Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Unit #22 - remodel and repairs - scope includes interior, non-structural work only: repairs to a toilet drain pipe located in the kitchen ceiling. (3) new can lights and (2) replacement can lights in kitchen. New drywall around existing wood burning fireplace in the living room on main level. Attic access relocated from the bathroom to the upstairs hallway. New bathtub, (1) new electrical fixture and finishes in the upstairs full bath. Reference cpl2017-00707. Client: Creek Cedar | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: September 14, 2017 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2017-02896 |