
2017/03/28082219 Western Av Allston MaGeorge Laws
Bfd general permit
Date:  March 23, 2017

Client: President And Fellows Of | Permit id: Gp690560 | Parcel: 2200534000
2017/03/23095219 Western Av Allston Ma
SCORE
100
Install steel framing steel stairs railings and misc supports (dpl) bfd paid detail required
Date:  March 28, 2017
Contractor: Michael Rossi

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw690864 | Parcel: 2200534000
2017/03/280100219 Western Av Allston MaMichael Rossi
To erect a 20x tent
Date:  March 28, 2017

Client: President And Fellows Of | Permit type: Bfd tent with assembly | Permit id: Ta692449 | Parcel: 2200534000
2017/03/28095219 Western Av Allston Ma
SCORE
93
Welding of hood exhaust work into base building ductwork. Install weld transitions off the hood to main duct line (dpl) bfd paid detail required
Date:  July 20, 2017
Contractor: Andrew Arsenault

Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw732143 | Parcel: 2200534000
2017/07/20093219 Western Av Allston MaAndrew Arsenault
SCORE
100
Furnish & install electrical distribution and tenant fit up for the 219 western ave building apartments/garage & future retail
Date:  March 27, 2014
Value:   $6,000,000
Contractor: John Mclaughlin

Client: President And Fellows Of | Permit type: Electrical permit | Expiration date: September 27, 2014 | Current use: Comm | Permit id: E347284 | Parcel: 2200534000
2014/03/276000000100219 Western Av Allston MaJohn Mclaughlin
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.