Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Repair existing double doors and install ne 44" x 75 3/4 door and hardware Date: August 29, 2000 Value: $5,000 Applicant: Same As Owner | Permit status: Finaled | Completion date: February 5, 2001 | Permit id: 0008180024 | |||||
SCORE 63 Remodel 2 public toilet rooms to be ada complians Applicant: Forest Lawn Memorial Parks | Permit status: Finaled | Completion date: June 18, 2001 | Permit id: 0011140029 | |||||
SCORE 70 Retaining wall in the garden of family love in rememberance area Applicant: Granath Clint | Permit status: Finaled | Completion date: April 30, 2003 | Permit id: 0112270016 | |||||
SCORE 59 Remove and reroof w cap sheet / astm d 61 63 Applicant: Coast Roof Co Inc | Permit status: Permisud | Permit id: 0207100047 | |||||
SCORE 59 Retaining wall 3-9 x 12 lf for in the garden of family love Applicant: Manzanares Michael | Permit status: Finaled | Completion date: July 13, 2006 | Permit id: 0408040044 | |||||
SCORE 62 Ada parking and walkway upgrade. Applicant: Stuber Charise | Permit status: Finaled | Completion date: May 22, 2006 | Permit id: 0411240028 | |||||
SCORE 82 Ada parking and walkway upgrade for mausoleum Applicant: Stuber Charise | Permit status: Permisud | Permit id: 0507220023 | |||||
SCORE 62 Roof top exhaust fan & duct Applicant: Stuber Charise | Permit status: Permisud | Permit id: 0607110038 | |||||
SCORE 100 New detached storage building 34 sf Applicant: Houchen Bryan | Permit status: Permisud | Permit id: 0711070064 | |||||
SCORE 82 Above ground wall crypts 20 sf storage rm 1 sf site ret. Walls (l=h5)from 40to 14 high Applicant: Manzanarez Michael | Permit status: Finaled | Completion date: April 7, 2011 | Permit id: 0803280013 | |||||
SCORE 98 Free standing pump house & electrical rm Applicant: Manzanares Michael | Permit status: Initiate | Permit id: 0908280024 | |||||
SCORE 98 6" conc w/4 pad footing and anchorage for car lift Applicant: Main Rob | Permit status: Finaled | Completion date: January 4, 2010 | Permit id: 0911050057 | |||||
SCORE 99 Patio cover Applicant: Titizian Dikran | Permit status: Finaled | Completion date: July 15, 2010 | Permit id: 1002030015 | |||||
SCORE 74 Installation of new ceiling in the sanctuary of inspiration within christian hertige mausoselum Applicant: Munz Construction | Permit status: Finaled | Completion date: November 4, 2011 | Permit id: 1002160094 | |||||
SCORE 74 Cut openings in existing blockwall reinforce with steel Applicant: Same As Contractor | Permit status: Finaled | Completion date: July 5, 2011 | Permit id: 1101270035 | |||||
SCORE 90 Installation of two above ground water tanks and foundations for irrigation system. 91,862 gallon tanks. Applicant: Fleming Environment Inc | Permit status: Finaled | Completion date: December 2, 2011 | Permit id: 1104140058 | |||||
Construction of an above ground crypt and retaining walls 31 sf crypt and 304length x 6 height Date: September 6, 2012 Value: $1,000,000 Applicant: Same As Owner | Permit status: Finaled | Completion date: July 25, 2014 | Permit id: 1112070005 | |||||
SCORE 99 Enclose exst chimney stack of refactory unit. Applicant: Maldonado Robert | Permit status: Permisud | Permit id: 1208300069 | |||||
Free standing pump house & electrical rm Date: September 26, 2012 Value: $138,300 Applicant: Same As Owner | Permit status: Finaled | Completion date: October 4, 2013 | Permit id: 1209200081 | |||||
New retaining wall 6to 14added due to cemetery crypts installation Date: August 20, 2013 Value: $280,000 Applicant: Same As Owner | Permit status: Finaled | Completion date: April 9, 2015 | Permit id: 1304110083 | |||||
SCORE 59 Columbarium addition 22. 5 sf Applicant: Dorantes George | Permit status: Finaled | Completion date: April 9, 2015 | Permit id: 1403130077 | |||||
SCORE 63 Remodel 2 public toilet rooms to be ada complians Date: March 8, 2001 Contractor: Continental Construction Management Applicant: Forest Lawn Memorial Parks | Permit status: Finaled | Completion date: June 18, 2001 | Permit id: 0103080008 | |||||
SCORE 82 Electrical to repair 2 miscellaneous conduitors Date: July 5, 2006 Contractor: Craig Robert Bays Electric Applicant: Bays Craig | Permit status: Permisud | Permit id: 0607050010 | |||||
SCORE 100 Install (7) pole lights (16h) Date: March 28, 2007 Contractor: Advanced Contractors Applicant: Edwards Roger | Permit status: Permisud | Permit id: 0703280044 | |||||
SCORE 100 Electrical work for new detached storage bldg Date: February 14, 2008 Contractor: Advanced Contractors Applicant: Houchen Bryan | Permit status: Permisud | Permit id: 0802140012 | |||||
SCORE 100 A/c unit (1st fl equipment chiller rm) c/o Date: May 21, 2008 Contractor: Acco Engineered Systems Applicant: Acco Engineered Systems | Permit status: Permisud | Permit id: 0805210036 | |||||
SCORE 82 Install (2) 2" "conduit only" for future potential re-routed repair of electrical system & (2) 2" conduit data/phone sys. Each line 425 issued per mazen & amil. Date: August 29, 2008 Contractor: Craig Robert Bays Electric Applicant: Stuber Charise | Permit status: Finaled | Completion date: September 15, 2008 | Permit id: 0807090027 | |||||
