Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Lot consolidation to create 1 lot from 8 lots. Create non accessory surface parking lot having 1 spaces in tandem stacked configuration-valet parking, w 14 bicycle spaces. Valet booth, 1 story structure, 1 f s, d f, i i accessory sign 82 sides Date: June 20, 2016 Permit type: Zoning permit | Permit status: Completed | Completion date: June 20, 2016 | Permit id: 681653 | |||||
SCORE 100 For the complete demolition of a detached two-story structure. Full sidewalk and street closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. 21 day posting required prior to commencing demolition. Asbeostos removal required prior to commencing work. Safety zone: 19. 5 ft Date: December 13, 2016 Contractor: Geppert Bros. Inc Permit type: Demolition permit | Permit status: Completed | Completion date: February 1, 2017 | Permit id: 729906 | |||||
SCORE 100 New plumbing construction for the drainage of a new surface parking lot - 18" sewer connection, (3)catch basins and a trench drain-pa1#20170302439-"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: February 6, 2017 Contractor: Albert J Sgro Mechanical Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 755587 | |||||
SCORE 100 Install new 1 electric service meter and panel (6)parking lot pole lights. 1 power for parking booth,3 power to gate equipment and 5 data outlet points per 2008 nec (parking lot) Date: April 27, 2017 Contractor: Arrow Electric Services Inc Permit type: Electrical permit | Permit status: Completed | Completion date: August 29, 2017 | Permit id: 754437 |