Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Equipment work Date: March 19, 2003 Contractor: Ranshaw Fuel, Plbg And Htg Permit status: Permit issued | Permit id: 40162128701 | |||||
SCORE 99 Date: March 19, 2003 Contractor: Richard Bonelli Client: Peter Stathatos | Client Address: 150-35 16th Road Whitestone Ny 11357 | Client Phone: (917) 991-1749 | Permit status: Initial | Permit id: 401621287 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: March 25, 2003 Permit type: Gc | Permit id: E318828 | |||||
Apartment #a2: scrub down entire bathroom with solution of bleach water. Repair window sill complete. Paint entire bathroom with 1 coat stain kill Date: December 11, 2002 Permit type: Gc | Permit id: E310696 | |||||
As per rc #2003002573104 (iatl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 meth Date: October 20, 2003 Permit type: Delead | Permit id: E406288 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: September 26, 2003 Permit type: Gc | Permit id: E404739 | |||||
Apartment #a2: wash out all mold & mildew through out entire bathroom with bleach & water solution; then apply 1 coat stain killer and 1 coats paint. Date: December 31, 2002 Permit type: Gc | Permit id: E311988 |