SCORE 70 El work & 60amp breaker for (2) sum pumps Date: July 14, 2008 Contractor: D J Scheffler Inc Applicant: Dorin | Permit status: Permisud | Permit id: 0807140021 | |||||
SCORE 99 Refrigerator hook up,two lighting circuits and electric w/h Date: September 3, 2008 Contractor: Munz Construction Applicant: Munz Paul | Permit status: Finaled | Completion date: June 10, 2009 | Permit id: 0809030040 | |||||
SCORE 98 Electrical permit for car lift Date: November 5, 2009 Contractor: Able Restoration Applicant: Main Robel | Permit status: Finaled | Completion date: January 4, 2010 | Permit id: 0911040024 | |||||
SCORE 74 Electrical permit for mauseleum Date: February 2, 2011 Contractor: Joseph William Kurn Applicant: Kurn Joseph | Permit status: Finaled | Completion date: November 4, 2011 | Permit id: 1008120016 | |||||
SCORE 74 Installation of new electrical circuit for door and also, installation of electrical for new equipment. Date: July 6, 2011 Contractor: Joseph William Kurn Applicant: Same As Contractor | Permit status: Finaled | Completion date: July 18, 2011 | Permit id: 1107060021 | |||||
SCORE 99 Swamp cooler installed on the ground. Date: February 15, 2012 Contractor: Air Tro Inc Applicant: Tony | Permit status: Finaled | Completion date: April 12, 2012 | Permit id: 1202150041 | |||||
SCORE 98 Electical permit for pump house Date: October 10, 2012 Contractor: Electro Construction Corp Applicant: Maples Zachary | Permit status: Finaled | Completion date: October 4, 2013 | Permit id: 1209260013 | |||||
SCORE 82 Soil preparation-install sod for abiding trust 4. 5 & 5 area (area has been changed to map 6 & 5. 5) chapt 71 requirements Date: April 13, 2000 Contractor: Forest Lawn Co Applicant: Escobar Eric | Permit status: Permisud | Permit id: 0002040001 | |||||
Landscape plan for vista section,vale of faith section, victory section/ 298 sq ft Date: July 21, 2000 Applicant: Same As Owner | Permit status: Permisud | Permit id: 0007210001 | |||||
SCORE 70 Landscape plan for portion of vista portion of map #1 Date: December 29, 2000 Contractor: Forest Lawn Co. A And E Dept Applicant: Escobar Erick | Permit status: Finaled | Completion date: May 30, 2001 | Permit id: 0010230001 | |||||
SCORE 70 Date: December 29, 2000 Contractor: Forest Lawn Co. A And E Dept Applicant: Escobar Erick | Permit status: Finaled | Completion date: May 30, 2001 | Permit id: 0011080001 | |||||
SCORE 60 Construct four retention - wetland mitigation (4 retention basins & desilting basin) Date: May 6, 2003 Contractor: E C Construction Co Applicant: Granath Clint | Permit status: Finaled | Completion date: February 19, 2004 | Permit id: 0211070004 | |||||
SCORE 70 Install shear pins Date: July 27, 2006 Contractor: D J Scheffler Inc Applicant: Scheffler | Permit status: Finaled | Completion date: July 29, 2011 | Permit id: 0604050002 | |||||
SCORE 82 "radiance" section #13 #14 #15 Date: April 19, 2007 Contractor: Forest Lawn Co Applicant: Manzanarez Michael | Permit status: Permisud | Permit id: 0704190003 | |||||
SCORE 59 Grading:phase i 917,917 cubic yards Date: January 7, 2009 Contractor: Forest Lawn Memorial Associates Applicant: Titizian Dikran | Permit status: Finaled | Completion date: May 14, 2009 | Permit id: 0801170004 | |||||
Grading work for phase ii Date: September 26, 2012 Applicant: Same As Owner | Permit status: Finaled | Completion date: April 12, 2013 | Permit id: 1105170001 | |||||
SCORE 100 C/o air handeling unit (replacement) 1st flr equimpment Date: February 21, 2006 Contractor: Acco Engineered Systems Applicant: Acco Lou | Permit status: Finaled | Completion date: December 22, 2008 | Permit id: 0602210020 | |||||
SCORE 100 C/o air handeling unit (replacement) 1st flr equipment (chiller room) Date: September 10, 2007 Contractor: Acco Engineered Systems Applicant: Acco Lou | Permit status: Finaled | Completion date: December 22, 2008 | Permit id: 0707090014 | |||||
SCORE 100 C/o air handeling unit (replacement) 1st flr equipment (chiller room) Date: November 5, 2008 Contractor: Acco Engineered Systems Applicant: Acco Lou | Permit status: Permisud | Permit id: 0811050017 | |||||
SCORE 72 Plumbing to install clarifier Date: January 19, 2000 Contractor: Barrington Plumbing Applicant: Wirz Richard | Permit status: Finaled | Completion date: March 23, 2000 | Permit id: 0001190018 | |||||
SCORE 70 (2) sum pumps Date: July 14, 2008 Contractor: D J Scheffler Inc Applicant: Dorin | Permit status: Permisud | Permit id: 0807140013 | |||||
SCORE 99 Condensate drain and electric w/h (2) hose bibs from w/h Date: September 3, 2008 Contractor: Munz Construction Applicant: Munz Paul | Permit status: Finaled | Completion date: June 10, 2009 | Permit id: 0809030026 | |||||
SCORE 93 Repair approx sewer line for chapel Date: February 6, 2008 Contractor: Western Supreme Rooter Inc Applicant: Bottala | Permit status: Finaled | Completion date: February 13, 2008 | Permit id: 0802060004 |