Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Renovate building, remove interior exist stair and install outside the building. Fill in floor opening from stair removal. Second floor add bathroom and change bathroom to powder room. Install closet and move garage wall. Install new exterior stairs and rear deck. Remove boiler and install hwhs and heat pump system. Client: Daniel Calabrese | Client Address: 209 31st Street Brooklyn Ny 11232 | Client Phone: (917) 453-2480 | Client Company: N.A. | Permit type: Remove stair | Permit id: 321502566 |